LYDIAHARRY, PRADITYA BARA (2016) OPTIMALISASI KERJA ALAT MUAT PC1250 DAN ALAT ANGKUT HD465DALAM MEMENUHI TARGETPRODUKSI LAPISAN MATERIAL PENUTUP PADA PENAMBANGAN BATUBARA DI PT. RICOBANA ABADI SITE PONDOK LABU TANITO HARUM, KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
RINGKASAN DAN ABSTRACT.pdf Download (92kB) | Preview |
Abstract
RINGKASAN
PT. Ricobana Abadi merupakan suatu perusahaan penyewaan alat berat dan
kontraktor tambang. Salah satu unit PT. RicobanaAbadipadasaatiniberoperasi di
salahsatusite PT. TanitoHarum yang berlokasi di desaPondokLabu,
KabupatenKutaiKartenegara, KalimantanTimur.Sistempenambangan yang
diterapkanadalahsistempenambanganterbuka.
Target produksi lapisan tanah penutup pada tahun 2013 sebesar
1.800.000BCM/bulan. Proses pembongkaran material penutup mengunakan alat
mekanis 2 jenis alat muat yaitu Komatsu PC 1250SP-7 dan Komatsu PC 2000-
8dan 2 jenis alat angkut yaitu Komatsu HD 465-7R dan Komatsu HD 785-7.
Permasalahan yang terjadi adalahkurangoptimalnya produksi dari alat
muatKomatsu PC 1250SP-7 dan alat angkutKomatsu HD 465-7R sehingga target
produksi 700.000 BCM/bulan belum tercapai. Kemampuan produksi saat ini
adalah 679.216,32 BCM/bulan. Tidak tercapainya sasaran produksi dikarenakan
banyak waktu kerja yang terbuang karena adanya hambatan kerja baik hambatan
yang bisa dihindari maupun hambatan yang tidak bisa dihindari.
Upaya Peningkatan produksi dapat dilakukan dengan cara meningkatan
waktu kerja efektif dan waktu kerja tersedia. Dengan meningkatkan waktu kerja
tersebut produksi tersebut yang semula sebesar 679.216,32
BCM/bulanmeningkatmenjadi 730.771,94 BCM/bulan.
Untuk dapat mencapai target produksi yang diinginkan sebaiknya dilakukan
pengawasan waktu kerja yang telah ditetapkan dan perlu adanya aturan standart
waktu hambatan yang bisa dihindari.
ABSTRACT
PT. Ricobana Abadi is a heavy equipment rental company and mining
contractor. One unit of PT. Ricobana Abadi currently operating in one site of PT.
Tanito Harum located in the village of Pondok Labu, Kartanegara Kutai Regency,
East Kalimantan. Mining system applied is an open pit mining.
Target production of overburden in 2013 is 1.800.000BCM/month. The
loosing processof overburden are using mechanical tools, its two types of
loader,Komatsu PC 1250SP -7 and Komatsu PC 2000-8 and 2 types of hauler
Komatsu HD 465-7R and Komatsu HD 785-7.
Problem occured is suboptimal production loader of Komatsu PC 1250SP-
7 and hauler Komatsu HD 465-7R so that production target 700.000 BCM/month
is not reached. The current production capacity is 679.216,32 BCM/month. Not
achievement target of production due a lot of loss time. Because to the constraints
work, that problems can be reduced ang cannot reduced. That problems can
minimize the working time effectively so that low efficiency.
Improving production can be done by increasing the effective working
time and working time available. By increasing the working time of the
previously production of 679,216.32 BCM/month increased to 730,771.94
BCM/month
In order to achieve the desired production target should be monitoring
working time has been set and need for a standard rules that constraints can be
avoided.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TG Bridge engineering |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Basir Umaryadi |
Date Deposited: | 11 May 2016 07:04 |
Last Modified: | 11 May 2016 07:04 |
URI: | http://eprints.upnyk.ac.id/id/eprint/673 |
Actions (login required)
![]() |
View Item |