ESTIMASI CADANGAN BATUBARA DENGAN METODE CROSS SECTION PADA BLOK A PT. MURUNG RAYA COAL KABUPATEN MURUNG RAYA KALIMANTAN TENGAH

PANGESTU, ANGGERA BONA (2016) ESTIMASI CADANGAN BATUBARA DENGAN METODE CROSS SECTION PADA BLOK A PT. MURUNG RAYA COAL KABUPATEN MURUNG RAYA KALIMANTAN TENGAH. Other thesis, UPN "VETERAN" YOGYAKARTA.

[thumbnail of ABSTRACT.pdf]
Preview
Text
ABSTRACT.pdf

Download (84kB) | Preview

Abstract

Pit Mining Plan Region is the 16.420 acres research area Mining Exploration
License Teritory area in PT.Murung Raya coal. The method used to estimate coal
reserve in the area of research is the Cross Section method Rule Of Gradual Change
and Rule Of Nearest Point. The principle method of Cross Section Rule Of Gradual
Change is by connecting the outermost points of observation. Numerically wise the
alteration deposition conditions along a straight line connecting Cosmos, two
samples point are thread the same. While for the method of Cross Section Rule of
Nearest Point, it is based on the closest point, by making the outer lineof deposits in a
linear, linear line length equal to the block boundary, half the distance between two
points.
Based on the estimation result which were performed using the method of
Cross Section Rule Of Gradual Change and Cross Section Rule Of Nearest Point
method to limit stripping ratio 10,47 : 1, ,the results obtained for the 5.400.797 MT
coal..
The results in both of the methods suggested that the estimated result are used
as the basis for the calculation of production. Expectantly in the futu re the mineable
reserves would not be in a smaller amounts than the estimated amount of coal
reserves

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Darsini Darsini
Date Deposited: 13 May 2016 01:40
Last Modified: 13 May 2016 01:40
URI: http://eprints.upnyk.ac.id/id/eprint/802

Actions (login required)

View Item View Item