Items where Subject is "TC Hydraulic engineering. Ocean engineering"
- Library of Congress Subject Areas (210)
- T Technology (210)
- TC Hydraulic engineering. Ocean engineering (210)
- T Technology (210)
A
ABDILLAH, SUHARI RACHMAN (2015) PERAMALAN PERILAKU RESERVOIR “X” PADA LAPANGAN “Y” DENGAN METODE COMBINED AQUIFER AND RESERVOIR EXPANSION TERM DI PT. PERTAMINA EP ASSET 3 CIREBON. Other thesis, UPN "Veteran" Yogyakarta.
ACHMAD, IMAM (2013) EVALUASI PENANGGULANGAN KICK DENGAN METODE BULLHEAD SUMUR EKSPLORASI“BMH-1” LAPANGAN “CILAMAYA SELATAN” PT. PERTAMINA EP. Masters thesis, UPN "VETERAN" YOGYAKARTA.
ACHMAD, IMAM (2013) EVALUASI PENANGGULANGAN KICK DENGAN METODE BULLHEADSUMUR EKSPLORASI“BMH-1” LAPANGAN “CILAMAYA SELATAN” PT. PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
ADIATMA, TRI (2013) ANALISA TRAJECTORY PEMBORAN BERARAH DAN GAYA-GAYA YANG BEKERJA PADA RANGKAIAN DRILLSTRING PADA SUMUR “X” LAPANGAN AIR SERDANG JOB PERTAMINATALISMAN (OK) LTD. Other thesis, UPN "VETERAN" YOGYAKARTA.
ADIGUNA, YOSHYRO (2015) EVALUASI DESAIN PRODUCTION CASING 7” DENGAN MENGGUNAKAN METODE GRAFIS PADA SUMUR “HITAM” LAPANGAN “PUTIH” PT. PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
ADITYA W., R. NUGROHO (2015) PERENCANAAN ESP SEBAGAI METODE PENGANGKATAN PADA SUMUR KS-XX LAPANGAN KAJI-SEMOGA PT.MEDCO E&P RIMAU ASSET. Other thesis, UPN "Veteran" Yogyakarta.
ADIYAKSA, DENI BHAKTI (2015) EVALUASI TEKNIS PENGGUNAAN KOMPRESOR GAS UNTUK KEPERLUAN DEHYDRATION UNIT PADA LAPANGAN “SG” PT ENERGI MEGA PERSADA (EMP) GELAM - JAMBI. Other thesis, UPN "Veteran" Yogyakarta.
ADRIANSYAH, YOGIE FIKRI (2012) STUDI OPTIMALISASI PRODUKSI BERDASARKAN EVALUASI POMPA SUCKER ROD DAN SISTEM JARINGAN STASIUN PENGUMPUL "X" LAPANGAN "Y" PT. PERTAMINA EP REGION SUMATERA. Other thesis, UPN "Veteran" Yogyakarta.
AGUSTIANTO, ANGGA TRI (2015) EVALUASI ELECTRIC SUBMERSIBLE PUMP (ESP) TERPASANG UNTUK OPTIMASI PRODUKSI SUMUR “TBN–10” PADA LAPANGAN SABAR STRUKTUR “S” DI PT. PERTAMINA EP ASSET 3. Other thesis, UPN "Veteran" Yogyakarta.
AKBAR, FAIS (2012) ANALISA PENERAPAN TEKNIK PEMBORAN MANAGED PRESSURE DRILLING (MPD) PADA TRAYEK 8½” SUMUR X-5 LAPANGAN Y-1. Other thesis, UPN "Veteran" Yogyakarta.
AKBAR D, RHEZA (2014) SKENARIO PRODUKSI PADA JARINGAN PIPA UNTUK MENCAPAI TARGET KONSUMEN LAPANGAN GAS PT. LAPINDO BRANTAS. Other thesis, UPN "VETERAN" YOGYAKARTA.
AL-ATTAS, MOHAMMED SHEIKH SALEM (2012) OPTIMASI PRODUKSI PADA SUMUR “X” DAN “Y” DENGAN MENGGUNAKAN CONTINUOUS GAS LIFT. Other thesis, UPN "Veteran" Yogyakarta.
ALFADILLA, RIO (2015) EVALUASI HIDROLIKA PAHAT DAN PENGANGKATAN CUTTING PADA TRAYEK 8 ½ PEMBORAN SUMUR “RA-1” LAPANGAN “SANGASANGA” PT. PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
AMBANAGA, ADITYA SAPUTRA (2015) PEMANFAATAN GARAM AIR LAUT DAERAH “X” SEBAGAI BAHAN ADITIF SEMEN PENGEBORAN. Other thesis, UPN "Veteran" Yogyakarta.
AMPERIANTO, R. AGUS (2021) EVALUASI DAN OPTIMASI PRODUKSI CARBONATE RESERVOIR MENGGUNAKAN IDENTIFIKASI BYPASSED OIL DI “AA” FIELD DENGAN INTEGRASI SATURASI LOG. Diploma thesis, UPN "VETERAN" YOGYAKARTA.
AMRULLAH, HANIF (2014) EVALUASI MATRIX ACIDIZING PADA SUMUR “P” DAN ”Q” DI LAPANGAN “Y” PT. PERTAMINA EP ASSET 3. Other thesis, UPN "VETERAN" YOGYAKARTA.
ANDHIKA, RM EMILLIO (2013) EVALUASI DAN OPTIMASI METODE PRODUKSI PADA SUMUR SPA-10 LAPANGAN “Y”. Masters thesis, UPN "VETERAN" YOGYAKARTA.
ANDRIAN, BONNI (2012) EVALUASI INTERVAL PERFORASI TERHADAP LAJU PRODUKSI KRITIS PADA SUMUR “AMARTA-7” LAPANGAN “AMARTA” PETROCHINA INTERNATIONAL JABUNG LTD. Other thesis, UPN "Veteran" Yogyakarta.
ANGGRAINI, WITA ROSMALA SARI (2011) ANALISIS PENGARUH REINJEKSI TERHADAP KINERJA RESERVOIR VAPOR DOMINATED BERDASARKAN KINERJA PRODUKSI SUMUR DAN TEKANAN RESERVOIR DI LAPANGAN DARAJAT. Other thesis, UPN "Veteran" Yogyakarta.
APRILIANTO, LUTHFI (2024) EVALUASI ACID WASH PADA SUMUR INJEKSI AIR HW-89 & UT-545 PADA LAPISAN ARAB-D ZONE DI LAPANGAN GHAWAR SAUDI ARABIA. Masters thesis, UPN Veteran Yogyakarta.
ARDIYANTO, BAGUS INDRA (2013) MONITORING KINERJA SUMUR-SUMUR GAS LIFT PADA LAPANGAN “X. Other thesis, UPN "VETERAN" YOGYAKARTA.
ARIFIANTO, TRI ADI (2013) PEMODELAN JARINGAN DAN OPTIMASI LIFTING BLOCK STATION “X” PADA LAPANGAN “Y” DENGAN MENGGUNAKAN SIMULATOR PIPESIM. Other thesis, UPN "VETERAN" YOGYAKARTA.
ARIYANTO, BAMBANG (2013) KAJIAN BLENDING BATUBARA UNTUK MEMENUHI PERMINTAAN PASAR PT. DIVA KENCANA BORNEO, SILUQ NGURAI, KUTAI BARAT, KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
ATMAJA, RIFKY PRANADIKA NATA (2015) OPTIMASI POMPA BENAM LISTRIK DENGAN CARA UP SIZE PUMP BERDASARKAN MASALAH KEPASIRAN PADA SUMUR X, Y dan Z di LAPANGAN CNOOC SES.Ltd. Other thesis, UPN "Veteran" Yogyakarta.
AYATANOI, PASCALINA ARIESTA (2012) EVALUASI PELAKSANAAN PENGASAMAN MATRIKS PADA SUMUR “X-249” LAPANGAN “Y” PERTAMINA UBEP LIMAU. Other thesis, UPN "Veteran" Yogyakarta.
Amalia, Galih Ayu (2014) EVALUASI KESTABILAN LUBANG BOR MENGGUNAKAN DATA LOG DENGAN TEORI PENDEKATAN SAFE MUD WINDOW SUMUR ALPHA-1 LAPANGAN BETA. Other thesis, UPN "VETERAN" YOGYAKARTA.
