KAJIAN TEKNIS FRAGMENTASI PELEDAKAN UNTUK MEMENUHI TARGET PRODUKSI DI PIT 3000 BLOK 03 PT. MITRA ALAM PERSADA JOBSITE TRUBAINDO COAL MINING, KUTAI BARAT, KALIMANTAN TIMUR

SUTRISNO, HERMAWAN PUTRO (2016) KAJIAN TEKNIS FRAGMENTASI PELEDAKAN UNTUK MEMENUHI TARGET PRODUKSI DI PIT 3000 BLOK 03 PT. MITRA ALAM PERSADA JOBSITE TRUBAINDO COAL MINING, KUTAI BARAT, KALIMANTAN TIMUR. Other thesis, UPN 'VETERAN" YOGYAKARTA.

[img]
Preview
Text
ABSTRACT.pdf

Download (78kB) | Preview

Abstract

PT. Mitra Alam Persada (MAP) is a company that moves in various services of mining sector that is rental instrument, overburden removal, overburden loading, overburden hauling, coal excavation, coal loading, coal hauling and mine planning. PT. MAP is one o f contractor company that handle mine projects of PT. Trubaindo Coal Mining (TCM) which is located in Kutai Barat, Kalimantan Timur. PT. TCM devided into two blocks of mine area, that is North Block and South Block. PT.MAP is located in South Block of PT.TCM, precisely in Pit 3000 Block 03. The coal condition in South Block is multiple seams and the thickness of the coal is between 2,50-3 m with 30 0 of slope from horizontal plane. Mining system that is applied in PT. MAP jobsite PT. TCM is surface mine system. The coal production target of PT. MAP is 85.000 ton in August 2015 and the overburden production target is 620.000 BCM in August 2015. On observations made in the field found the problems associated with rock fragmentation size as blasting results. The target’s percentage of rock fragmentation after blasting with size >80 cm (boulder) is less than 20% from blasting rock material. In actual condition, the rock fragmentation with size >80 cm percentage as results from five times blasting in PT. MAP is more than 20% which is consist of 28,77% in 12 nd August 2015; 28,33% in 14 th August 2015; 29,17% in 18 th August 2015; 29,37% in 22 nd August 2015; 30,41% in 26 th August 2015. In some experiments that have been done in 27 th August 2015 there are 20,93% of boulder and in 31 st August 2015 there are 19% of boulder. Blast geometry that applied by PT. MAP which have 7 m of burden and 8 m of spacing with8-8,5 m of drill hole length, can not achieve the target of rock fragmentation with size >80 cm percentage which is less than 20%. Based on blast geometry calculation according R.L. Ash (1967) and increasing the area of energy coverage, blast geometry that should be applied is 6 m of burden, 7 m of spacing, 4,2 m of stemming, 4,6 m of powder charge, 9 m of drill hole length and increasing powder factor from 0,22 kg/m 3 becomes 0,32 kg/m 3 . Simulation of recommendation blast geometry using Kuz-Ram method produce 14,03% of rock fragmentation after blasting with size >80 cm and 14,7% of corrected rock fragmentation after blasting with size >80 cm

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Darsini Darsini
Date Deposited: 16 May 2016 03:32
Last Modified: 16 May 2016 03:32
URI: http://eprints.upnyk.ac.id/id/eprint/956