Items where Division is "School of Chemistry" and Year is 2023

Group by: Creators | Item Type | No Grouping
Number of items: 123.

Ilham Rahmantara and Fadlilla Diaz Pangestu (2023) PRARANCANGAN PABRIK KIMIA PHENYLMETHANOL DARI BENZIL CHLORIDE MELALUI PROSES HIDROLISIS KAPASITAS 12.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

AHADIA, FORESTA LIESA (2023) MODEL PENJADWALAN BATCH DENGAN NO-WAIT CONSTRAINT UNTUK MEMINIMALKAN FLOWTIME (Studi Kasus pada UP Tambi). Other thesis, UPN "Veteran" Yogyajarta.

ALHAQ, ARDHANU SABILA (2023) PERANCANGAN LINGKUNGAN KERJA ASPEK PENCAHAYAAN UNTUK MENINGKATKAN JUMLAH PRODUKSI DAN MENGURANGI TINGKAT KECACATAN PRODUK (Studi kasus di UMKM Likayu Kasihan,Bantul, D.I. Yogyakarta). Other thesis, UPN "Veteran" Yogyajarta.

ALVI, NADHIFA KHAIRUNNISA (2023) EVALUASI KINERJA ROTARY SCREW COMPRESSOR OIL-INJECTED TYPE SCFD 165 SFC UNIT UTILITAS PT WAHANA DUTA JAYA RUCIKA – PLANT LEMAH ABANG, CIKARANG. Diploma thesis, UPN "Veteran" Yogyajarta.

ANANDA, YUANITA BELLA (2023) PENENTUAN URUTAN PRIORITAS SUPPLIER MENGGUNAKAN SWARA DAN TOPSIS (Studi Kasus: PT. Adi Satria Abadi, Bantul). Other thesis, UPN "Veteran" Yogyajarta.

ANASTASIA, LALA (2023) IMPLEMENTASI LEAN ERGONOMIC PADA PERBAIKAN PROSES PRODUKSI PENGECORAN LOGAM UNTUK MENGURANGI PEMBOROSAN (Studi kasus di UD Cantenan, Bantul, Daerah Istimewa Yogyakarta). Other thesis, UPN "Veteran" Yogyajarta.

ANTO, FITRAH JAPUNK LUCKY (2023) INOVASI STASIUN KERJA PENGGERINDAAN PADA PROSES PRODUKSI ALAT PERTANIAN TRADISIONAL UNTUK MENURUNKAN WAKTU PROSES DAN KELELAHAN MENGGUNAKAN METODE SPALTEN (Studi Kasus di UKM Pande Besi Marmin, Gunung Kidul, DIY). Other thesis, UPN "Veteran" Yogyajarta.

AWALIAH, NURATUL (2023) PENGEMBANGAN ALAT BANTU PEMINDAHAN GABAH YANG ERGONOMIS MENGGUNAKAN METODE NIDA UNTUK MEMPERCEPAT WAKTU PROSES DAN MENGURANGI RESIKO CEDERA PADA PEKERJA (Studi Kasus Pada Penggilingan Padi Baturetno, Banguntapan). Other thesis, UPN "Veteran" Yogyajarta.

AZZAHRA, ULFA AULIA (2023) MENGHITUNG EFISIENSI DISSOLVER PRODUK WATERGLASS DENGAN NILAI BE 58 PABRIK WATERGLASS PT SINAR SAKTI KIMIA. Diploma thesis, UPN "Veteran" Yogyajarta.

Adimar, Hazim Ibnu and Satyanagara, Dian Agung (2023) PRARANCANGAN PABRIK KIMIA ISOBUTIL AKRILAT DARI ASAM AKRILAT DAN ISOBUTANOL KAPASITAS 100.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyakarta.

Afni, Nur (2023) PENENTUAN LOKASI POSKO BANTUAN BENCANA GEMPA BUMI DI PROVINSI SULAWESI BARAT. Masters thesis, UPN "Veteran" Yogyajarta.

Agustyaningrum, Prunella (2023) MENGHITUNG NERACA MASSA DAN NERACA PANAS PADA TANGKI MAIN FERMENTER UNIT FERMENTASI PT INDO ACIDATAMA, TBK. Diploma thesis, UPN "Veteran" Yogyakarta.

Aisah, Winasti Nur (2023) EVALUASI KINERJA VERTICAL ROLLER MILL UNIT RAW MILL BERDASARKAN EFISIENSI PANAS DAN HEAT LOSS PT SINAR TAMBANG ARTHALESTARI BANYUMAS. Diploma thesis, UPN "Veteran" Yogyajarta.

