RENCANA TEKNIS PENATAAN LAHAN UNTUK REVEGETASI DI LAHAN BEKAS PENAMBANGAN BATUGAMPING DAN TANAH LIAT PT. SAHABAT MULIA SAKTI KABUPATEN PATI JAWA TENGAH

ROMADHON, TIESAN TIMI (2013) RENCANA TEKNIS PENATAAN LAHAN UNTUK REVEGETASI DI LAHAN BEKAS PENAMBANGAN BATUGAMPING DAN TANAH LIAT PT. SAHABAT MULIA SAKTI KABUPATEN PATI JAWA TENGAH. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of RINGKASAN.pdf]
Preview
Text
RINGKASAN.pdf

Download (13kB) | Preview

Abstract

RINGKASAN
Daerah penelitian berada PT. Sahabat Mulia Sakti yang bergerak dalam
bidang pertambangan. Lokasi penelitian secara administratif terletak di
Kecamatan Tambakromo dan Kayen, Kabupaten Pati, Jawa Tengah. PT. Sahabat
Mulia Sakti menggunakan sistem tambang terbuka dengan metode kuari.
Selama proses penambangan sedang berlangsung maupun telah selesai
dilakukan, maka akan meninggalkan bekas penambangan batugamping dan tanah
liat. Oleh karena itu diperlukan suatu kegiatan reklamasi untuk menangani
masalah lingkungan akibat kegiatan penambangan. Sebelum dilakukan revegetasi
di area bekas penambangan tersebut, perlu dilakukan persiapan lahan untuk
revegetasi.
Tujuan dari penelitian ini adalah merencanakan cara penataan lahan bekas
area penambangan yang terdiri dari penimbunan, pengaturan tanah pucuk dan
penanaman agar kegiatan revegetasi dapat berjalan baik.
Luas keseluruhan blok penambangan 454,745Ha dengan volume tanah
pucuk yang terbongkar atau yang tersedia 1.406.947,13 LCM. Perataan lahan
menggunakan alat mekanis satu bulldozer caterpillar D8R dengan produksinya
947,03 LCM/hari. Waktu yang dibutuhkan untuk perataan lahan berbeda beda
tergantung dari reklamasi progresifnya. Metode perataan lahan dengan cara High
Wall atau Float Dozing pada lahan bagian jenjang dan untuk lahan dibagian pit
bottom menggunakan cara Trench atau slot dozing Bulldozer.
Total kebutuhan tanah pucuk untuk kegiatan revegetasi 268.102m
3
.
Pengangkutan tanah pucuk dari lokasi stock soil meggunakan kombinasi alat gali
muat dengan alat angkut. Alat yang digunakan 1 backhoe dengan kapasitas
produksi 789,1 LCM/hari. Jumlah kebutuhan dump truck antara 2-4 unit
tergantung dari waktu edar dan banyaknya tanah pucuk. Setelah material tanah
pucuk didatangkan dari lokasi penimbunan tanah pucuk, maka kegiatan
selanjutnya adalah pembuatan lubang tanam dengan sistem pot/lubang tanam pada
area jenjang dan sistem guludan pada area pit bottom.
Tingkat bahaya erosi pada bekas blok tambang batugamping dan tanah liat
termasuk golongan kuat sebelum dilakukan revegetasi, setelah dilakukan penataan
lahan dan revegetasi berubah menjadi sedang.
Kata Kunci : Penataan Lahan, Kebutuhan Tanah Pucuk, Pengendalian Erosi dan
Sedimentasi, Tingkat Bahaya Erosi.

ABSTRACT
The area of research is PT. Sahabat Mulia Sakti engaged in mining.
Administrative research sites located in District Tambakromo and Kayen, Pati
regency, Central of Java. PT Sahabat Mulia Sakti using open pit mining system
with quarry methode.
During the mining process is underway or has been completed, it will
leave the mined limestone and clay. Therefore we need a reclamation activities to
address environmental problems caused by mining activities. Prior to revegetation
in mine out areas, necessary preparation for revegetation of land.
The purpose of this study is to plan how the arrangement of the former
mining area consisting of stockpiling, topsoil and planting arrangement that can
work well revegetation activities.
Total area 454.745 hectares of mining blocks with top soil volume
available uncovered 1,406,947.13LCM. Land leveling using a mechanical device
with a bulldozer caterpillar D8R 947.03 LCM production per day. The time
needed for land leveling will vary depending on the progressive reclamation. Land
leveling method by High Wall or Float Dozing on level section of land and for the
land section use the pit bottom or slot dozing Bulldozer Trench.
Total requirement of top soil for revegetation activities are 268 102 m
3
.
The transportation of topsoil from soil stock location receipts combination
excavator fit with conveyance. Production backhoe capacity 789.1 LCM per day.
Number of dump truck needs between 2-4 units depending on the time and
number of top soil. Once imported topsoil material from the landfill topsoil, the
next activity is the manufacture of the planting hole with potting system / planting
hole in the area and system level mounds at the pit bottom area.
The erosion potential in the former limestone quarry blocks and clay,
including a strong group prior to revegetation, after landscaping and revegetation
become intermediate.
Keywords: Land Planning, Top soil of necessity, Erosion and Sedimentation
Controlling, Potential of erosions.

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Ratna Sufiatin
Date Deposited: 10 Oct 2016 03:13
Last Modified: 10 Oct 2016 03:13
URI: http://eprints.upnyk.ac.id/id/eprint/7469