On mining activities at PT.Ciptakridatama site MHU Tanjung Laong the
presence of mechanical devices would greatly support the success of that operation
itself. So its use must be calculated precisely in order to achieve optimal results.
Based on the fact in the field is still not working good between loading tools and
transport tools so productivity of mechanical devices that work is not in fullfiled the
planned production targets. Improved work efficiency between loading tools and
transport tool greatly affect the achievement of production targets. Mining system
used was the open pit. By using the excavator loading and transport CAT 329DL
excavators 1 unit, 1 unit of CAT 336D excavator, CAT 320D excavator 2 unit as a
support unit and truck unit Hino 8 FM260JD.Production target planne d by the
company amounted to 150,000 tons / month. Based on calculations, coal production
is now only 107,036.595 tons / month, resulting in a shortfall of 42,963.405 tons /
month. Failure to achieve production targets because the number of effective
working time lost because of the obstacles that occur, both obstacles can be avoided
and obstacles that can not be avoided. The amount of Effective Utilization (EU) will
affect the EU's production of 47.3% and unloading tools and transport equipment
amounted to 31.84%.The achievement of production targets is done by increasing the
effective ultilization to make improvements to the barriers - barriers so effective
ultilization unloading tools and transport tools could rise to 50.01%. Production of
transportation equipment increased to 168,189.704 tons / month.

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Darsini Darsini
Date Deposited: 16 May 2016 02:34
Last Modified: 16 May 2016 02:34
URI: http://eprints.upnyk.ac.id/id/eprint/927

Actions (login required)

View Item View Item