Amanda, Mutia Yulisa (2023) EVALUASI KINERJA ROTARY DRYER 18.M-2114 UNIT PRODUKSI NPK II PT PETROKIMIA GRESIK. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Andryan, Alvin (2023) MENGHITUNG NERACA MASSA, NERACA PANAS, DAN MASSA CLOSED STEAM TANGKI PEMASAK UNIT PRODUKSI GONDORUKEM DAN TERPENTIN PPCI PEMALANG. Diploma thesis, UPN "Veteran" Yogyajarta.

Anggoro, Bili Fajar (2023) MENGHITUNG NERACA MASSA , NERACA PANAS DAN EFISIENSI PANAS PADA ROTARY DRYER DI PT.PAPERTECH INDONESIA UNIT II REJOSARI MUNGKID MAGELANG. Diploma thesis, UPN "Veteran" Yogyajarta.

Ardyah, Rima Novinda (2023) PRARANCANGAN PABRIK KIMIA POLIVINIL ALKOHOL DARI POLIVINIL ASETAT DAN METANOL KAPASITAS 50.000 TON/TAHUN. Diploma thesis, UPN "Veteran" Yogyakarta.

Ardyah, Rima Novinda and Rahayu, Normalita Ngesthi (2023) PRARANCANGAN PABRIK KIMIA POLIVINIL ALKOHOL DARI POLIVINIL ASETAT DAN METANOL KAPASITAS 50.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Arifan, Revi Ma’ruf (2023) KAJIAN PERFORMA REAKTOR UREA (DC-101) DEPARTEMEN PRODUKSI I B PT. PETROKIMIA GRESIK Jl. Jend. Ahmad Yani, Gresik 61119, Jawa Timur. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Asrul, Amas (2023) MENGHITUNG NERACA MASSA DAN NERACA PANAS SUSPENSION PREHEATER PT SOLUSI BANGUN INDONESIA TBK PABRIK CILACAP. Other thesis, UPN Veteran Yogyakarta.

Astuti, Dian Indri (2023) DESAIN HEAT EXCHANGER SHELL AND TUBE SEBAGAI USULAN PENGGANTI FIN FAN E-0101 PT. PERTAMINA EP REGIONAL 4 ZONA 11 CEPU FIELD, JAWA TENGAH. Diploma thesis, UPN "Veteran" Yogyajarta.

Bawani, Maheswari Kusuma (2023) MENGHITUNG MASSA AIR YANG MENGUAP PADA EVAPORATOR CHILLER PT WAHANA DUTA JAYA RUCIKA PLANT KARAWANG. Diploma thesis, UPN "Veteran" Yogyajarta.

Cholis, Fauzan Nur (2023) Menghitung Neraca Massa dan Neraca Panas, serta Efisiensi pada Rotary Kiln di PT Solusi Bangun Indonesia Tbk Cilacap Plant. Other thesis, UPN Veteran Yogyakarta.

DARMAWAN, MUHAMAD ILHAM (2023) PERBAIKAN KEBISINGAN AREA SETTLER MENGGUNAKAN METODE MAEKAWA DAN SIMULASI SISTEM DINAMIS UNTUK MENINGKATAN PRODUKSI. Other thesis, UPN "Veteran" Yogyajarta.

DELFIA, MARIA and MUZAKKI, MUHAMMAD FANNY (2023) PRARANCANGAN PABRIK KIMIA GLISEROL DARI CRUDE PALM OIL(CPO) DAN NATRIUM HIDROKSIDA (NaOH) KAPASITAS 80.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Darmaputri, Riyantika (2023) PENERAPAN INTEGRASI PANAS PADA PROSES PEMANASAN CRUDE OIL PADA PT. KILANG PERTAMINA INTERNASIONAL REFINERY UNIT VI BALONGAN. Diploma thesis, UPN "Veteran" Yogyajarta.

Dewanda, Rizki Tiara and Latifah, Nurul (2023) PRARANCANGAN PABRIK KIMIA KLOROFORM DARI ASETON DAN KALSIUM HIPOKLORIT KAPASITAS 50.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Dewi, Maurint Rosita (2023) MENGHITUNG NERACA MASSA, NERACA PANAS DAN EFISENSI PANAS PADA ROTARY KILN UNIT RKC-1 PT SEMEN INDONESIA (PERSERO) Tbk. PABRIK TUBAN. Diploma thesis, UPN "Veteran" Yogyajarta.

ERIS, INGGIS SULAIHAYA (2023) ANALISIS NILAI EFISIENSI FIRE TUBE BOILER MENGGUNAKAN METODE LANGSUNG – TIDAK LANGSUNG PADA SISTEM PEMBANGKIT STEAM DI PT PERHUTANI ANUGERAH KIMIA. Diploma thesis, UPN "Veteran" Yogyajarta.

