PARITAMA, DINAN (2015) PERANCANGAN ULANG GERAKAN KERJA UNTUK MENINGKATKAN PRODUKTIVITAS DENGAN METODE MEASUREMENT TIME METHOD (MTM-1) (Studi Kasus di Home Industry Druckersvend, Bantul, Yogyakarta). Other thesis, UPN ''VETERAN'' YOGYAKARTA.
Preview |
Text
Abstrak_122080074.pdf Download (142kB) | Preview |
Abstract
Measurement Time Method (MTM-1) adalah suatu sistem penetapan awal
waktu baku yang dilakukan secara tidak langsung dan dikembangkan berdasarkan
studi gambar gerakan-gerakan kerja dari suatu operasi kerja industri. Dengan
menerapkan metode ini nantinya akan dapat secara tidak langsung mengurangi
pemborosan gerakan kerja. Home industry Druckersvend merupakan salah satu
home industry yang bergerak dalam bidang pembuatan kemeja yang ada di kota
Yogyakarta. Permasalahan yang terjadi adalah home industry ini belum bisa
sepenuhnya memenuhi pesanan pelanggan yang semakin hari semakin bertambah.
Permasalahan tersebut dikarenakan home industry ini belum bisa menerapkan
gerakan kerja yang efektif bagi karyawan untuk menyelesaikan pekerjaannya yang
menyebabkan waktu penyelesaian pekerjaan yang tidak terkontrol.
Pengukuran waktu metoda yang dalam istilah asingnya lebih dikenal sebagai
Method Time Measurement membagi gerakan-gerakan kerja atas elemen-elemen
gerakan menjangkau (reach), mengangkut (move), memutar (turn), memegang
(grasp), mengarahkan (position), melepas (release), lepas rakit (dis-assemble),
gerakan mata (eye movement), dan beberapa gerakan anggota badan lainnya. Waktu
untuk setiap elemen gerak ini ditentukan menurut beberapa kondisi yang disebut
“kelas-kelas”. Kelas-kelas ini dapat menyangkut keadaan-keadaan perhentian,
keadaan obyek yang ditempuh atau dibawa, sulit mudahnya menangani obyek atau
kondisi-kondisi lainnya. Penelitian ini dilakukan dengan mengamati gerakan kerja
yang ada di Druckersvend dan mencatat waktu kerja sebelum dan sesudah
penerapan Measurement Time Method sehingga akan didapatkan waktu baku
sebelum dan sesudah penerapan Measurement Time Method.
Hasil pengolahan data Measurement Time Method sebelum dan sesudah
penerapan menunjukkan bahwa gerakan tangan yang dilakukan oleh seorang
operator pada bagian pemotongan, penjahitan, dan finishing sebelum dilakukannya
perbaikan gerakan masih terdapat gerakan yang kurang efisien dan penempatan
peralatan kerja yang belum tertata dengan baik. Hasil pengamatan diketahui waktu
proses pemotongan, penjahitan, dan finishing sebelum penerapan Measurement Time
Method adalah 844,598 detik dan waktu pemotongan, penjahitan, serta finishing
sesudah penerapan Measurement Time Method adalah 754,846 detik. Efisiensi yang
didapatkan dengan penerapan Measurement Time Method adalah sebesar 9%.
Kata kunci: Measurement Time Method, Perbaikan Gerakan Kerja.
Method Time Measurement (MTM-1) is a system of standard time initial
determination is done indirectly and developed based on image studies the
movements of the working of an industrial work operations. By applying this method
will be able to indirectly reduce the waste of labor movement. Druckersvend home
industry is one of the home industry engaged in the manufacture of shirts in the city
of Yogyakarta. The problem that occurs is home industry has not been able to fully
meet customer orders are increasingly growing. The problem of home industry
because it has not been able to implement effective labor movement for employees to
finish the work that led to the job completion time is not controlled.
Method Time Measurement in terms of foreign known as Method Time
Measurement divide the movements working on elements of movement reaches
(reach), transport (move), rotate (turn), hold (grasp), directing (position), remove
(release), off the raft (dis-assemble), eye movements (eye movement), and some other
limbs movement. The time for each element of this movement is determined according
to some condition called "classes". These classes can involve stops circumstances,
state of the object taken or carried, difficult easy to handle objects or other
conditions. This research was conducted by observing the movement of existing work
in Druckersvend and record the working time before and after application of Method
Time Measurement thus obtained raw time before and after application of Method
Time Measurement.
The data processing Method Time Measurement before and after the
application shows that the hand movements performed by an operator on the cutting,
sewing, and finishing prior to the movement improvement, there are still less efficient
movement and placement of equipment working not well ordered. It was observed
when the process of cutting, sewing, and finishing before the application of Method
Time Measurement is 844,598 seconds and time of cutting, sewing, and finishing
after application of Method Time Measurement is 754,846 seconds. The efficiency
obtained with the implementation of Method Time Measurement is equal to 9%.
Keywords: Time Measurement Method, Repair Work Movement.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Erny Azyanti |
Date Deposited: | 14 Jul 2016 04:30 |
Last Modified: | 14 Jul 2016 04:30 |
URI: | http://eprints.upnyk.ac.id/id/eprint/4749 |
Actions (login required)
![]() |
View Item |