STUDI RADIUS PENGARUH ANTAR BORE HOLE PUMP PADA TAMBANG BAWAH TANAH TOGURACI PT. NUSA HALMAHERA MINERALS, PROVINSI MALUKU UTARA

MULYANA, KRISNA (2016) STUDI RADIUS PENGARUH ANTAR BORE HOLE PUMP PADA TAMBANG BAWAH TANAH TOGURACI PT. NUSA HALMAHERA MINERALS, PROVINSI MALUKU UTARA. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
Ringkasan (Abstrak) Krisna Mulyana - 112110069 TA.pdf

Download (209kB) | Preview

Abstract

RINGKASAN PT. Nusa Halmahera Minerals atau yang dikenal dengan Gosowong Gold Mine merupakan perusahaan pertambangan yang bergerak di bidang penambangan dan juga pengolahan emas dan perak. Saat ini, sumber utama emas dan perak berasal dari dua lokasi penambangan, yaitu Toguraci dan Kencana yang ditambang dengan metode Long Hole Stoping dan Underhand Cut and Fill. Pada tambang Toguraci terdapat air tanah yang bersifat geothermal yang memiliki suhu antara 690 – 760C. Air tanah pada Toguraci telah dijumpai sejak penambangan dilakukan dengan metode open pit. Penanganan air tanah yang dilakukan pada Toguraci adalah dengan membuat bore hole pump. Hal ini dilakukan agar muka air tanah berada dibawah area kerja sehingga air tanah tidak membanjiri area kerja tambang. Dalam penentuan jarak untuk pemasangan bore hole pump perlu diketahui karakteristik akuifer dan nilai radius pengaruh pemompaan. Karakteristik akuifer didapat dari hasil uji pumping test, berupa transmisivitas dan koefisien penyimpanan. Sedangkan nilai radius pengaruh merupakan fungsi dari nilai transmisivitas, koefisien penyimpanan dan waktu pemompaan. Berdasarkan hasil uji pemompaan diketahui nilai Transmisivitas (T) pada ore body Damar adalah 1.095,065 m2/hari dan pada ore body Yahut adalah 1.629,568m2/hari. Sedangkan besarnya nilai Koefisien Penyimpanan (S) pada ore body Damar adalah 0,00200182 dan nilai Koefisien Penyimpanan pada ore body Yahut adalah 0,002854. Nilai rata – rata Permeabilitas (K) pada ore body Damar adalah 182,52 m/hari, sedangkan nilai Permeabilitas (K) pada ore body Yahut adalah 271,60 m/hari. Berdasarkan nilai Permeabilitasnya, diketahui bahwa permeabilitas batuan tinggi yang berarti produktifitas air tanah geothermal tinggi. Berdasarkan perhitungan didapat Radius pengaruh (Ro) pemompaan pada bore hole pump pada ore body Damar adalah 38,86 m, sedangkan pada ore body Yahut adalah 55,18 m. ABSTRACT PT. Nusa Halmahera Minerals as known as Gosowong Gold Mine is a mining company that work on mining and procesing of gold and silver. Nowadays, the main source of gold and silver came from two mining site, that is Toguraci and Kencana which mined by Long Hole Stoping and Underhand Cut and Fill methods. At the Toguraci underground mine found a groundwater that known as geothermal with temperature interval’s about 690 – 760C. Groundwater at the Toguraci has been found since mining work with open pit method. Groundwater at Toguraci has been handled by bore hole pumps. The aim of this bore hole pumps to lowering waterlevel and make water table exist under working area, so the groundwater didn’t flood mine working areas. For determination the distance of bore hole pump installation, we need to know chracteristic of aquifer and value radius of influence pumping. Characteristic of aquifer can be obtain by pumping test, that is transmissivity and storage coefficient. Meanwhile, the value of radius influence is a function of transmissivity, storage coefficient and pumping time. Based on pumping test results, known the value of Transmissivity (T) on ore body Damar is 1.095,065 m2/day and ore body Yahut is 1.629,568 m2/day. While value of Storage Coefficient (S) on ore body Damar is 0,00200182 and ore body Yahut is 0,002854. Average value of Permeability (K) on ore body Damar is 182,52m/day, while value of Permeability (K) on ore body Yahut is 271, 60 m/day. Based on Permeability values, known that rocks have high permeable its also means that productivity of groundwater is high. Based on calculation obtained Radius of influence (Ro) bore hole pump on ore body Damar is 38,86 m. while on ore body Yahut is 55,18 m

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Basir Umaryadi
Date Deposited: 10 May 2016 01:46
Last Modified: 10 May 2016 01:50
URI: http://eprints.upnyk.ac.id/id/eprint/459

Actions (login required)

View Item View Item