Astolaksono, Danang Dwi (2013) EVALUASI DAN OPTIMASI DESIGN ELECTRIC SUBMERSIBLE PUMP PADA SUMUR “X” LAPANGAN “Y”. Other thesis, UPN "VETERAN" YOGYAKARTA.
B
B R A MA N T Y O, R O R I (2012) E V A L U A S I D A N O P T I MA S I P O MP A S U C K E R R O D S U MU R “ L R - X 1 ” D A N “ A N - X 2 ” L A P A N G A N L I R I K P T . P E R T A MI N A U B E P L I R I K. Other thesis, UPN "veteran" Yogyakarta.
BAIQUNY, SYAFRYAN (2015) EVALUASI OPERASI NITRIFIED ACID DENGAN MENGGUNAKAN COILED TUBING PADA SUMUR “ KTG – 10 ” LAPANGAN “TAMBUN” P.T. BUKITAPIT BUMI PERSADA. Other thesis, UPN "Veteran" Yogyakarta.
BAREN, MICHAEL TARAN (2012) EVALUASI PEROLEHAN MINYAK DENGAN WATERFLOODING PADA SEKSI “X” LAPISAN “A” UNIT BISNIS PERTAMINA EP LIMAU. Other thesis, UPN "Veteran" Yogyakarta.
BHAKTI, RICKY VIKRA (2024) PENENTUAN ZONA PRODUKTIF HIDROKARBON PADA SUMUR “VIK” LAPANGAN “RVB” BERDASARKAN DATA LOG. Other thesis, UPN Veteran Yogyakarta.
BRIA, FLORIANO SANCHO DA COSTA (2015) STUDI SIMULASI RESERVOIR PENINGKATAN PEROLEHAN MINYAK MENGGUNAKAN INJEKSI POLIMER PADA LAPISAN “X” LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
Baskoro, Yoga Tri (2015) EVALUASI STIMULASI PEREKAHAN HIDROLIK PADA SUMUR X-12 LAPANGAN X PT. PERTAMINA EP REGION JAWA BAGIAN BARAT. Other thesis, UPN "Veteran" Yogyakarta.
Bayu W, Tri Yulian (2013) KAJIAN TEKNIS ALAT MUAT DAN ALAT ANGKUT UNTUK MENINGKATKAN PRODUKSI TANAH PENUTUP PADA PENAMBANGAN BATUBARA, PT. LANNA HARITA INDONESIA, SAMARINDA, KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
C
CAHYO, SEPTIAN DWI (2013) ANALISA METODE PEMBORAN MANAGED PRESSURE DRILLING PADA TRAYEK 8½” SUMUR “X-03” LAPANGAN KEDUNGTUBAN PT PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
CAPRIATI, FLORENTINA (2014) PERANCANGAN SISTEM DEHIDRASI GAS ALAM DENGAN TRIETHYLENE GLYCOL UNTUK MINIMUM LAJU GAS INLET PADA LAPANGAN “X” JOB PERTAMINA-TALISMAN JAMBI MERANG. Masters thesis, UPN "VETERAN" YOGYAKARTA.
CRISTINE, ELIZABETH (2015) EVALUASI PROBLEM PIPA TERJEPIT PADA TRAYEK 8 ½” SUMUR “X” LAPANGAN “Y” PT PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
D
DANANJOYO, BAGUS HARYO (2012) ANALISA PRESSURE BUILD UP PADA SUMUR “X” LAPANGAN “Y” DENGAN METODE HORNER PLOT. Other thesis, UPN "Veteran" Yogyakarta.
DARGAYANA, ROBIUL PRIYANDRI (2012) RE-DESIGN POMPA SUCKER ROD BERDASARKAN DATA SONOLOG, DAN DIAGRAM GOODMAN PADA SUMUR “X”LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
DARMAWAN, FIKRI RUM (2012) ANALISA TEKANAN JARINGAN BERDASARKAN PERFORMANCE SUMUR DAN TEKANAN KERJA SEPARATOR PADA BLOCK STATION-A LAPANGAN “F” DENGAN MENGGUNAKAN SIMULATOR PIPESIM. Other thesis, UPN "Veteran" Yogyakarta.
DARMAWAN, RAMA PRATHAMA WISNU (2012) PENENTUAN TEKANAN INJEKSI OPTIMUM PADA PELAKSANAAN INJEKSI AIR (WATERFLOODING) BERDASARKAN GRADIEN REKAH FORMASI PADA SUMUR “KAS-200” PT. PERTAMINA EP UBEP JAMBI. Other thesis, UPN "Veteran" Yogyakarta.
DESMANUAR, RAY (2012) ANALISA INTERWELL TRACER TEST DENGAN BANTUAN CHEARS SIMULATOR UNTUK MENGOPTIMASIKAN KONDISI RESERVOIR PADA PROYEK INJEKSI SURFACTANT-POLYMER PADA LAPANGAN SFT-2. Other thesis, UPN "Veteran" Yogyakarta.
E
ERLANGGA, OKTA (2014) STUDI SIMULASI RESERVOIR UNTUK PERENCANAAN PENGEMBANGAN LAPANGAN PADA LAPANGAN “XYZ” LAPISAN “O” PT. PERTAMINA EP. Other thesis, UPN "VETERAN" YOGYAKARTA.
Erianto, Saktia (2012) PERENCANAAN ELECTRIC SUBMERSIBLE PUMP SEBAGAI METODE PENGANGKATAN PADA SUMUR SPA-34 LAPANGAN SOPA PT.PERTAMINA EP REGION SUMATERA. Other thesis, UPN "Veteran" Yogyakarta.
F
F U A D Y, R I Z K I P E R D A N A WA N (2012) O P T I MA S I P E N C A MP U R A N P A D A P E N A MB A N G A N B A U K S I T D I P T . H A R I T A P R I MA A B A D I MI N E R A L S I T E A I R U P A S K E T A P A N G K A L I MA N T A N B A R A T. Other thesis, UPN "Veteran" Yogyakarta.
FASYA, ANGGA LACIA (2012) PERENCANAAN ELECTRIC SUBMERSIBLE PUMP SEBAGAI LIFTING METHODE PADA SUMUR “X” RESERVOIR “A” LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
FAUZAN R.AS, MOH. REZA (2015) PERENCANAAN KONVERSI ARTIFICIAL LIFT DARI SUCKER ROD PUMP MENJADI ELECTRIC SUBMERSIBLE PUMP PADA SUMUR „„X‟‟ LAPANGAN „„Y‟‟ PT. PERTAMINA EP ASSET 2 PRABUMULIH FIELD. Other thesis, UPN "Veteran" Yogyakarta.
FEBRIANTO, DIDIT (2014) ANALISA PENANGGULANGAN TOTAL LOSS PADA TRAYEK 17 ½” DENGAN METODE BLIND DRILLING SUMUR “DF-11” LAPANGAN “CILAMAYA UTARA” PT. PERTAMINA EP. Other thesis, UPN "VETERAN" YOGYAKARTA.
FERNANDHEAF, ADITHYA (2012) ANALISA PRESSURE TRANSIENT ANALYSIS SUMUR “X” PADA LAPANGAN PANASBUMI STAR ENERGY GEOTHERMAL WAYANG WINDU LTD. Other thesis, UPN "Veteran" Yogyakarta.
FINANTA, HARDIAN ADHI (2017) EVALUASI DAN OPTIMASI LAJU PRODUKSI UNTUK DESAIN ULANG POMPA BENAM LISTRIK SUMUR “KAS-199” PADA LAPANGAN “PT. PERTAMINA ASSET 1 JAMBI”. Other thesis, UPN "VETERAN" YOGYAKARTA.
G
GABRIEL H, EMILE FRANCOIS (2015) ANALISA PRESSURE BUILD UP (PBU) TEST DENGAN MENGGUNAKAN METODE HORNER MANUAL DAN SAPHIRE 3.20 PADA SUMUR “X” LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
GEOTIFANI, TIKA (2013) PERAMALAN PERILAKU RESERVOIR WATER DRIVE LAPANGAN “BG-08” PT. CHEVRON PACIFIC INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
GERINA, STELLA FANNY (2014) EVALUASI KINERJA WATERFLOODING PADA LAPISAN A LAPANGAN TALANG JIMAR PT PERTAMINA EP. Masters thesis, UPN "VETERAN" YOGYAKARTA.