Ekasari, Yunita Nolwana (2023) MENGHITUNG KEBUTUHAN PANAS INJECTION MOLDING PADA PT WAHANA DUTA JAYA RUCIKA PLANT KARAWANG. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Erriane G., Alodia Chanis (2023) MENGHITUNG NERACA MASSA, NERACA PANAS, SERTA EFISIENSI FURNACE 120-F-601 UNIT LIGHT NAPHTHA HYDROTREATING (LNHT) DI PT KILANG PERTAMINA INTERNASIONAL (KPI) RU IV CILACAP, JAWA TENGAH. Diploma thesis, UPN "Veteran" Yogyajarta.

Eudia, Sisilia Vina (2023) PERHITUNGAN DAYA EXTRUDER DALAM PRODUKSI BLOWN FILM DI PT RAJAWALI CITRAMASS MOJOKERTO. Diploma thesis, UPN 'Veteran" Yogyakarta.

FAADHILAH, DAFFA AFLAHA and NAUFA, MUHAMMAD ATHIF (2023) PRARANCANGAN PABRIK KIMIA ALUMINIUM SULFAT DARI BAUKSIT DAN ASAM SULFAT KAPASITAS 60.000 TON / TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Farida, Efa (2023) MENGHITUNG EFISIENSI PANAS HIGH PRESSURE HEATER (HPH) 4 PADA UNIT 4 PLTU PT PLN NUSANTARA POWER UP GRESIK. Other thesis, UPN Veteran Yogyakarta.

Febriana, Lucky Awanda (2023) MENGHITUNG EFISIENSI COMPRESSOR UNIT GTG 1.2 PT INDONESIA POWER SEMARANG POWER GENERATION UNIT. Diploma thesis, UPN "Veteran" Yogyajarta.

Fitriyanti, Fitriyanti (2023) EVALUASI HEAT EXCHANGER 21E-4ABCD PADA HIGH VACUUM UNIT I DI KILANG LUBE OIL COMPLEX I PT. KILANG PERTAMINA INTERNASIONAL RU IV CILACAP. Diploma thesis, UPN "Veteran" Yogyajarta.

Ginting, Sisca Wahyu Nisura and Tyas, Kezia Ayuning (2023) PRARANCANGAN PABRIK KIMIA ASAM ADIPAT DARI SIKLOHEKSANOL DAN ASAM NITRAT KAPASITAS 150.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Gunawan, Candra Putra (2023) MENGHITUNG NERACA MASSA PADA PRODUKSI α-PINENE DAN δ-CARENE DI PERUM PERHUTANI PINE CHEMICAL INDUSTRY (PPCI) PEMALANG. Other thesis, UPN Veteran Yogyakarta.

Gusminanda, Amelia Meity and Afif, Muhammad Fakhrizal (2023) PRARANCANGAN PABRIK KIMIA METIL AKRILAT DARI ASAM AKRILAT DAN METANOL KAPASITAS PRODUKSI 30.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

HUTAMA, MUHAMMAD ALAF ANHAR (2023) PENINGKATAN MUTU WAKTU PELAYANAN INSTALASI FARMASI DENGAN PENDEKATAN LEAN HEALTHCARE (Studi Kasus pada Instalasi Farmasi Rawat Jalan RSUD Panembahan Senopati Bantul). Other thesis, UPN "Veteran" Yogyajarta.

HUTASOIT, ANGGITA (2023) PERANCANGAN ALAT BANTU UNTUK MENGURANGI RESIKO CIDERA KERJA (Studi kasus pada UMKM Global Frame, Cengkareng, Jakarta Barat). Other thesis, UPN "Veteran" Yogyajarta.

Habibulloh, Fadhil Ponco Nur (2023) EFISIENSI ALAT CARBAMATE CONDENSER (EA-101) UNIT UREA IB PT. PETROKIMIA GRESIK. Other thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Hamid, Muhammad Ashshidiqy (2023) PENENTUAN KONDISI PROSES PEREBUSAN KELAPA SAWIT YANG OPTIMAL UNTUK MEMINIMALKAN OIL LOSSES PADA CRUDE PALM OIL DENGAN METODE TAGUCHI (Studi kasus di PT Bengkulu Sawit Lestari, Bengkulu Selatan, Bengkulu). Other thesis, UPN "Veteran" Yogyakarta.

Hamzah, Favian (2023) EFISIENSI TERMAL PADA MAIN CONDENSER (E-101) PT GEO DIPA ENERGI (PERSERO) UNIT DIENG. Diploma thesis, UPN "Veteran" Yogyajarta.

