USULAN PERBAIKAN PROSES PRODUKSI ALAT KESEHATAN UNTUK MEMINIMASI WASTE MENGGUNAKAN METODE LEAN SIX SIGMA (Studi Kasus di PT Presisi Mandiri Industri di Bantul)

MINATA, RAFI SURYA (2025) USULAN PERBAIKAN PROSES PRODUKSI ALAT KESEHATAN UNTUK MEMINIMASI WASTE MENGGUNAKAN METODE LEAN SIX SIGMA (Studi Kasus di PT Presisi Mandiri Industri di Bantul). Skripsi thesis, UPN Veteran Yogyakarta.

[thumbnail of 1_Skripsi Full_122210125_Rafi Surya Minata.pdf] Text
1_Skripsi Full_122210125_Rafi Surya Minata.pdf
Restricted to Repository staff only

Download (5MB)
[thumbnail of 2_Cover_122210125_Rafi Surya Minata.pdf] Text
2_Cover_122210125_Rafi Surya Minata.pdf

Download (185kB)
[thumbnail of 3_Abstrak_122210125_Rafi Surya Minata.pdf] Text
3_Abstrak_122210125_Rafi Surya Minata.pdf

Download (225kB)
[thumbnail of 4_Halaman Pengesehan_122210125_Rafi Surya Minata.pdf] Text
4_Halaman Pengesehan_122210125_Rafi Surya Minata.pdf

Download (276kB)
[thumbnail of 5_Daftar Isi_122210125_Rafi Surya Minata.pdf] Text
5_Daftar Isi_122210125_Rafi Surya Minata.pdf

Download (261kB)
[thumbnail of 6_Daftar Pustaka_122210125_Rafi Surya Minata.pdf] Text
6_Daftar Pustaka_122210125_Rafi Surya Minata.pdf

Download (189kB)

Abstract

ABSTRAK
PT Presisi Mandiri Industri merupakan salah satu perusahaan industri
manufaktur yang bergerak dalam penyediaan alat kesehatan di Indonesia. Seiring
dengan meningkatnya permintaan pada bulan Juli hingga Desember 2024, PT
Presisi Mandiri Industri telah menghadapi masalah yang disebabkan adanya
pemborosan (waste) pada proses produksi. Salah satu waste yang ditemukan yaitu
produk defect sebesar 1618 produk dengan persentase 6,5%. Produk defect tersebut
menyebakan terjadinya over processing dan kemungkinan waste lainnya yang
menyebabkan waktu proses produksi menjadi lebih lama.
Penelitian ini menggunakan metode Lean Six Sigma dengan penerapan
konsep lean manufacturing dengan membuat Value Stream Mapping (VSM) untuk
mengidentifikasi aliran proses dari awal hingga akhir serta aktivitas value added,
non-value added, dan necessary non-value added. Penerapan metodologi DMAIC
(Define, Measure, Analyze, Improve, Control) untuk menganalisis akar penyebab
masalah dan memberikan usulan perbaikan yang dapat diterapkan oleh perusahaan
secara berkelanjutan.
Analisis menunjukkan pada bulan Juli hingga Desember 2024 rata-rata nilai
sigma sebesar 3,85 sehingga masih diperlukan perbaikan pada proses produksi alat
kesehatan. Usulan perbaikan yang dilakukan pada future state value stream
mapping yaitu penambahan SOP tentang pengisian check sheet seperti
penggabungan aktivitas pemeriksaan produk dengan aktivitas pengisian check
sheet, penambahan mesin cuci untuk mencukupi 5 proses pencucian, dan
penambahan mesin pengering yang otomatis. Usulan perbaikan tersebut
meningkatkan nilai Process Cycle Efficiency (PCE) dari 62% menjadi 70%.
Kata Kunci: Lean six sigma, Value stream mapping, Failure mode and effect
analysis (FMEA)
ix
Improvement Proposal of Medical Device Production Process
to Minimize Waste Using Lean Six Sigma Method
ABSTRACT
PT Presisi Mandiri Industri is a manufacturing company specializing in the
production and distribution of medical devices in Indonesia. During the period from
July to December 2024, the company experienced a significant increase in demand,
which exposed inefficiencies within its production system—primarily caused by
waste. One critical issue identified was a high defect rate, with 1,618 defective units
accounting for 6.5% of total production. This defect rate led to overprocessing and
contributed to additional forms of waste, ultimately extending production cycle
times.
This study applies the Lean Six Sigma methodology, integrating lean
manufacturing tools such as Value Stream Mapping (VSM) to map end-to-end
processes and classify activities into value-added (VA), non-value-added (NVA),
and necessary non-value-added (NNVA). The DMAIC framework (Define,
Measure, Analyze, Improve, Control) is employed to systematically identify root
causes and develop sustainable improvement proposals.
The analysis reveals that the average sigma level from July to December
2024 was 3.85, indicating the need for further process optimization. Based on the
future state VSM, key improvement initiatives include the development of a
Standard Operating Procedure (SOP) for integrated product inspection and check
sheet documentation, the addition of washing machines to support five cleaning
stages, and the installation of automated drying machines. These interventions are
projected to increase Process Cycle Efficiency (PCE) from 62% to 70%, thereby
enhancing overall operational performance.
Keywords: Lean six sigma, Value stream mapping, Failure mode and effect
analysis (FMEA)
x

Item Type: Tugas Akhir (Skripsi)
Uncontrolled Keywords: Lean six sigma, Value stream mapping, Failure mode and effect analysis (FMEA)
Subjek: H Social Sciences > HD Industries. Land use. Labor
Divisions: Fakultas Teknik Industri > (S1) Teknik Industri
Depositing User: Eko Yuli
Date Deposited: 07 Oct 2025 02:21
Last Modified: 07 Oct 2025 02:21
URI: http://eprints.upnyk.ac.id/id/eprint/44103

Actions (login required)

View Item View Item