GHIFARIHADI, MUHAMMAD (2019) IDENTIFIKASI PERSEBARAN DAN CADANGAN ENDAPAN PASIR MENGGUNAKAN METODE GEOLISTRIK KONFIGURASI WENNER SCHLUMBERGER DI DAERAH SRUMBUNG, KABUPATEN MAGELANG, JAWA TENGAH. Other thesis, Universitas Pembangunan Nasional Veteran Yogyakarta.
GUTERRES, EDUARDO DE SOUSA (2013) OPTIMASI LAJU PRODUKSI BERDASARKAN INTERVAL PERFORASI PADA SUMUR LS-XX DI LAPANGAN SAGO AREA LIRIK UNIT BISNIS PERTAMINA EP REGION SUMATERA UNTUK DESAIN ULANG POMPA BENAM LISTRIK. Other thesis, UPN "VETERAN" YOGYAKARTA.
H
HABIB, NOOR (2012) PERENCANAAN ELECTRIC SUBMERSIBLE PUMP DI SUMUR “X” PADA LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
HAIKAL, MUHAMMAD (2015) EVALUASI HIDROLIKA PAHAT DAN PENGANGKATAN CUTTING PADA TRAYEK 8 ½” SUMUR B11 LAPANGAN BANYU URIP. Other thesis, UPN "Veteran" Yogyakarta.
HAIRIL, ACHMAD (2014) STUDI SIMULASI RESERVOIR DALAM RANGKA PENGEMBANGAN BLOK “X” LAPISAN “L” DI PERTAMINA EP UNTUK MENINGKATKAN PEROLEHAN MINYAK. Masters thesis, UPN "VETERAN" YOGYAKARTA.
HAKIM, ARIF RACHMAN (2011) EVALUASI HIDROLIKA LUMPUR PEMBORAN DAN AERATED DRILLING PADA SUMUR X-3 STAR ENERGY GEOTHERMAL WAYANG WINDU. Other thesis, UPN "Veteran" Yogyakarta.
HANARDI, EKO NIRWANTO PUTRO (2012) KAJIAN HIDROLIKA LUMPUR PADA PEMBORAN BERARAH UNTUK OPTIMASI LAJU PEMBORAN SUMUR “X” LAPANGAN “Y”. Other thesis, UPN "VETERAN" YOGYAKARTA.
HARAHAP, M. KHOIRUL ROZUL (2013) PERENCANAAN PENGGUNAAN GAS LIFT PADA SUMUR “X” LAPANGAN “Y” PT. PERTAMINA EP REGION SUMATRA. Other thesis, UPN "Veteran" Yogyakarta.
HARMANSYAH, EKA (2014) ANALISA UJI DELIVERABILITAS UNTUK MENENTUKAN LAJU ALIR OPTIMUM PADA SUMUR “BATU-23” LAPANGAN “BAYAN” PETROCHINA INTERNATIONAL LTD. Other thesis, UPN "VETERAN" YOGYAKARTA.
HATOGUAN, HARRY JULIAN IRIANTO (2012) PERENCANAAN KEDALAMAN CASING DAN DESAIN CASING SUMUR EP-1 BERDASARKAN ESTIMASI PORE-PRESSURE OFFSET-WELL. Other thesis, UPN "Veteran" Yogyakarta.
HAWARI, DADANG (2015) EVALUASI FRACPACK SAND CONTROL PADA SUMUR DH-92 LAPANGAN KENALI ASAM PT. PERTAMINA EP ASSET 1 FIELD JAMBI. Other thesis, UPN "Veteran" Yogyakarta.
HENDRI, DILLA FADHILLAH (2013) ANALISA KETEBALAN STEAM CHEST PADA BREAKTHROUGH TIME PADA AREA X LAPANGAN DURI PT. CHEVRON PASIFIC INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
HERINAWIJAYA, DESHINTA PUTRI (2015) PERENCANAAN DAN EVALUASI PENERAPAN STIMULASI DENGAN METODE MATRIX ACIDIZING PADA FORMASI SANDSTONE PADA SUMUR “X” LAPANGAN “Y” PT. CHEVRON PACIFIC INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
HERIWIJAYA, ADITYA WIGASWARA (2013) ANALISA PENYEBAB SERTA PENANGANAN PIPA TERJEPIT SUMUR WG-1 LAPANGAN PANAS BUMI WIGA. Other thesis, UPN "VETERAN" YOGYAKARTA.
HERNAWAN, MIMBAR (2012) EVALUASI PENGASAMAN MATRIKS PADA SUMUR M-018 DAN SUMUR M-139 LAPANGAN TANJUNG RAYA PT. PERTAMINA EP (UBEP TANJUNG). Other thesis, UPN "Veteran" Yogyakarta.
HIDAYAT, MUHAMMAD SAMSUL (2015) ANALISA PROBLEM PIPA TERJEPIT PEMBORAN AERATED PADA TRAYEK 17-1/2” SUMUR RN-1 LAPANGAN PANASBUMI KERINCI PT. PERTAMINA GEOTHERMAL ENERGY. Other thesis, UPN "Veteran" Yogyakarta.
HUTAHAEAN, SAHAT (2016) KAJIAN PENGARUH EKSPLOITASI AIR TANAH MELALUI BEBERAPA SUMUR BOR TERHADAP INTRUSI AIR LAUT DI PERUSAHAAN “X” KECAMATAN PENAJAM KABUPATEN PENAJAM PASER UTARA PROVINSI KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
HUTOMO, TRIAJI (2012) EVALUASI ELECTRIC SUBMERSIBLE PUMP (ESP) PADA SUMUR L5A-XXX PT. PERTAMINA UBEP LIMAU. Other thesis, UPN "Veteran" Yogyakarta.
Hidayat B., Wahyu (2012) ANALISA KEHILANGAN TEKANAN DAN TEMPERATUR TERHADAP KUALITAS UAP DALAM PIPA ALIR DUA FASA DI PERMUKAAN PADA SUMUR HCE-28A LAPANGAN PANASBUMI DIENG. Other thesis, UPN "Veteran" Yogyakarta.
I
INANOSA, JOHANES JUNIOR (2015) PENAMBAHAN BAHAN ADITIF SILIKA VULKANIS DALAM DESAIN PENYEMENEN TRAYEK CASING 13 3/8" SUMUR TATYANU 14 LAPANGAN "X". Other thesis, UPN "Veteran" Yogyakarta.
IRAWAN, TEGUH (2012) PENINGKATAN LAJU PRODUKSI PADA SUMUR X-43, X-47 DAN X-50 LAPANGAN “Y” DENGAN MERUBAH METODE PRODUKSI DARI SUCKER ROD PUMP KE ELECTRIC SUBMERSIBLE PUMP (ESP) DENGAN MENGGUNAKAN SIMULATOR PRODUKSI. Other thesis, UPN "Veteran" Yogyakarta.
J
JAAFAR, FAJRI BELLADINO (2014) EVALUASI DESAIN METODE PRESSURIZED MUD CAP DRILLING (PMCD) UNTUK MENANGGULANGI PROBLEM TOTAL LOSS DAN SOUR GAS KICK PADA TRAYEK 6” SUMUR “X” LAPANGAN “Y” PT. PERTAMINA EP. Masters thesis, UPN "VETERAN" YOGYAKARTA.
JALIL, ABDUL (2013) OPTIMASI ELECTRIC SUBMERSIBLE PUMP (ESP) PADA SUMUR KTB - 15 LAPANGAN KETALING BARAT PERTAMINA EP UNIT BISNIS JAMBI. Other thesis, UPN "Veteran" Yogyakarta.
JANUARISKA, DIO PUTRA WAHYU (2018) KAJIAN HIDROLIKA FLUIDA PEMBORAN DAN PENGANGKATAN SERBUK BOR DENGAN MENGGUNAKAN RANCANGAN SOFTWARE HIDROLIKA “DPS” PADA PEMBORAN SUMUR RZL-23 LAPANGAN DPWJ. Other thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.
K
KATODA, SYAOKAT RAFSYAHNJANI (2017) EVALUASI HIDROLIKA FLUIDA PEMBORAN DAN PENGANGKATAN SERBUK BOR PADA TRAYEK 8 ½” PEMBORAN SUMUR “SRK24” LAPANGAN “PMB” PT. PERTAMINA EP. Other thesis, UPN "VETERAN" YOGYAKARTA.