Hartiti, Febriana (2023) MENGHITUNG EFISIENSI THERMAL BOILER PADA PLTU UNIT 4 PT PLN NUSANTARA POWER UP GRESIK. Diploma thesis, UPN "Veteran" Yogyajarta.

Herangga, Bradipa (2023) PERENCANAAN UKURAN BAHAN BAKU DALAM PRODUKSI KARDUS UNTUK MENGURANGI WASTE MATERIAL DENGAN PENDEKATAN ALGORITMA K-MEANS (Studi Kasus di CV Sumber Mitra Usaha, Sleman). Other thesis, UPN "Veteran" Yogyajarta.

Herlane, Hafidzie Tadwa (2023) PRARANCANGAN PABRIK KIMIA VINIL ASETAT MONOMER DARI ETILENA, OKSIGEN, DAN ASAM ASETAT KAPASITAS 60.000 TON/TAHUN. Other thesis, UPN Veteran Yogyakarta.

Hermawan, Hidayat Rais and Majid, Muhammad Fathan Abdul (2023) PRARANCANGAN PABRIK KIMIA PROPILEN GLIKOL DARI PROPILEN OKSIDA DAN AIR KAPASITAS 42.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Indiastuti, Aura (2023) EVALUASI KINERJA ECONOMIZER HE 711 TYPE PLATE HEAT EXCHANGER PADA PROSES REFINERY PLANT III DI PT SALIM IVOMAS PRATAMA, TBK SURABAYA. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Isdayanti, Erni and Rohwati, Rohwati (2023) PRARANCANGAN PABRIK KIMIA ISOBUTIL PALMITAT DARI ASAM PALMITAT DAN ISOBUTANOL KAPASITAS 30.000 TON/TAHUN. Other thesis, UPN Veteran Yogyakarta.

Kamila, Arina Bintan and Chasanah, Lu’lu’ Halimatul (2023) PRARANCANGAN PABRIK KIMIA AMONIUM NITRAT DARI ASAM NITRAT DAN AMONIA KAPASITAS 60.000 TON/TAHUN. Other thesis, UPN Veteran Yogyakarta.

Kartiningsih, Aprilia (2023) ANALISIS EFISIENSI KINERJA KONDENSOR PADA UNIT 1 DI PT. PLN NUSANTARA POWER UP INDRAMAYU. Diploma thesis, UPN "Veteran" Yogyajarta.

Ketaren, Stefania BR (2023) PRARANCANGAN PABRIK KIMIA MAGNESIUM SULFAT DARI MAGNESIUM OKSIDA DAN ASAM SULFAT KAPASITAS 100.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Latifah, Umi (2023) EVALUASI KINERJA GRATE COOLER PADA PROSES PEMBUATAN SEMEN DI PT SINAR TAMBANG ARTHALESTARI. Diploma thesis, UPN "Veteran" Yogyajarta.

Litaay, Rico Mitchell and Ruru, Hizkia (2023) PRARANCANGAN PABRIK KIMIA PROPILEN DIKLORID DARI PROPILEN DAN KLORIN KAPASITAS 100.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

MAHARANI, EDITA SABILA (2023) PENGENDALIAN KUALITAS UNTUK MENURUNKAN TINGKAT CACAT HANGING THREAD BAJU BONEKA BARBIE MENGGUNAKAN SIX SIGMA (Studi Kasus di PT Integrated Green Packaging International Bantul). Other thesis, UPN "Veteran" Yogyajarta.

MAHARDHIKA, SEPTIA (2023) PERBAIKAN RANCANGAN ALAT PENAMPUNG NIRA KELAPA DENGAN METODE QUALITY FUNCTION DEPLOYMENT (QFD) DAN VALUE ENGINEERING GUNA MENJAGA KUALITAS NIRA (Studi kasus: UMKM Gula Jawa Bu Parti). Other thesis, UPN "Veteran" Yogyajarta.

MARHAENDRI, ANNISA WIDYA CEMARA and RAHMAWATI, KINKIN KUMALASARI (2023) PRARANCANGAN PABRIK KIMIA DODEKILBENZENA DARI BENZENA DAN DODEKEN KAPASITAS 40.000 TON/TAHUN. Other thesis, UPN Veteran Yogyakarta.

MEILIAWATI, DILA AJENG (2023) IMPLEMENTASI ALGORITMA K-NEAREST NEIGHBOR DAN METODE GRAY LEVEL CO-OCCURANCE MATRIX DALAM KLASIFIKASI JENIS JAMUR. Other thesis, UPN "Veteran" Yogyajarta.

