PT. Lafarge Cement Indonesia adalah perusahaan yang bergerak di bidang
usaha produksi semen. PT. Lafarge Cement Indonesia memiliki tambang
batugamping yang izin usaha pertambangannya dipegang oleh PT. Aroma Cipta
Anugrahtama terletak di kawasan Desa Mon Ikeun, Kecamatan Lhoknga,
Kabupaten Aceh Besar, Provinsi Aceh.
Metode penambangan yang diterapkan adalah metode penambangan
terbuka. Kegiatan penambangan batugamping dilakukan oleh PT. Macmahon
Indonesia, yang terdiri dari proses pembongkaran batugamping dengan metode
peledakan, pemuatan, dan pengangkutan batugamping dari tambang menuju ROM
atau hopper. Alat muat yang digunakan adalah excavator backhoe Caterpillar
390D sebanyak 1 unit dan alat angkut yang digunakan adalah dump truck
Caterpillar 773B sebanyak 3 unit.
Target produksi batugamping yang ditetapkan oleh PT. Lafarge Cement
Indonesia adalah sebesar 165.208 ton/bulan. Permasalahan yang terjadi adalah
belum tercapainya target produksi dari alat muat dan alat angkut, di mana
produksi pada saat ini adalah sebesar 140.258 ton/bulan. Belum tercapainya target
produksi dikarenakan adanya faktor-faktor seperti jalan angkut yang sempit, dan
waktu kerja yang hilang karena adanya hambatan kerja, baik hambatan yang dapat
dihindari maupun hambatan yang tidak dapat dihindari.
Upaya pencapaian target produksi dilakukan dengan cara pelebaran jalan
angkut, dan peningkatan efisiensi kerja. Setelah dilakukan upaya perbaikan pada
jalan angkut didapatkan peningkatan produksi menjadi 233.011 ton/bulan untuk
alat muat dan 214.366 ton/bulan untuk alat angkut. Peningkatan efisiensi kerja alat
muat dan alat angkut didapatkan peningkatan produksi menjadi 159.850 ton/bulan
untuk alat muat dan 140.889 ton/bulan untuk alat angkut. Perbaikan jalan angkut
dan peningkatan efisiensi kerja alat muat dan angkut didapatkan peningkatan
produksi menjadi 237.917 ton/bulan untuk alat muat dan 221.398 ton/bulan untuk
alat angkut. Hasil ini menunjukkan target produksi tercapai.
PT. Lafarge Cement Indonesia is a company engaged in the production of
cement. PT. Lafarge Cement Indonesia has a limestone quarry mining business
license held by PT. Aroma Cipta Anugrahtama is located in the village of Mon
Ikeun, Lhoknga subdistrict, Aceh Besar district, Aceh Province.
Mining method applied is the open-pit mining methods. Limestone
mining activities carried out by PT . Macmahon Indonesia , which consists of the
dismantling process limestone with blasting method, loading and hauling
limestone from the quarry to the ROM or hopper. Unloading tools used are
Caterpillar 390D backhoe excavator 1 unit and conveyances used Caterpillar
773B dump truck is 3 units.
Limestone production target set by PT. Lafarge Cement Indonesia
amounted to 165.208 ton/month. The problem that occurs is not yet achieved the
production targets of the tool loading and transport equipment, where current
production is of 140.258 ton/month. Not achieving the production target due to
factors such as haul road is narrow, and the working time lost because of
constraints of work, both avoidable obstacles and constraints that can not be
avoided.
Efforts to achieve the production is done by widening the road transport,
and increase work efficiency. After efforts to improve on the haul roads obtained
an increase in production to 233.011 ton/month for the unloading tool and
214.366 ton/month for conveyance. Improved work efficiency tool loading and
transportation equipment obtained increased production be 159.850 ton/month for
the unloading tool and 140.889 ton/month for conveyance. Haul road repair and
improvement of work efficiency of loading and transport tools obtained an
increase in production to 237.917 ton/month for the unloading tool and
221.398 ton/month for conveyance. These results indicate the production target is
reached.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Darsini Darsini |
Date Deposited: | 13 May 2016 01:50 |
Last Modified: | 13 May 2016 01:50 |
URI: | http://eprints.upnyk.ac.id/id/eprint/813 |
Actions (login required)
![]() |
View Item |