KAUTSAR, GILANG RIZKI (2013) PEMANFAATAN BENTONITE LOKAL UNTUK MENGGANTIKAN WYOMING BENTONITE DENGAN PENAMBAHAN ADDITIVE PAC-L. Other thesis, UPN "Veteran" Yogyakarta.
KENCANA, DEWA GDE DHARMA (2012) PENENTUAN HARGA JUAL LISTRIK PANAS BUMI (US$CENTS/kWh) PADA LAPANGAN PANAS BUMI GUCI. Other thesis, UPN "Veteran" Yogyakarta.
KRISTANTO, Deddy (2007) EVALUASI PROSES PENGENDALIAN TEKANAN RESERVOIR MENGGUNAKAN INJEKSI AIR DI LAPNAGNAN MINYAK. Jurnal Ilmu Kebumian Teknologi Mineral, 20 (2). pp. 159-169. ISSN 0854 – 2554
KRISTANTO, Dedy and Sunindyo, Sunindyo (2000) PENGARUH ORIENTASI SUDUT PENDESAKAN DARI SUMUR INJEKSI TERHADAP PEROLEHAN MINYAK MENGGUNAKAN INJEKSI CO2. HASIL PENELITIAN UPN "VETERAN" YOGYAKARTA, II (2). pp. 24-39. ISSN 1410-9557
KURNIAWAN, DERRY (2013) EVALUASI KEBERHASILAN STIMULASI HYDRAULIC FRACTURING PADA LAPANGAN BENAKAT TIMUR, SUMUR X-06 PT. PERTAMINA EP REGION SUMATERA. Other thesis, UPN "VETERAN" YOGYAKARTA.
KURNIAWAN, RUDI (2011) STUDI SIMULASI RESERVOIR UNTUK PILOT INJEKSI AIR PADA RESERVOIR “A” LAPANGAN “B” P.T. PERTAMINA EP REGION SUMATERA. Other thesis, UPN "Veteran" Yogyakarta.
KUSDIYANTA, JAKA (2012) PERENCANAAN PROGRESSIVE CAVITY PUMP (PCP) SUMUR “A” PADA LAPANGAN “B” TAC. PERTAMINA PILONA PETRO TANJUNG LONTAR Ltd LAHAT - SUMATERA SELATAN. Other thesis, UPN "Veteran" Yogyakarta.
KUSUMAWARDHANI, RARASATI (2014) EVALUASI PENGGUNAAN WELL HEAD COMPRESSOR PADA SUMUR “X” LAPANGAN “Y” MENGGUNAKAN SIMULATOR PRODUKSI. Masters thesis, UPN "VETERAN" YOGYAKARTA.
L
LABOLO, IRWANTO S. (2012) PERENCANAAN ELECTRIC SUBMERSIBLE PUMP PADA SUMUR „X‟ LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
LASSA, THRESNA ADELIANA (2020) EVALUASI PENERAPAN METODE PENYANGGA DI BLOK CIKONENG TAMBANG BIJIH EMAS BAWAH TANAH PT. CIBALIUNG SUMBERDAYA - KABUPATEN PANDEGLANG PROVINSI BANTEN. Other thesis, Universitas Pembangunan Nasional Veteran Yogyakarta.
LATUMANUSAITTE, RICHARD (2015) PERHITUNGAN DESAIN INTERMEDIATE CASING DAN LINER CASING SUMUR “BG-33” DAN DESAIN CASING MENGGUNAKAN GRADE CASING YANG ADA DI LOGISTIK PADA LAPANGAN “Y” KARLEZ PETROLEUM (SERAM) LTD. Other thesis, UPN "Veteran" Yogyakarta.
LESTARI, ENDANG PUJI (2012) STUDY LABORATORIUM PENGARUH TEMPERATUR PENGKONDISIAN LUMPUR PEMBORAN BERBAHAN DASAR AIR DAN BERBAHAN DASAR MINYAK. Other thesis, UPN "Veteran" Yogyakarta.
LETTE, STEVEN CANDRA (2013) MENENTUKAN LETAK FEED ZONE DAN PARAMETER ALIRAN MENGGUNAKAN PRESSURE TEMPARTURE SPINNER (PTS) PADA SUMUR “S” DI LAPANGAN “WAYANG WINDU”. Other thesis, UPN "VETERAN" YOGYAKARTA.
LEVI, DHYKO PRATAMA (2014) ANALISA PERHITUNGAN ALOKASI PRODUKSI PER LAPISAN PADA LAPANGAN PROGRAM STUDI TEKNIK PERMINYAKAN FAKULTAS TEKNOLOGI MINERAL UNIVERSITAS “X” PT. CHEVRON PACIFIC INDONESIA. Other thesis, UPN "VETERAN" YOGYAKARTA.
LINGGA, ALEXANDER G.H. (2012) EVALUASI PUTUS RANGKAIAN DRILL STRING TRAYEK 8.5” PADA OPERASI DIRECTIONAL DRILLING SUMUR X-771 LAPANGAN X PT. PERTAMINA EP (UBEP TANJUNG). Other thesis, UPN "Veteran" Yogyakarta.
LISTIANI, HERMIKA DIAN (2012) STUDI LABORATORIUM EFEK PENAMBAHAN ADDITIVE XCD-POLYMER, SPERSENE, RESINEX DAN DRISPAC TERHADAP SIFAT FISIK LUMPUR BERBAHAN DASAR AIR PADA TEMPERATUR SAMPAI 150 0C. Other thesis, UPN "Veteran" Yogyakarta.
LUBIS, ARDIANSYAH RENDITYA (2013) EVALUASI PENGASAMAN MATRIKS PADA SUMUR KT-10 dan KT-20 LAPANGAN “X” PT. PERTAMINA EP - UBEP TANJUNG. Other thesis, UPN "VETERAN" YOGYAKARTA.
M
MAKRIVA, DONI ARIEF (2012) Disusun Sebagai Salah Satu Syarat Untuk Memperoleh Gelar Sarjana Pada Kurikulum Program Studi Teknik Perminyakan Fakultas Teknologi Mineral Universitas Pembangunan Nasional “Veteran” Yogyakarta. Other thesis, UPN "Veteran" Yogyakarta.
MARTADINATA, AJI (2012) KAJIAN CASING SURFACE 13-3/8” DAN CASING INTERMEDIATE 9-5/8” PADA SUMUR “X-2” LAPANGAN “Z” KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
MARYANA, VIRONIKA NINA (2012) ANALISA PERMEABILITAS TRANSFORM DAN PENENTUAN SATURASI AIR DENGAN MENGGUNAKAN METODE HYDRAULIC FLOW UNIT FORMASI MINAHAKI LAPANGAN “X”. Other thesis, UPN "Veteran" Yogyakarta.
MAULANA, ANDRI (2012) ANALISA KEEKONOMIAN PADA LAPISAN Y LAPANGAN BAGUS. Other thesis, UPN "VETERAN" YOGYAKARTA.
MEGANTARA, NUR CAHYA (2012) SKENARIO PRODUKSI DENGAN MENGGUNAKAN SIMULATOR PIPESIM 2003 PADA LAPANGAN SUKOWATI JOB PERTAMINA–PETROCHINA EAST JAVA TUBAN BLOCK. Other thesis, UPN "Veteran" Yogyakarta.
MUBARROQ, NOVY HUSNI (2012) EVALUASI RE DESAIN ELECTRIC SUBMERSIBLE PUMP (ESP) PADA SUMUR “X” LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
MUHASIBI, AL HARITS (2015) EVALUASI PENERAPAN MATRIX ACIDIZING PADA SUMUR “X-16” DAN “X-12” LAPANGAN “Y” BOB PT.BUMI SIAK PUSAKO PERTAMINA HULU. Other thesis, UPN "Veteran" Yogyakarta.
MUKIPRIANDRI, MOHAMMAD TRIAGUNG (2015) PENGARUH NON-CONDENSABLE GAS (NCG) TERHADAP PEROLEHAN MEGAWATT PADA TURBIN DI LAPANGAN PANASBUMI “Y”. Other thesis, UPN "Veteran" Yogyakarta.
MUKLIS, MUKLIS (2012) EVALUASI DAN PERENCANAN ULANG POMPA BENAM LISTRIK (ESP) SUMUR MSAC-16 DI LAPANGAN KURAU PT. KONDUR PETROLEUM S.A. Other thesis, UPN "Veteran" Yogyakarta.