Maftukah, Rohmatul (2023) Evaluasi Kinerja Fire-tube Boiler Pabrik Spiritus Madukismo. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Mahesa, Achmad Fadhil (2023) MENGHITUNG NERACA MASSA, NERACA PANAS DAN EFISIENSI PADA COOLING TOWER DI DEPARTEMEN OPERASI PUSRI-1B PT. PUPUK SRIWIDJAJA PALEMBANG. Other thesis, UPN Veteran Yogyakarta.

Mirawati, Fevi and Wakhidah, Ulfa Nur (2023) PRARANCANGAN PABRIK KIMIA METIL TERSIER BUTIL ETER DARI ISOBUTILEN DAN METANOL KAPASITAS 150.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Muhammad Reza A, Muhammad Reza A and Sabila, Eriana Hasti (2023) PRARANCANGAN PABRIK KIMIA TERT-AMYL METHYL ETHER (TAME) DARI METHANOL DAN ISOAMYLENE KAPASITAS 65.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

NUGRAHA, FIKRI EKA (2023) MENGHITUNG NERACA MASSA, NERACA PANAS DAN EFFISIENSI PADA ROTARY DRYER PT. SINAR SAKTI KIMIA SUKOHARJO. Diploma thesis, UPN "Veteran" Yogyajarta.

NUGRAHA, RISKY AULIA (2023) PENERAPAN OBJECT DETECTION MENGGUNAKAN CONVOLUTIONAL NEURAL NETWORK ARSITEKTUR VGG16 UNTUK MENDETEKSI MASKER DI ERA PASCA PANDEMI. Other thesis, UPN "Veteran" Yogyajarta.

Nafi’ah, Nida Zulfa (2023) EFEKTIVITAS GASKETED PLATE HEAT EXCHANGER PADA DEGUMMING DAN BLEACHING SECTION REFINERY PLANT III DI PT SALIM IVOMAS PRATAMA Tbk SURABAYA. Diploma thesis, UPN "Veteran" Yogyajarta.

Nainggolan, Timothy Gabor Felix (2023) PRARANCANGAN PABRIK KIMIA BIODIESEL DARI CRUDE PALM OIL DAN METANOL KAPASITAS 80.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Nanda, Alviga Gustya (2023) EVALUASI KINERJA SATURATOR R-301 ABCD PADA UNIT ZA III DEPARTEMEN PRODUKSI IA PT PETROKIMIA GRESIK. Diploma thesis, UPN "Veteran" Yogyajarta.

Nazira, Felia Sheila and Hasanah, Nabilah Nur (2023) PRARANCANGAN PABRIK KIMIA BENZIL ALKOHOL DARI HIDROLISIS BENZIL KLORIDA DAN AIR KAPASITAS 26.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Nina, Medisa Ayu (2023) Analisis Neraca Massa dan Neraca Panas, Serta Efisiensi Pada Rotary Dryer di Plant 9 PT. Indocement Tunggal Prakarsa Tbk. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Nofitiana, Widi (2023) MENGHITUNG NERACA MASSA DAN NERACA PANAS PRE-NEUTRALIZER TANK R-103 PRODUKSI PHONSKA I PT PETROKIMIA GRESIK. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Nuansa, Citrasmara Galuh (2023) MENGHITUNG EFISIENSI FURNACE PADA PEMBUATAN CULLET RASIO TINGGI DI PT SINAR SAKTI KIMIA SUKOHARJO. Diploma thesis, UPN "Veteran" Yogyajarta.

Nuraziza, Adriani (2023) ANALISA PERBAIKAN KUALITAS PELAYANAN JASA MENGGUNAKAN METODE QUALITY FUNCTION DEPLOYMENT (QFD) (Studi Kasus di PERUM DAMRI Denpasar, Bali). Other thesis, UPN "Veteran" Yogyajarta.

Oktaviana, Afifah Hasna and Gaffar, Yusuf Afnan (2023) PRARANCANGAN PABRIK KIMIA METIL LAKTAT DARI METHANOL DAN ASAM LAKTAT KAPASITAS 15.000 TON/TAHUN. Other thesis, UPN Veteran Yogyakarta.

Permatasari, Anindhita Dyah and Herning, Naufal Falah (2023) PRARANCANGAN PABRIK KIMIA ISOOKTANA DARI ISOBUTANA DAN BUTENA KAPASITAS 60.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Pradana, Muhammad Riski (2023) MENGHITUNG NERACA MASSA PRODUKSI AIR JERNIH DENGAN BAHAN KOAGULAN PAC DAN DESINFEKTAN GAS CHLORIN PERUMDAM TIRTAWIJAYA CILACAP. Other thesis, UPN Veteran Yogyakarta.

