RANCANGAN SISTEM PENYALIRAN TAMBANG PADA ENDAPAN BATUBARA DI DAERAH PULAU LAUT, KOTABARU, PROVINSI KALIMANTAN SELATAN, PT. SEBUKU TANJUNG COAL

KUSUMANDARU, FIBRIANTA (2012) RANCANGAN SISTEM PENYALIRAN TAMBANG PADA ENDAPAN BATUBARA DI DAERAH PULAU LAUT, KOTABARU, PROVINSI KALIMANTAN SELATAN, PT. SEBUKU TANJUNG COAL. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
ABSTRAK.pdf

Download (51kB) | Preview

Abstract

PT. Sebuku Tanjung Coal yang daerah operasionalnya terletak di Kecamatan Pulau Laut Utara dan Pulau Laut Tengah, Kabupaten Kotabaru, Provinsi Kalimantan Selatan. Dengan curah hujan yang cukup tinggi, hal ini dapat menjadi masalah apabila dihubungkan dengan metode tambang terbuka. Sehingga dapat menimbulkan masalah penanganan air yang berasal dari air permukaan, baik air limpasan maupun air hujan. Berdasarkan hasil analisis data curah hujan dari tahun 1982 – 2010, ditentukan intensitas curah hujan rencana sebesar 36,05 mm/jam, sementara itu curah hujan rencana dari hasil analisis statistic diketahui 103,99 mm/hari. Dengan menggunakan periode ulang hujan selama 2 tahun dan resiko hidrologi sebesar 99,9 %. Untuk mengendalikan arah aliran air agar tidak mengganggu kegiatan penambangan pada daerah penambangan di setiap bukaan tambang dibuat dimensi saluran terbuka (paritan), dengan ukuran dimensi yang berbeda menuju sumuran (sump). Bentuk saluran yang direncanakan adalah trapesium. Dimensi saluran maksimum akan dirancang pada catchment area penambangan adalah : kedalaman saluran (h) 1,9 m, lebar dasar saluran (b) 1,9 m, lebar permukaan air (B) 3,8 m, luas penampang basah saluran (A) 4,8 m2, dan kemiringan dinding saluran 60o. sedangkan dimensi saluran maksimum yang akan dirancang pada bukaan tambang adalah : kedalaman saluran (h) 1,4 m, lebar dasar saluran (b) 1,4 m, lebar permukaan air (B) 2,7 m, luas penampang basah saluran (A) 2,4 m2, dan kemiringan dinding saluran 60o. Volume sump ditentukan dalam setiap kemajuan tambangnya. Terdapat 10 sumuran baru yang direncanakan pada bukaan tambang tahun 1 hingga bukaan tambang tahun 10. Kedalaman sump direncanakan 6 m sesuai dengan daya jangkauan alat dalam pembuatannya. Pompa yang diperlukan berbeda di setiap bukaan tambang, sesuai dengan kemajuan tambang. Pada bukaan tambang tahun 1 hingga bukaan tambang tahun 10 dibutuhkan maksimum 7 unit pompa. Rancangan kolam pengendapan yang dibuat berbeda-beda di setiap kemajuan bukaan tambang. Dimensi maksimum Kolam Pengendapan : luas kolam = 2052 m2, kedalaman kolam 5 m, lebar kolam 12m, panjang kolam 171 m, volume kolam 10260 m3. Pengerukan material padatan untuk setiap kolam pengendapan berbeda, dengan rata-rata tiap kolam pengendapan dilakukan setiap tiga hari sekali. ABSTRACT PT. Sebuku Tanjung Coal operations area is located in the District and the North Sea island of the Mediterranean island, Kotabaru Regency, South Kalimantan Province. With a fairly high rainfall, this can be a problem when connected to the open pit method. So that it can cause handling problems of water from surface water, well water and rainwater runoff. Based on the analysis of rainfall data from the years 1982 - 2010, the plan is determined by the intensity of rainfall 36.05 mm / h, while the rainfall was the plan from the results of statistical analysis known to 103.99 mm / day. By using a return period rainfall for 2 years and hydrological risk of 99.9%. To control the water flow direction so as not to disrupt mining activities in the area of mining in the mine openings created every dimension of an open channel (trenching), measuring a different dimension to the sinks (sump). The planned channel shape is trapezoidal. The maximum channel dimensions will be designed in catchment area of mining is : channel depth (h) 1.9 m, width of the channel bottom (b) 1.9 m, width of water surface (B) 3.8 m, wet channel cross-sectional area (A) 4.8 m2, and the slope of the channel wall 60o. while the maximum dimension of the channel will be designed at the mine openings are: the depth of the channel (h) 1.4 m, width of the channel bottom (b) 1.4 m, width of water surface (B) 2.7 m, cross-sectional area wet channel (A ) 2.4 m2, and the slope of the channel wall 60o. Sump volume is determined in every advancement mines. There were 10 new wells are planned on opening a mine in 10 years until the mine openings. Sump depth of 6 m is planned in accordance with its range of tools in the making. Pumps are required vary by mine openings, according to the progress of the mine. At the opening of the mine year 1 to year 10 mine openings required pump a maximum of 7 units. Sedimentation pond plans are different in each of the progress made mine openings. The maximum dimensions Pond Deposition: pond area = 2052 m2, pond depth of 5 m, width 12 m pond, 171 m long pond, pond volume 10 260 m3. Dredging material deposition of solids for each pond is different, with an average precipitation of each pond is done every three days.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eny Suparny
Date Deposited: 10 Aug 2016 02:34
Last Modified: 10 Aug 2016 02:34
URI: http://eprints.upnyk.ac.id/id/eprint/5028

Actions (login required)

View Item View Item