MUKTI, DANAR DARU (2012) PENGARUH INVASI MUD FILTRAT TERHADAP KERUSAKAN FORMASI PADA SUMUR-SUMUR LAPANGAN “Y” P.T. CHEVRON PACIFIC INDONESIA. Other thesis, UPN "Veteran " Yogyakarta.
Maia, Moises Afonso Da (2015) EVALUASI DAN PENANGGANAN PROBLEM PIPA TERJEPIT PADA TRAYEK 8 ½” SUMUR “X” LAPANGAN PT PERTAMINA EP.
Mambrasar, Bill Glen (2015) EVALUASI PENANGGULANGAN PIPA TERJEPIT PADA TRAYEK 12 1/4” PADA SUMUR “X” LAPANGAN “Y” PT PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
Manggalayuda, Lito Elky (2015) PERHITUNGAN ULANG DESAIN CASING 7” PADA SUMUR “X” LAPANGAN “Y” MENGGUNAKAN METODE GRAFIS. Other thesis, UPN "Veteran" Yogyakarta.
Marques, Olderico (2016) IDENTIFIKASI LETAK DAN KEDALAMAN AKUIFER AIRTANAH DENGAN MENGGUNAKAN METODE KONFIGURASI SCHLUMBERGER KABUPATEN SAMPANG PROVINSI JAWA TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
Mujiono, Moh. (2011) DESAIN CASING DENGAN METODE MAKSIMUM LOAD SERTA MEMPERTIMBANGKAN KICK GAIN (KICK OF TOLERANCE) UNTUK PENENTUAN CASING DEPTH PADA SUMUR “TIAKA 11” PADA LAPANGAN “TIAKA” DAN RESERVOIR “TOMORI”. Other thesis, UPN "Veteran" Yogyakarta.
N
N U G R A H E N, Y A N I S WA H Y U (2011) A N A L I S A K E E K O N O MI A N P A D A P E N G E MB A N G A N L A P I S A N K 1 L A P A N G A N MI N Y A K “ Y P ” D E N G A N ME N G G U N A K A N ME T O D E D E C L I N E C U R V E A N A L Y S I S. Other thesis, UPN "Veteran" Yogyakarta.
NAPITUPULU, RONI AURINDO (2018) OPTIMASI HIDROLIKA PEMBORAN DAN PENGANGKATAN CUTTING PADA TRAYEK 121/4” SUMUR “RAN” LAPANGAN “NA” DENGAN RANCANGAN SOFTWARE “DPS”. Other thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.
NATA, CHANDRA ADY KUSUMA (2015) EVALUASI DAN DESAIN ULANG POMPA ESP UNTUK OPTIMASI PRODUKSI MINYAK PADA SUMUR “PWS-01” DI LAPANGAN “TM”. Other thesis, UPN "Veteran" Yogyakarta.
NAULI, BERI (2012) STUDI LABORATORIUM LUMPUR BERBAHAN DASAR AIR YANG TERKONTAMINASI NaCl TERHADAP PENAMBAHAN PAC-R DAN SERBUK KAYU. Other thesis, UPN "Veteran" Yogyakarta.
NISSA, KHOIRUN (2015) STUDI PENGARUH PERUBAHAN MEKANISME PENDORONG TERHADAP PERHITUNGAN OIL IN PLACE MENGGUNAKAN PERSAMAAN MATERIAL BALANCE PADA LAPISAN “A” LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
NOUVAL, ANDRE (2015) PERHITUNGAN ULANG CADANGAN MINYAK DENGAN METODE VOLUMETRIK LAPANGAN X LAPISAN Y. Other thesis, UPN "Veteran" Yogyakarta.
NOVERIADY, NOVERIADY (2012) KAJIAN TEKNIS SISTEM PENYALIRAN TAMBANG PT. DEBBIA LOGISTIC JOB SITE PT. BATUBARA BANDUNG PRATAMA KEC REREN BATUAH KABUPATEN BARITO TIMUR KALIMANTAN TENGAH. Other thesis, UPN "Veteran" Yogyakarta.
NUGROHO, RIO (2011) PENENTUAN POTENSI DINAMIK RESERVOIR PANASBUMI LAPANGAN NAMORA I LANGIT (NIL) DENGAN MENGGUNAKAN SIMULATOR TOUGH2. Other thesis, UPN "Veteran" Yogyakarta.
NUGROHO, WINASTRA FERRY (2015) EVALUASI MECHANICAL PIPE STICKING DENGAN ANALISA DRILLING REPORT, ANALISA GEOLOGI, DAN ANALISA XRD SUMUR FWR-05 LAPANGAN WINA. Other thesis, UPN "Veteran" Yogyakarta.
NURYUDI, IRFAN SAHAB (2015) STUDI LABORATORIUM SURFAKTAN TFSA (THIN FILM SPREADING AGENT) UNTUK PENINGKATAN RECOVERY FACTOR. Other thesis, UPN "Veteran" Yogyakarta.
NUSANTARA, GALANG GARUDA (2014) EVALUASI HASIL DAN PERFORMANCE STIMULASI PEREKAHAN SUMUR GX6, GX5, GX2, DAN NX4 PT. PERTAMINA EP ASSET 1 FIELD RANTAU. Other thesis, UPN "VETERAN" YOGYAKARTA.
P
P r a s e t y o S, A d e D w i (2012) E V A L U A S I P E N A N G G U L A N G A N W E L L K I C K D E N G A N P E R B A N D I N G A N ME N G G U N A K A N ME T O D E E N G I N E E R D A N ME T O D E C O N C U R E N T P A D A S U MU R “ X ” L A P A N G A N “ Y ” P T . P E R T A MI N A E P. Other thesis, UPN "Veteran" Yogyakarta.
PAMUNGKAS, DIMAS GALIH (2012) EVALUASI DAN PERENCANAAN ELECTRIC SUBMERSIBLE PUMP (ESP) PADA SUMUR LS-138 PT PERTAMINA UBEP LIRIK. Other thesis, UPN "Veteran" Yogyakarta.
PANATA, ANDRE (2011) PERENCANAAN DIMENSI SEPARATOR UNTUK SISTEM PAD-29 YANG DISAMBUNGKAN DENGAN MAIN STEAM DARI PAD-7 PADA LAPANGAN PANASBUMI DIENG. Other thesis, UPN "Veteran" Yogyakarta.
PERMADI, LINGGAR SATRIO (2015) EVALUASI MATRIX ACIDIZING PADA SUMUR “X” DAN “Y” LAPANGAN ”Z” FORMASI BATU PASIR TELISA SUMATERA SELATAN PT. MEDCO E&P INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
PONGTULURAN, SUTIKNO SUBRIADI (2016) STUDI HIDROGEOLOGI PADA WILAYAH IUP PT. INDOASIA CEMERLANG DI KECAMATAN SUNGAI CUKA, KABUPATEN TANAH LAUT PROVINSI KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.
PRABAWA, SENA AJI (2013) EVALUASI KEBERHASILAN HYDRAULIC FRACTURINGPADA SUMUR “X-361” LAPANGAN “Y” PT. PERTAMINA EP REGION SUMATERA. Other thesis, UPN "Veteran" Yogyakarta.
PRABOWO, ARIS (2015) EVALUASI DAN PERENCANAAN ELECTRIC SUBMERSIBLE PUMP (ESP) DALAM RANGKA OPTIMASI PRODUKSI PADA SUMUR ST-X LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
PRAKASHA, MAHARDHYKA (2015) EVALUASI PERENCANAAN PRESSURIZED MUD CAP DRILLING DENGAN PENGARUH VISKOSITAS PADA ANNULAR FLUID TERHADAP GAS MIGRATION VELOCITY PADA SUMUR X LAPANGAN Y. Other thesis, UPN "Veteran" Yogyakarta.
PRAKOSO, ANDRE SURYO (2015) PENANGGULANGAN WELL KICK PADA SUMUR “ADR 01” LAPANGAN “TALANG JIMAR ’’ BLOK SOUTH SUMATERA DENGAN METODE ENGINEER PT. PERTAMINA UTC. Other thesis, UPN "Veteran" Yogyakarta.
PRAKOSO, KUKUH PUJI (2013) KAJIAN PENCAMPURAN BATUGAMPING BEDA KADAR UNTUK MEMENUHI KEBUTUHAN BAHAN BAKU SEMEN PT. SEMEN INDONESIA (PERSERO) Tbk. PABRIK TUBAN I JAWA TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
PRAMBUDI, RASYID TEGAR (2024) ANALISIS PENGARUH ION BARIUM TERHADAP RHEOLOGY DAN RESIDU FLUIDA PEREKAH BERBAHAN DASAR AIR FORMASI. Diploma thesis, UPN Veteran Yogyakarta.