Prakoso, Erol Yudhi (2023) MENGHITUNG EFISIENSI DAN EVALUASI KERJA GRATE COOLER PT SOLUSI BANGUN INDONESIA Tbk PABRIK CILACAP. Other thesis, UPN Veteran Yogyakarta.

Pratiwi, Ayu Yudha and Salsabila, Fairuz Hana (2023) PRARANCANGAN PABRIK KIMIA FOSGEN DARI KLORIN DAN KARBON MONOKSIDA DENGAN KAPASITAS 55.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Pratiwi, Khusnul Diah and Haryudanti, Annisa Wahyuningrum (2023) RARANCANGAN PABRIK KIMIA DISIANO BUTENA DARI NATRIUM SIANIDA DAN DIKLORO BUTENA KAPASITAS 35.000 TON/ TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Prihastuti, Hana Margareta (2023) MENGHITUNG NERACA MASSA DAN NERACA PANAS BOILER DI PABRIK GONDORUKEM DAN TERPENTIN SUKUN PONOROGO JAWA TIMUR. Diploma thesis, UPN "Veteran" Yogyakarta.

Putra, Andra Reka and Fransisca, Natalia (2023) PRARANCANGAN PABRIK KIMIA ETIL AKRILAT DARI ASAM AKRILAT DAN ETANOL KAPASITAS 60.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Putri, Ana Nur Laily Darsono and Liana, Fonda Mei (2023) PRARANCANGAN PABRIK KIMIA ETIL KLORIDA DARI ETILEN DAN ASAM KLORIDA KAPASITAS 35.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Putri, Nefada Sherliana Khalifah (2023) Evaluasi Performa Heat Exchanger Unit 11-E-102 PT. Kilang Pertamina Internasional Refinery Unit VI Balongan. Other thesis, UPN Veteran Yogyakarta.

RAFIFAH, SARAH (2023) INTEGRASI METODE STEP-WISE WEIGTH ASSESSMENT RATIO ANALYSIS (SWARA) DAN ADDITIVE RATIO ASSESSMENT (ARAS) UNTUK MENENTUKAN PRIORITAS SUPPLIER (Studi Kasus di CV Sumber Mitra Usaha, Selomartani, Kalasan, Sleman). Other thesis, UPN "Veteran" Yogyajarta.

RAHMAN, ALFIN (2023) EFISIENSI WASTE HEAT BOILER-1 PLANT ASAM SULFAT PT TIMURAYA TUNGGAL KARAWANG. Other thesis, UPN Veteran Yogyakarta.

RAHMAWATI, SHELINA DEWI and SARI, INDRI WULAN (2023) PRARANCANGAN PABRIK KIMIA SORBITOL DARI DEKSTRIN KAPASITAS 30.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

RAMADHAN, ANANDA RIZKY and SHANTI, RIKHA RAMA (2023) PRARANCANGAN PABRIK KIMIA ASAM LEMAK DARI MINYAK KELAPA SAWIT DAN AIR KAPASITAS 150.000 TON/TAHUN. Other thesis, UPN 'Veteran" Yogyakarta.

RIFALDINO, RIFALDINO (2023) USULAN PERBAIKAN KUALITAS PRODUK KAIN GREY JENIS PS 946 MENGGUNAKAN METODE FUZZY FAILURE MODE AND EFFECT ANALYSIS UNTUK MENGURANGI TINGKAT KECACATAN PRODUK (Studi kasus di PT Primissima, Sleman). Other thesis, UPN "Veteran" Yogyajarta.

RIZKY, CHAIRUNISA VANIA (2023) PENGENDALIAN KUALITAS KERAMIK LANTAI UNTUK MEMINIMASI DEFECT PRODUCT DENGAN METODE SIX SIGMA DAN GREY FAILURE MODE EFFECT ANALYSIS (G-FMEA) (Studi Kasus di PT Keramika Indonesia Asosiasi Tbk di Karawang). Other thesis, UPN "Veteran" Yogyajarta.

ROSYANA, KEVIN (2023) OPTIMASI PARAMETER PROSES PRODUKSI BATIK CAP TERHADAP KETAHANAN LUNTUR WARNA DENGAN METODE TAGUCHI (Studi Kasus di UMKM Batik Sekar Idaman, Sleman). Other thesis, UPN "Veteran" Yogyajarta.

Raharja, Mochamad Adimas (2023) “MERANCANG PIPA UNTUK MENGALIRKAN PRODUK GREEN DIESEL DARI UNIT 018 THERMAL DISTILLATE HYDROTREATER (TDHT) KE TANGKI PENYIMPANAN PADA KILANG FOC II DI PT. PERTAMINA (PERSERO) RU-IV CILACAP”. Diploma thesis, UPN "Veteran" Yogyajarta.

