ANALISIS PENJADWALAN PRODUKSI FLOWSHOP MENGGUNAKAN METODE CAMPBELL DUDEK AND SMITH (CDS) DAN METODE PALMER UNTUK MENGHASILKAN MAKESPAN MINIMUM PADA CHANNEL 9 (Studi Kasus pada PT Svenska Kullagerfabriken Indonesia, Cakung, Jakarta Timur)

Aldeo, Ramadhan Arridho (2019) ANALISIS PENJADWALAN PRODUKSI FLOWSHOP MENGGUNAKAN METODE CAMPBELL DUDEK AND SMITH (CDS) DAN METODE PALMER UNTUK MENGHASILKAN MAKESPAN MINIMUM PADA CHANNEL 9 (Studi Kasus pada PT Svenska Kullagerfabriken Indonesia, Cakung, Jakarta Timur). Other thesis, Universitas Pembangunan Nasional Veteran Yogyakarta.

[img]
Preview
Text
3. Cover Tugas Akhir.pdf

Download (64kB) | Preview
[img]
Preview
Text
5. Daftar Isi Tugas Akhir.pdf

Download (41kB) | Preview
[img]
Preview
Text
4. Lembar Pengesahan.pdf

Download (518kB) | Preview
[img]
Preview
Text
2. Abstrak Tugas Akhir.pdf

Download (15kB) | Preview

Abstract

PT Svenska Kullagerfabriken Indonesia atau yang biasa disebut PT SKF Indonesia merupakan perusahaan bidang manufaktur yang memproduksi bearing yang mempunyai sistem produksi make to order. Proses produksi perusahaan ini terbagi menjadi 3 proses, yaitu proses pengerasan ring, penggerindaan, dan assembling. Dalam proses operasionalnya, perusahaan ini belum melakukan penjadwalan produksi secara optimal di mana dalam hal ini masih mengalami out standing atau kegagalan untuk memenuhi kuantitas total permintaan sesuai dengan due date. Hal ini disebabkan karena aktivitas produksi yang kurang efektif sehingga kemungkinan besar dapat mengurangi kepuasan pelanggan. Berdasarkan masalah tersebut, maka penelitian ini dimaksudkan untuk menentukan penjadwalan produksi agar mendapatkan estimasi total waktu penyelesaian yang minimum. Perhitungan metode CDS menggunakan aturan Johnson Rule dan metode Palmer menggunakan slope index. Metode Campbell Dudek and Smith dan Palmer diharapkan dapat meminimasi total waktu penyelesaian. Hasil dari penelitian ini menunjukkan bahwa metode Campbell Dudek and Smith (CDS) dan Palmer adalah total waktu penyelesaian yaitu 28996 detik untuk sekali proses produksi dengan urutan job 64304-3260-4756-4757. Sesuai dengan rate Channel 9, maka perusahaan dapat menghasilkan 3391 unit bearing dalam 8 jam 4 menit proses produksi. Penelitian ini juga dapat menghasilkan safety stock bagi perusahaan. Kata kunci: Penjadwalan produksi, Campbel Dudek and Smith (CDS), Palmer xi ABSTRACT PT Svenska Kullagerfabriken Indonesia or commonly called PT SKF Indonesia is a manufacturing company that have a make to order production system produces bearings. Production process of this company is divided into 3 processes such as heatreatment, grinding, and assembling. In its operational process, this company has not yet optimally scheduled in this case still experiencing out standing or failure to meet the demand in accordance with the due date. It is because production activities are less effective so that is likely to reduce costumer satisfaction. Based on these problems, this research is intended to determine production scheduling using Campbell Dudek and Smith also Pamer’s method. The CDS method calculation uses Johnson Rule and Palmer method uses the slope index. Campbell Dudek and Smith and Palmer’s method are expected to minimize makespan. The results of this research indicate that CDS and Palmer’s method generate the total amount of completion time of 28996 seconds for a single running process with the job sequence 6304-3260-4756-4757. According to Channel 9’s rate, it can produces 3391 bearing units in 8 hours 4 minutes in a single process. This research can also produce safety stock for companies. Keywords: Scheduling, Campbel Dudek and Smith (CDS), Palmer

Item Type: Thesis (Other)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Sarimin Sarimin
Date Deposited: 02 Oct 2019 03:33
Last Modified: 02 Oct 2019 03:33
URI: http://eprints.upnyk.ac.id/id/eprint/21449