PRANADIPA, IMAM (2011) OPTIMALISASI PEREKAHAN HIDROLIK PADA SUMUR-SUMUR MINYAK DI LAPANGAN DIPA PT. CHEVRON PACIFIC INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
PRASATYA, IRFANNY (2013) EVALUASI PENYEMENAN PRIMER PADA CASING 7” PADA SUMUR X LAPANGAN BANGKUDULIS KSO PERTAMINA EP - PATINA GROUP LTD. Other thesis, UPN "VETERAN" YOGYAKARTA.
PRASEDYA, ARBIAN BAYU (2015) OPTIMASI HIDROLIKA PAHAT DAN PENGANGKATAN SERBUK BOR PADA TRAYEK 12 ¼” DI SUMUR “LSE-1072” LAPANGAN “SANGA-SANGA” PT. PERTAMINA EP ASSET 5. Other thesis, UPN "Veteran" Yogyakarta.
PRASETYA, ALVIANTI DWI (2012) EVALUASI PEREKAHAN HIDRAULIK TERHADAP KENAIKAN PRODUKTIVITAS FORMASI PADA SUMUR HALLO #1. Other thesis, UPN "VETERAN" YOGYAKARTA.
PRATAMA, EDO (2014) ANALISA DAN PEMODELAN PETROFISIK, SERTA PERKIRAAN KANDUNGAN MINYAK MULA-MULA PADA LOW RESISTIVE SEQUENCE LAPANGAN “ERMIS” DI CHEVRON INDONESIA COMPANY. Other thesis, UPN "VETERAN" YOGYAKARTA.
PRIATNA, GANESHA WEDA (2011) PERENCANAAN ESP PADA PERMEABILITAS RENDAH DAN TEMPERATUR TINGGI LAPANGAN ATTI ALFA CHARLIE CNOOC SES LTD. Other thesis, UPN "Veteran" Yogyakarta.
PUTRA, DIMAS HUSADA (2012) EVALUASI SQUEEZE CEMENTING UNTUK MENUTUP ZONA AIR PADA SUMUR “X-142” PADA INTERVAL 3325.92 - 3339.04 FEET LAPANGAN “DHP” PT. PERTAMINA EP (UBEP TANJUNG). Other thesis, UPN "Veteran" Yogyakarta.
PUTRA, TEGAR SUPRIYADI (2013) EVALUASI STIMULASI MATRIX ACIDIZING PADA SUMUR RA-3 DAN TSP-4 LAPISAN „BRF‟ PT. PERTAMINA EP REGION SUMATERA. Other thesis, UPN "VETERAN" YOGYAKARTA.
PUTRO, PRAMADHIO ARI (2015) ANALISA PENURUNAN PRODUKSI SUMUR DRY STEAM PADA LAPANGAN PANASBUMI WAYANG WINDU. Other thesis, UPN "Veteran" Yogyakarta.
Pangaribuan, Yosua (2014) ANALISA PARAMETER DESAIN DRILLSTRING PADA PEMBORAN BERARAH DI SUMUR ‘BN-160’ LAPANGAN ‘BUNYU’ PT. PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
Q
QORNI, UWES (2011) STUDI SIMULASI RESERVOIR UNTUK RENCANA PENERAPAN INJEKSI AIR PADA LAPANGAN “PQR” LAPISAN “S”. Other thesis, UPN "Veteran" Yogyakarta.
R
RAHAYU, PRAMESTI ISNA (2012) EVALUASI KAPASITAS RIG PADA OPERASI PEMBORAN DELINIASI SUMUR SOUTH SEBUKU-2 LAPANGAN “BENGARA” PT MEDCO E&P INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
RAZALEIGH, JEFFRI (2015) EVALUASI DESAIN CASING 9-5/8” DAN 7” PADA SUMUR “X” LAPANGAN “Y-001” PT. PERTAMINA EP MENGGUNAKAN METODE GRAFIS. Other thesis, UPN "Veteran" Yogyakarta.
RERUNG, SARTIAN PATABIRAN (2013) GEOLOGI DAN STUDI DESAIN MAIN DAM RENCANA BENDUNGAN JATIBARANG, DESA KEDUNGPANE, KECAMATAN GUNUNG PATI, KABUPATEN SEMARANG, JAWA TENGAH. Other thesis, UPN "VETERAN" YOGYAKARTA.
RIDLAH, MUHAMMAD RASYID (2012) ANALISA KINERJA WATERFLOODING PADA POLA LIKE INVERTED 7 SPOT DENGAN MENGGUNAKAN METODE DYKSTRA-PARSON DAN METODE STILES DI LAPISAN “E” LAPANGAN “BLACKGOLD” PT CHEVRON PACIFIC INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
RIFA, WAHYU BUDI (2012) EFEK PENAMBAHAN SALINITAS (CaCl2) TERHADAP SIFAT-SIFAT LUMPUR OIL BASE MUD PADA TEMPERATUR 150 ˚C (302 ˚F). Other thesis, UPN "Veteran" Yogyakarta.
RORI BRAMANTYO, RORI (2012) EVALUASI DAN OPTIMASI POMPA SUCKER ROD SUMUR “LR-X1” DAN “AN-X2” LAPANGAN LIRIK PT.PERTAMINA UBEP LIRIK. Other thesis, UPN "Veteran" Yogyakarta.
RUKMAN, Dadang and KRISTANTO, Deddy and AJI, V.Dedi Cahyoko (2011) TEKNIK RESERVOIR:TEORI DAN APLIKASI. POHON CAHAYA. ISBN 978-602-9485-05-9
RUSYADA, RAMADHANA ADI (2021) KAJIAN TEKNIS KESIAPAN ROM STOCKPILE UNTUK RENCANA KENAIKAN PRODUKSI BATUBARA DI PT MULTI HARAPAN UTAMA KALIMANTAN TIMUR. Diploma thesis, UPN "VETERAN" YOGYAKARTA.
Roesnadi, Elsa Maylina Putri (2024) PERBANDINGAN PELABELAN MANUAL DAN TEXBLOB MENGGUNAKAN METODE SUPPORT VECTOR MACHINE UNTUK ANALISIS SENTIMEN PADA ULASAN APLIKASI SHOPEE. Other thesis, UPN "Veteran" Yogyakarta.
S
SAKLIRESY, ROY RAFAEL (2013) PENGARUH REMBESAN AIR DRAINASE CO2 REMOVAL PLANT TERHADAP KUALITAS LAHAN PERSAWAHAN DI SEKITAR FIELD SUBANG PT PERTAMINA EP REGION JAWA. Other thesis, UPN "VETERAN" YOGYAKARTA.
SANTOSA, BAYU AJI (2015) PENGARUH PENAMBAHAN RESINEX TERHADAP LUMPUR PEMBORAN BERBAHAN DASAR AIR DENGAN ADDITIVE PAC-R YANG TERKONTAMINASI GYPSUM. Other thesis, UPN "Veteran" Yogyakarta.
SAPUTRO, EMANUEL JIWANDONO (2014) ANALISA PETROFISIKA DAN EVALUASI FORMASI UNTUK KARAKTERISASI RESERVOIR PADA LAPISAN “X” LAPANGAN RANTAU. Other thesis, UPN "VETERAN" YOGYAKARTA.
SARI, RESA NANDA VIDYA (2024) ANALISA PENANGGULANGAN WELL KICK DENGAN MENGGUNAKAN METODE WAIT AND WEIGHT PADA SUMUR “RS-23” LAPANGAN “BUMI”. Diploma thesis, UPN Veteran Yogyakarta.
SATRIA, RIO AGUNG (2014) OPTIMASI POMPA SUCKER ROD BERDASARKAN ANALISA DYNAMOMETER CARD DAN PENANGANAN PROBLEM KEPASIRAN PADA SUMUR “X” LAPANGAN RANTAU. Other thesis, UPN "VETERAN" YOGYAKARTA.
SEPTIAWAN, WAWAN (2013) ANALISA KEGAGALAN MATRIX ACIDIZING PADA SUMUR PRODUKSI A-33 LAPANGAN “X” PT. PERTAMINA EP REGION SUMATERA. Other thesis, UPN "Veteran" Yogyakarta.