Rahmantara, Ilham and Pangestu, Fadlilla Diaz (2023) PRARANCANGAN PABRIK KIMIA PHENYLMETHANOL DARI BENZIL CHLORIDE MELALUI PROSES HIDROLISIS KAPASITAS 12.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Rahmawati, Yulia (2023) MENGHITUNG EFISIENSI ROTARY DRYER PRODUKSI PHONSKA IV PT PETROKIMIA GRESIK. Other thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Ramadhan, Rifki Aulia and Syuhada, Muhammad Toha (2023) PRARANCANGAN PABRIK KIMIA GLISEROL MONOSTEARAT DARI GLISEROL DAN ASAM STEARAT KAPASITAS 50.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Ramadhan, Rifki Aulia and Syuhada, Muhammad Toha (2023) PRARANCANGAN PABRIK KIMIA GLISEROL MONOSTEARAT DARI GLISEROL DAN ASAM STEARAT KAPASITAS 50.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Rasyid, Handira Ainur (2023) MENGHITUNG EFISIENSI THERMAL ROTARY COOLER M-2125 PADA PABRIK NPK II PT. PETROKIMIA GRESIK. Other thesis, UPN Veteran Yogyakarta.

Riyani, Febi (2023) ANALISA EFISIENSI KINERJA COOLING TOWER PADA POWER PLANT PT. GEO DIPA ENERGI (PERSERO) UNIT DIENG. Diploma thesis, UPN "Veteran" Yogyajarta.

Rizki, Andini Hawalia and Hasibuan, Juana Hizkia (2023) PRARANCANGAN PABRIK KIMIA PROPYLENE DENGAN PROSES DEHIDROGENASI PROPANE KAPASITAS 215.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Rizki, Andini Hawalia and Hasibuan, Juana Hizkia (2023) PRARANCANGAN PABRIK KIMIA PROPYLENE DENGAN PROSES DEHIDROGENASI PROPANE KAPASITAS 215.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Rizkiafan, Muhammad Nurki and Rayhananda, Muhammad Hilmy (2023) PRARANCANGAN PABRIK KIMIA EPIKLOROHIDRIN DARI DIKLOROHIDRIN DAN NATRIUM HIDROKSIDA KAPASITAS 1 4 0 . 0 0 0 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Rodhiyah, Latifatul (2023) MENGHITUNG NERACA MASSA, NERACA PANAS, DAN EFISIENSI TERMAL PADA BOILER di PLTU UNIT 3 PT. PLN NUSANTARA POWER UP GRESIK. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Rohmah, Hana Nur (2023) PENENTUAN KINETIKA FERMENTASI DAN EFISIENSI PROSES PRODUKSI ETANOL PADA TANGKI MAIN FERMENTER DI UNIT FERMENTASI PT INDO ACIDATAMA Tbk. Diploma thesis, UPN "Veteran" Yogyajarta.

SAWITRI, FADHILLA ANJAR and KUSUMAWARDANI, SAVIRA PUTRI (2023) PRARANCANGAN PABRIK KIMIA AKRILAMIDA DARI AKRILONITRIL DAN AIR KAPASITAS 40.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

SILALAHI, JULIANS HANATA (2023) PERANCANGAN MESIN PENCACAH BAHAN ORGANIK UNTUK MEMPERCEPAT WAKTU PROSES MENGGUNAKAN METODE PAHL AND BEITZ. Other thesis, UPN "Veteran" Yogyajarta.

Safitri, Anni (2023) SIMULASI PENGARUH INTERVENSI ERGONOMI PADA LINGKUNGAN KERJA FISIK DI BAGIAN KERNEL RECOVERY TERHADAP KEUNTUNGAN PERUSAHAAN (Studi kasus di PT Tri Bahtera Srikandi, Sumatera Utara). Other thesis, UPN "Veteran" Yogyajarta.

Sahila, Karima (2023) MENGHITUNG NERACA MASSA, NERACA PANAS, DAN EFISIENSI DARI COOLING TOWER UREA UNIT UTILITY 1B PT PUPUK KUJANG (PERSERO) CIKAMPEK, JAWA BARAT. Other thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Sau, Baso Tenri (2023) EVALUASI KINERJA MIXED BED A DAN MIXED BED B PADA AREA WTP UNIT 3A (1x1000 MW) PT. SUMBER SEGARA PRIMADAYA (PLTU) CILACAP. Diploma thesis, UPN "Veteran" Yogyajarta.

