RINGKASAN
PT. Adani Global adalah perusahaan pertambangan batubara yang terletak di
Pulau Bunyu Kecamatan Bunyu, Kabupaten Bulungan Provinsi Kalimantan
Timur, PT. Adani Global memiliki luas daerah penambangan sebesar, 2615 Ha
dengan target produksi overburden pada tahun 2012 sebesar 131.000 BCM/hari, dan
target produksi batubara sebesar 10.000 ton/hari. Penambangan dilakukan dengan
sistem blok dan membuat jenjang penambangan dengan tinggi 10 meter dan lebar 3
meter.
Permasalahan yang ada pada PT. Adani Global adalah tanah penutup di pit 4
belum adanya rancangan penimbunan tanah penutup sehingga tanah penutup ini
dikupas dan ditimbun di sekitar lokasi penambangan yang belum dilakukan
penambangan sehingga apabila daerah ini akan ditambang maka tanah penutup
tersebut harus dipindahkan lebih dulu. Cara penimbunan tanah penutup tersebut
tidak menggunakan metode tertentu dan tidak mempertimbangkan faktor
keamanan.
Metode yang digunakan untuk menghitung volume tanah penutup dan
rancangan timbunan tanah penutup adalah metode Penampang Tegak – Standar
dengan hasil perhitungan untuk volume tanah penutup yaitu sebesar 12.046.305
BCM = 16.985.290,05 LCM Material penyusun lereng timbunan diasumsikan
sebagai tanah homogen yang terdiri dari campuran bongkaran material penyusun
tanah penutup (overburden) dan interburden, sehingga untuk analisis kemantapan
rancangan lereng yang dilakukan menggunakan asumsi material pembentuk
lereng merupakan gabungan antara sandstone, siltstone, claystone dan
karbonasius dengan nilai bobot isi 18,17 kN/m3, kohesi 24,52 kN/m
2
dan sudut geser
dalam sebesar 27.19
o
Analysis rancangan timbunan tanah penutup dengan metode
kesetimbangan batas yaitu metode bishop dengan bantuan software slide v.5 by
rocksience sehingga geometri lereng rancangan timbunan tanah penutup yang
direkomendasikan maksimal terdiri dari 11 jenjang dengan tinggi tiap jenjang 5m,
lebar tiap jenjang 10m, sudut kemiringan lereng tunggal 20
o
dan sudut kemiringan
total 12
o
dengan FK sebesar 1,5 dengan volume timbunan sebesar 17.059.716 m3

ABSTRACT
PT. Adani Global is a coal mining company located in District Bunyu
Bunyu Island, Bulungan province of East Kalimantan, PT. Adani Global has 2615 ha
areas of mining, with a production target of overburdern 131.000 BCM /day by 2012,
and production target of coal 10.000 tonnes / day. Mining is done by the block
system and make the level with 10 meters in high and 3 meters in wide.
Problems that exist in PT. Adani Global is a ground cover in the absence of 4
pit design so that soil cover soil cover is peeled and stockpiled around the mine site
that has not been done so that the mining area will be mined if the ground
cover must be removed first. How to cover the landfill does not use a
particular method and not considering the safety factor.
The method used to calculate the volume of overburden and overburden
design is a method of crosssection with the calculation of the volume of soil to cover
the amount of 12.046.305 BCM = 16.985.290,05 LCM Embankment slopes
constituent materials are assumed to be homogeneous soil consisting of a mixture
of demolition material making up ground cover (overburden) and interburden,
so to design slope stability analyzes were performed using the assumption of
slope-forming material is a combination of sandstone, siltstone, claystone and
karbonasius with bulk density values 18,17 kN/m3, cohesion 24,52 kN/m
2
and
friction angle 27,19
o
Design analysis of overburden with limit equilibrium method is the
method of bishops with the help of software that slide v.5 by rocksience slope
geometry design recommended overburden consists of a maximum of 11 levels
with each level of 5m high, 10m wide each level, single slope 20
o
n overall slope 12
o
with FK at 1,5 with a capacity of 25.346.470 m3.

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Ratna Sufiatin
Date Deposited: 10 Oct 2016 02:28
Last Modified: 10 Oct 2016 02:28
URI: http://eprints.upnyk.ac.id/id/eprint/7456

Actions (login required)

View Item View Item