SETIADI, INDRA (2012) EVALUASI HYDRAULIC FRACTURING PROJECT PADA LAPANGAN ASTAMA, SUMUR ATM - 33 PT. PERTAMINA EP UBEP JAMBI. Other thesis, UPN "Veteran" Yogyakarta.
SETIAWAN, Jatmiko and Kristanto, Dedy (2017) SEJARAH PENGELOLAAN INDUSTRI MIGAS DI BLOK CEPU. Project Report. AMARA BOOKS.
SETIYAWAN, KEBAK ALAM (2011) ANALISIS KESTABILAN LERENG LOW WALL PADA PENAMBANGAN BATUBARA DI PIT 6 PT. SINAR KUMALA NAGA, KEC. ANGGANA, KAB. KUTAI KERTANEGARA KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
SETYANINGSIH, KATARINA DWIWAHYU (2015) ANALISIA PROBLEM PRODUKSI AIR YANG BERLEBIHAN PADA SUMUR PD-074 LAPANGAN PANDAWA. Other thesis, UPN "Veteran" Yogyakarta.
SETYAWINATA, SUSANDY (2010) KAJIAN KEEKONOMIAN POLA PENGUSAHAAN SUMUR TUA CEPU. Other thesis, UPN "Veteran" Yogyakarta.
SETYONO, NUR HIDAYAT (2015) EVALUASI DAN PENANGGULANGAN PIPA TERJEPIT PADA PEMBORAN DIRECTIONAL DI SUMUR BN-03 LAPANGAN PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
SIAGIAN, PASCHAL GREYCIUS (2016) STUDI HIDROGEOLOGI PADA WILAYAH IZIN USAHA PERTAMBANGAN PT BANJARSARI PRIBUMI DI KECAMATAN MERAPI TIMUR KABUPATEN LAHAT SUMATERA SELATAN. Other thesis, UPN "VETERAN" YOGYAKARTA.
SIAHAAN, EDISON (2012) ANALISA PRESSURE BUILD-UP TEST DAN DELIVERABILITY TEST UNTUK MENENTUKAN LAJU ALIR OPTIMUM PADA SUMUR X-03 LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
SIREGAR, DAVID POSMA TARUNA (2015) EVALUASI PENANGGULANGAN PROBLEM LOST CIRCULATION PADA PEMBORAN SUMUR “DPS-8080 TRAYEK 12-1/4” LAPANGAN “DPS” PERTAMINA EP. Other thesis, UPN "Veteran" Yogyakarta.
SOER, ARIF ADI WICAKSONO (2014) EVALUASI PENGGUNAAN RIG PADA OPERASI PEMBORAN EKSPLORASI SUMUR PDL-01 LAPANGAN “PONDOK MULYA” PT. PERTAMINA DRILLING SERVICES INDONESIA. Other thesis, UPN "VETERAN" YOGYAKARTA.
SOER, ARIF ADI WICAKSONO (2014) EVALUASI PENGGUNAAN RIG PADA OPERASI PEMBORAN EKSPLORASI SUMUR PDL-01 LAPANGAN “PONDOK MULYA” PT. PERTAMINA DRILLING SERVICES INDONESIA. Other thesis, UPN "VETERAN" YOGYAKARTA.
SORDADANG, SORDADANG (2011) PENANGGULANGAN PROBLEM PIPA TERJEPIT (PIPE STICKING) DI SUMUR ‘X’ LAPANGAN ‘Y’ PT MEDCO E&P INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.
SRIFATHONA, SULISTIA (2022) ANALISIS PENGGUNAAN KAPORIT SEBELUM DAN SESUDAH PROSES DESINFEKSI DI PERUMDA AIR MINUM TIRTA BINANGUN UNIT IPA SALAMREJO KABUPATEN KULON PROGO. Diploma thesis, UPN "Veteran" Yogyakarta.
SUBCHI, ANWAR (2015) EVALUASI PENGGUNAAN DENSITAS LUMPUR PADA TRAYEK 7” SUMUR AWR-A1 DENGAN PENDEKATAN SAFE MUD WINDOW MENGGUNAKAN SOFTWARE DRILLWORK. Other thesis, UPN "VETERAN" YOGYAKARTA.
SUDARYANTO, BAGUS (2012) KAJIAN PEMAKAIAN DRILL STRING PADA PEMBORAN VERTIKAL SUMUR “X” LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
SUMBADA, RENO (2010) ANALISA PRESSURE BUILD-UP PADA SUMUR “RDU-01” DI LAPANGAN “RDU” UNTUK MENGOPTIMALKAN PRODUKSI SUMUR. Other thesis, UPN "Veteran" Yogyakarta.
SUPRAPTO, KRISTIANTO DWI (2021) PERENCANAAN MANAGED PRESSURE DRILLING UNTUK ZONA NARROW PRESSURE WINDOW DENGAN MENGAPLIKASIKAN METODE CONSTANT BOTTOM HOLE PRESSURE PADA SUMUR “KDS-14” LAPANGAN “SUPRAPTO” PT. PERTAMINA HULU KALIMANTAN TIMUR. Diploma thesis, UPN "VETERAN" YOGYAKARTA.
SUPRIYANTO, EKO (2012) PERHITUNGAN SUMBER DAYA BIJIH BESI SEKUNDER MENGGUNAKAN METODE TRIANGULAR GROUPING DAN DENGAN METODE POLIGON DI PT. MULTINDO CAKRAWALA SEJATI DAERAH KELAMPAI KEC. KENDAWANGAN, KAB.KETAPANG PROVINSI KALIMANTAN BARAT. Other thesis, UPN "Veteran" Yogyakarta.
SUSILO, ADITYA DWI (2015) ANALISA PRESSURE FALL-OFF TEST PADA SUMUR “X” PADA LAPANGAN PANASBUMI “Y”. Other thesis, UPN "Veteran" Yogyakarta.
SUTANTIO, HENDRI TRI (2012) OPTIMASI KINERJA POMPA SUCKER ROD DENGAN ANALISA DYNAMOMETER PADA SUMUR “X” LAPANGAN ”Y”. Other thesis, UPN "Veteran" Yogyakarta.
SYAFI’I, ACHMAD (2015) EVALUASI DAN OPTIMASI PRODUKSI SUMUR-SUMUR DI BLOCK STATION “X” LAPANGAN “Y” PT. MEDCO E&P INDONESIA DENGAN MENGGUNAKAN SIMULATOR PIPESIM. Other thesis, UPN "Veteran" Yogyakarta.
SYATORIH, SYATORIH (2011) EVALUASI PROGRAM DESAIN CASING 9-5/8” DAN 7” PADA SUMUR “X3” LAPANGAN “Z” PT. PERTAMINA EP MENGGUNAKAN METODE GRAFIS. Other thesis, UPN "Veteran" Yogyakarta.
Sandro, Sandro (2017) PEMANFAATAN TEKNIK EKOHIDRAULIKA DALAM PENGENDALIAN BENCANA BANJIR SUBDAS DENGKENG DI KECAMATAN TRUCUK KABUPATEN KLATEN PROVINSI JAWA TENGAH. Other thesis, UPN "VETERAN" YOGYAKARTA.
Shabella, Zakia (2024) TEKNIK KONSERVASI MATA AIR UNTUK MEMENUHI KEBUTUHAN AIR DOMESTIK DI PADUKUHAN GENDU, KALURAHAN JATIMULYO, KAPANEWON GIRIMULYO, KABUPATEN KULON PROGO, DAERAH ISTIMEWA YOGYAKARTA. Other thesis, UPN "Veteran" Yogyakarta.
Silva, Domingos da (2016) PENDUGAAN PENYEBARAN AKUIFER DAN ZONA AIR TANAH MENGGUNAKAN METODE GEOLISTRIK KONFIGURASI SCHLUMBERGER DAERAH KAJANG, HERLANGE, UJUNGLOE DAN BONTOBAHARI KABUPATEN BULUKUMBA SULAWESI SELATAN. Other thesis, UPN "Veteran" Yogyakarta.