Selo, Tasha Mutiara (2023) ANALISA KELAYAKAN INVESTASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) DI GUDANG KARAWACI DENGAN METODE LCOE, NPV, IRR, PI DAN DPP (Studi kasus di PT. Rancang Prima Sejahtera). Other thesis, UPN Veteran Yogyakarta.

Setiawati, Febrianza Dewi and Christi, Dhea Ratriana (2023) PRARANCANGAN PABRIK KIMIA BUTADIENA SULFON DARI 1,3 BUTADIENA DAN SULFUR DIOKSIDA KAPASITAS 100.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Sumarsono, Devmitha Nur Haqy (2023) MENGHITUNG EFISIENSI TERMAL PACKAGE BOILER (B-BF 4101) PADA UNIT UTILITAS 1B DI PT PUPUK KUJANG CIKAMPEK. Diploma thesis, UPN "Veteran" Yogyajarta.

Supartono, Ahmad Rizki (2023) MENGHITUNG NERACA MASSA, NERACA PANAS, DAN EFISIENSI MELTER V-1102 PADA UNIT PABRIK 1 DI PERHUTANI PINE CHEMICAL INDUSTRY PEMALANG. Other thesis, UPN "Veteran" Yogyajarta.

Suryaningdyah, Pandulu Pancer (2023) “PERANCANGAN PIPA PENAMBAHAN LINE H2 UNTUK UJI COBA PRODUKSI GREEN DIESEL DI UNIT TDHT FOC II PT PERTAMINA RU-IV CILACAP”. Diploma thesis, UPN "Veteran" Yogyajarta.

Suyono, Gedwina Kurnia Putri and Parasu, Prisma Christin Fitria (2023) PRARANCANGAN PABRIK KIMIA N-BUTIL METAKRILAT DARI ASAM METAKRILAT DAN N-BUTANOL KAPASITAS 70.000 TON/TAHUN. Other thesis, UPN Veteran Yogyakarta.

Syahrizy, Arfan Danang (2023) EVALUASI PERFORMA DOUBLE PIPE HEAT EXCHANGER E-0506 PT.PERTAMINA EP ASSET 4 FIELD CEPU. Diploma thesis, UPN "Veteran" Yogyajarta.

Utami, Tri (2023) EVALUASI KINERJA ROTARY KILN PLANT IV PT. SEMEN INDONESIA (PERSERO) Tbk. PABRIK TUBAN. Other thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Wafilona, Hibatulloh Caesar and Putri, Anggieta Dianasti Diana (2023) PRARANCANGAN PABRIK KIMIA GLISEROL DARI ALIL ALKOHOL DAN HIDROGEN PEROKSIDA KAPASITAS 50.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyajarta.

Wibisana, Taufik Anggita and Sutha, Primmada (2023) PRARANCANGAN PABRIK KIMIA ASETANILIDA DARI ASAM ASETAT DAN ANILIN KAPASITAS 40.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Wibisono, Tegar Herlambang and Saputro, Andriyan Dwi (2023) PRA RANCANGAN PABRIK KIMIA METIL PENTANOAT DARI ASAM PENTANOAT DAN METANOL KAPASITAS 40.000 TON/TAHUN. Other thesis, UPN 'Veteran" Yogyakarta.

Wibiyanto, Stanislaust Lucas (2023) PRARANCANGAN PABRIK KIMIA ASAM AKRILAT DARI PROPILENA DAN UDARA KAPASITAS PRODUKSI 100.000 TON/TAHUN. Other thesis, UPN "Veteran" Yogyakarta.

Wibowo, Bagus Satrio and Putra, Rafi Sianjanna (2023) PRARANCANGAN PABRIK KIMIA BENZONITRIL DARI AMONIA, TOLUENA, DAN UDARA KAPASITAS 40.000 TON/TAHUN. Other thesis, UPN Veteran Yogyakarta.

Wicaksono, Haldy Gayuh (2023) EVALUASI KINERJA MAIN CONDENSER (E-101) PADA POWER PLANT DI PT GEODIPA ENERGI (PERSERO) UNIT DIENG. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

Widiyanto, Nugroho (2023) ANALISIS KINERJA FLUIDIZING BED DRYER (FF-301) DEPARTEMEN OPERASI P-III UNIT UREA PT. PUPUK SRIWIDJAJA PALEMBANG. Diploma thesis, UPN "Veteran" Yogyajarta.

YOHANES, STANLEY and PRATAMA, YUDHA CAKRA (2023) PRARANCANGAN PABRIK KIMIA N-BUTIL AKRILAT DARI ASAM AKRILAT DAN N-BUTANOL KAPASITAS 40.000 TON/TAHUN. Diploma thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

This list was generated on Fri Sep 27 16:47:58 2024 WIB.