KAJIAN TEKNIS PRODUKSI ALAT MUAT DAN ANGKUT PADA KEGIATAN PENGUPASAN TANAH PENUTUP DI CENTRAL BUSANG BLOK 5D PT TANITO HARUM TENGGARONG, KALIMANTAN TIMUR

SOFYAN HERMAWAN, KHABIB (2016) KAJIAN TEKNIS PRODUKSI ALAT MUAT DAN ANGKUT PADA KEGIATAN PENGUPASAN TANAH PENUTUP DI CENTRAL BUSANG BLOK 5D PT TANITO HARUM TENGGARONG, KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of 2. ABSTRACT.pdf]
Preview
Text
2. ABSTRACT.pdf

Download (12kB) | Preview
[thumbnail of 3. JUDUL.pdf]
Preview
Text
3. JUDUL.pdf

Download (94kB) | Preview
[thumbnail of 4. LEMBAR PENGESAHAN.pdf]
Preview
Text
4. LEMBAR PENGESAHAN.pdf

Download (576kB) | Preview
[thumbnail of 5. DAFTAR ISI.pdf]
Preview
Text
5. DAFTAR ISI.pdf

Download (160kB) | Preview

Abstract

PT. Tanito Harum factory is located in the village Loa Tebu, District Tenggarong, Kutai
regency, East Kalimantan. Activities stripping to Central Busang block 5D performed by PT.RCI
(RPP Contractors Indonesia) with back filling. Overburden Stripping production target is
370,000 BCM / Month. Available working time is 20.3 hours / day using two shifts / day.
This research analyzing the ability of the tool loading and transportation in mining
activities in Central Busang Block 5D on 1 May to 29 June 2013. Mining activities using
mechanical devices such as excavator backhoe Komatsu PC2000 fit as many as 1 unit.
Conveyance dump truck Komatsu HD 785-7 4 units.
Distance PT.Tanito Harum to the mine site is ± 10km. Loading pattern used top loading
and a single truck backing up. Overburden current production capability is 361 779 BCM to
work efficiency 77.71% and has not met the target. This is because the barriers, so we need to
increase production. The production target of 370,000 BCM / Month. In this case there is still a
shortfall in production by 8221 BCM. Efforts to increase the production is done by reducing
barriers to obtain a better work efficiency. After reducing barriers to employment, the effective
working time of the original is 77.71% to 81.69% and the production capacity of 362.779 BCM
into 371.661 BCM, so the production met the target.

Item Type: Thesis (Other)
Subjek: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 22 Jun 2016 03:21
Last Modified: 22 Jun 2016 03:21
URI: http://eprints.upnyk.ac.id/id/eprint/4190

Actions (login required)

View Item View Item