Sulistyarso, Harry Budiharjo (2019) Effect of Pump Rate Penetration Sensitivity on Hydraulic Fracturing in Low Resistivity Reservoir. Petroleum Science and Engineering, 3 (1). pp. 10-16. ISSN 2640-4486
Sumantri, Yosaphat and Pamungkas, Joko and Claver Satrio Wibowo, Petrus (2015) Studi Injeksi Kimia Melalui Simulasi Reservoir: Kasus Pada Reservoir DI, Lapangan Rantau. Jurnal Ilmu Kebumian "TEKNOLOGI MINERAL", 1 (1). pp. 6-20.
Syahid, Muhamad (2015) EVALUASI DAN DESAIN ULANG POMPA ESP UNTUK OPTIMASI PRODUKSI MINYAK PADA SUMUR “MSY-01” DI LAPANGAN “BG”. Other thesis, UPN "Veteran" Yogyakarta.
T
TAQWA, GERRY (2013) EVALUASI DAN PENANGGULANGAN HILANG LUMPUR PEMBORAN PADA SUMUR AW-1 LAPANGAN HANIM PT PERTAMINA HULU ENERGI RANDUGUNTING. Other thesis, UPN "Veteran" Yogyakarta.
TOKAN, EGBERTUS ILMAN (2012) PENGOLAHAN DATA SIFAT FISIK FLUIDA UNTUK KARAKTERISASI FLUIDA HIDROKARBON PADA LAPANGAN “X”. Other thesis, UPN "Veteran" Yogyakarta.
Tika, Nur Hariadi (2012) EVALUASI HIDROLIKA FLUIDA PEMBORAN DAN PENGANGKATAN SERBUK BOR PADA TRAYEK 12 ¼” DAN 8 ½” DI SUMUR “ASDJ-1T” LAPANGAN “AIR SERDANG”. Other thesis, UPN "Veteran" Yogyakarta.
U
UDAYANA, TRI RIZKI (2011) EVALUASI TRAJECTORY PEMBORAN BERARAH SUMUR “X” LAPANGAN “Z” PT. PERTAMINA GEOTHERMAL ENERGY MENGGUNAKAN METODE MINIMUM OF CURVATURE. Other thesis, UPN "Veteran" Yogyakarta.
ULINNUHA, MUHAMAD (2014) RE-DESAIN CONTINOUS GAS LIFT SUMUR X-1 DAN X-6 PADA LAPANGAN RANTAU PT PERTAMINA REGION SUMATRA. Other thesis, UPN "VETERAN" YOGYAKARTA.
UTOMO, BENNY PRIYO (2015) STUDI LABORATORIUM MENGENAI PENGARUH PENAMBAHAN RESINEX TERHADAP LUMPUR PEMBORAN BERBAHAN DASAR AIR YANG TERKONTAMINASI KALSIUM DAN MAGNESIUM. Other thesis, UPN "Veteran" Yogyakarta.
Utama, A. Rizki Putra (2012) ANALISIS DECLINE PRODUKSI LAPANGAN PANASBUMI AREA “X” DENGAN MENGGUNAKAN WELLBORE SIMULATON. Other thesis, UPN "Veteran" Yogyakarta.
W
WAHYUDI, MUHAMMAD INDRA (2012) IDENTIFIKASI DAN PENANGGULANGAN LIQUID LOADING PADA SUMUR GAS DI PT CHEVRON PACIFIC INDONESIA. Other thesis, UPN "VETERAN" YOGYAKARTA.
WANDA, ALPEN DESTRY (2012) PEMANFAATAN ENDAPAN BENTONIT LOKAL KABUPATEN CIREBON UNTUK FLUIDA PEMBORAN. Other thesis, UPN "Veteran" Yogyakarta.
WAWORUNTU, GERARDO RICHARD VALENTINO (2016) PEMODELAN AKUIFER AIR TANAH BERDASARKAN NILAI RESISTIVITAS METODE GEOLISTRIK KONFIGURASI WENNER-SCHLUMBERGER UNTUK PENENTUAN TITIK SUMUR PANTAU TEMPAT PEMBUANGAN LIMBAH DAERAH “TEDONGSILAGA”. Other thesis, UPN "Veteran" Yogyakarta.
WIBOWO, PETRUS CLAVER SATRIO (2015) STUDI SIMULASI RESERVOIR UNTUK INJEKSI KIMIA PADA RESERVOIR “A” LAPANGAN “B”. Other thesis, UPN "Veteran" Yogyakarta.
WICAKSANA, AJI PRIYA (2014) PERAMALAN KINERJA ALIRAN GAS MELALUI MEDIA COALBED TERHADAP PERILAKU PRODUKSI SUMUR LAPANGAN “X” ZONA LAPISAN “1”,”2”,”3” DAN PERKIRAAN KEBUTUHAN SUMUR DALAM RANGKA PENGEMBANGAN LAPANGAN. Other thesis, UPN "VETERAN" YOGYAKARTA.
WICAKSONO, AGUNG (2011) EVALUASI PENGASAMAN UNTUK MENANGGULANGI PROBLEM SCALE (SCALE TREATMENT) PADA SUMUR “FB-1” DAN “TA-1” LAPANGAN “F” DAN “T” CNOOC SES. Ltd. Other thesis, UPN "Veteran" Yogyakarta.
WIDAYAT, IGNASIUS WAHYU (2012) PENENTUAN LAJU ALIR POTENSIAL DENGAN MENGGUNAKAN HASIL ANALISA PRESSURE BUILD-UP TEST PADA SUMUR GAS X-003. Other thesis, UPN "Veteran" Yogyakarta.
WIJAYA, GARIT KARISMA (2024) PERENCANAAN CASING SETTING DEPTH PADA SUMUR “WJ-02” BERDASAR DATA SEBELUMNYA LAPANGAN “GK”. Diploma thesis, UPN Veteran Yogyakarta.
WIJAYANTI, DEBBY ARI (2015) STUDI LABORATORIUM PENINGKATAN PEROLEHAN MINYAK TAHAP LANJUT DENGAN METODE INJEKSI SURFAKTAN MENGGUNAKAN SURFAKTAN METIL ESTER SULFONAT. Other thesis, UPN "Veteran" Yogyakarta.
WINARTA, SANTI (2012) PERENCANAAN ELECTRIC SUBMERSIBLE PUMP PADA SUMUR „M-1‟ DAN „M-2‟ LAPANGAN “Y”. Other thesis, UPN "Veteran" Yogyakarta.
Wahyudi, Hendra Nuur (2013) KORELASI WELL LOG ANALYSIS-CORE ANALYSISFORMATION TESTER (MDT) UNTUK MENENTUKAN NILAI PERMEABILITAS PADA LAPANGAN “AB” PERTAMINA REGION KTI. Other thesis, UPN "Veteran" Yogyakarta.
Y
YONANDA, RIKI RIYA (2012) PERENCANAAN ELECTRIC SUBMERSIBLE PUMP PADA SUMUR “R-13” LAPANGAN “Y” JOB PERTAMINA – PETROCHINA EAST JAVA. Other thesis, UPN "Veteran" Yogyakarta.
YUDANTORO, DANNIS (2012) EVALUASI KEBERHASILAN STIMULASI MATRIX ACIDIZING DENGAN MENGGUNAKAN FOAM DIVERTER PADA SUMUR “KTA-1 DAN KTA-2” LAPANGAN “X” CNOOC SES Ltd. Other thesis, UPN "Veteran" Yogyakarta.
YUSRIN, MUHAMAD (2024) OPTIMASI HIDROLIKA DAN PENGANGKATAN CUTTING PADA LUMPUR KCL POLYAMINE TRAYEK 12-¼” SUMUR “MY-16” LAPANGAN “SS” DENGAN SOFTWARE WELLPLAN. Diploma thesis, UPN Veteran Yogyakarta.
Yoga P, Romadona (2019) ANALISIS PERENCANAAN HYDRAULIC FRACTURING PADA SUMUR “BBP” LAPANGAN “VETERAN”. Other thesis, Universitas Pembangunan Nasional Veteran Yogyakarta.
Z
ZAMORA, M. ILHAM (2015) DESIGN LABORATORIUM FLUIDA PEMBORAN BERBAHAN DASAR AIR UNTUK MENEMBUS FORMASI BATU BARA. Other thesis, UPN "Veteran" Yogyakarta.
ZAMZANI, MUHAMAD IMRON (2012) ANALISA APLIKASI GAS LIFT PADA LAPANGAN “WHS” HEAVY OIL DENGAN MENGGUNAKAN SIMULATOR CHEVRON INDONESIA COMPANY. Other thesis, UPN "Veteran" Yogyakarta.