OPTIMALISASI KERJA ALAT MUAT PC1250 DAN ALAT ANGKUT HD465DALAM MEMENUHI TARGETPRODUKSI LAPISAN MATERIAL PENUTUP PADA PENAMBANGAN BATUBARA DI PT. RICOBANA ABADI SITE PONDOK LABU TANITO HARUM, KALIMANTAN TIMUR

LYDIAHARRY, PRADITYA BARA (2016) OPTIMALISASI KERJA ALAT MUAT PC1250 DAN ALAT ANGKUT HD465DALAM MEMENUHI TARGETPRODUKSI LAPISAN MATERIAL PENUTUP PADA PENAMBANGAN BATUBARA DI PT. RICOBANA ABADI SITE PONDOK LABU TANITO HARUM, KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
RINGKASAN DAN ABSTRACT.pdf

Download (92kB) | Preview

Abstract

RINGKASAN PT. Ricobana Abadi merupakan suatu perusahaan penyewaan alat berat dan kontraktor tambang. Salah satu unit PT. RicobanaAbadipadasaatiniberoperasi di salahsatusite PT. TanitoHarum yang berlokasi di desaPondokLabu, KabupatenKutaiKartenegara, KalimantanTimur.Sistempenambangan yang diterapkanadalahsistempenambanganterbuka. Target produksi lapisan tanah penutup pada tahun 2013 sebesar 1.800.000BCM/bulan. Proses pembongkaran material penutup mengunakan alat mekanis 2 jenis alat muat yaitu Komatsu PC 1250SP-7 dan Komatsu PC 2000- 8dan 2 jenis alat angkut yaitu Komatsu HD 465-7R dan Komatsu HD 785-7. Permasalahan yang terjadi adalahkurangoptimalnya produksi dari alat muatKomatsu PC 1250SP-7 dan alat angkutKomatsu HD 465-7R sehingga target produksi 700.000 BCM/bulan belum tercapai. Kemampuan produksi saat ini adalah 679.216,32 BCM/bulan. Tidak tercapainya sasaran produksi dikarenakan banyak waktu kerja yang terbuang karena adanya hambatan kerja baik hambatan yang bisa dihindari maupun hambatan yang tidak bisa dihindari. Upaya Peningkatan produksi dapat dilakukan dengan cara meningkatan waktu kerja efektif dan waktu kerja tersedia. Dengan meningkatkan waktu kerja tersebut produksi tersebut yang semula sebesar 679.216,32 BCM/bulanmeningkatmenjadi 730.771,94 BCM/bulan. Untuk dapat mencapai target produksi yang diinginkan sebaiknya dilakukan pengawasan waktu kerja yang telah ditetapkan dan perlu adanya aturan standart waktu hambatan yang bisa dihindari. ABSTRACT PT. Ricobana Abadi is a heavy equipment rental company and mining contractor. One unit of PT. Ricobana Abadi currently operating in one site of PT. Tanito Harum located in the village of Pondok Labu, Kartanegara Kutai Regency, East Kalimantan. Mining system applied is an open pit mining. Target production of overburden in 2013 is 1.800.000BCM/month. The loosing processof overburden are using mechanical tools, its two types of loader,Komatsu PC 1250SP -7 and Komatsu PC 2000-8 and 2 types of hauler Komatsu HD 465-7R and Komatsu HD 785-7. Problem occured is suboptimal production loader of Komatsu PC 1250SP- 7 and hauler Komatsu HD 465-7R so that production target 700.000 BCM/month is not reached. The current production capacity is 679.216,32 BCM/month. Not achievement target of production due a lot of loss time. Because to the constraints work, that problems can be reduced ang cannot reduced. That problems can minimize the working time effectively so that low efficiency. Improving production can be done by increasing the effective working time and working time available. By increasing the working time of the previously production of 679,216.32 BCM/month increased to 730,771.94 BCM/month In order to achieve the desired production target should be monitoring working time has been set and need for a standard rules that constraints can be avoided.

Item Type: Thesis (Other)
Subjects: T Technology > TG Bridge engineering
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Basir Umaryadi
Date Deposited: 11 May 2016 07:04
Last Modified: 11 May 2016 07:04
URI: http://eprints.upnyk.ac.id/id/eprint/673

Actions (login required)

View Item View Item