ANALISIS MANAJEMEN RISIKO MENGGUNAKAN METODE HAZARD IDENTIFICATION RISK ASSESMENT PADA LOADING OVERBURDEN DAN BATUBARA AREA TAMBANG BANKO BARAT PIT 3 TIMUR DI PT. BUKIT ASAM Tbk KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN

APRILIANO, BAGAS (2024) ANALISIS MANAJEMEN RISIKO MENGGUNAKAN METODE HAZARD IDENTIFICATION RISK ASSESMENT PADA LOADING OVERBURDEN DAN BATUBARA AREA TAMBANG BANKO BARAT PIT 3 TIMUR DI PT. BUKIT ASAM Tbk KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN. Other thesis, UPN Veteran Yogyakarta.

[thumbnail of 1. COVER SKRIPSI.pdf] Text
1. COVER SKRIPSI.pdf

Download (117kB)
[thumbnail of 2. LEMBAR PENGESAHAN.pdf] Text
2. LEMBAR PENGESAHAN.pdf

Download (56kB)
[thumbnail of 3. ABSTRAK.pdf] Text
3. ABSTRAK.pdf

Download (56kB)
[thumbnail of 4. DAFTAR ISI.pdf] Text
4. DAFTAR ISI.pdf

Download (64kB)
[thumbnail of 5. DAFTAR PUSTAKA.pdf] Text
5. DAFTAR PUSTAKA.pdf

Download (173kB)
[thumbnail of 6. DRAFT SKRIPSI.pdf] Text
6. DRAFT SKRIPSI.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

V
RINGKASAN
PT. Bukit Asam Tbk berlokasi di Kabupaten Muara Enim Provinsi
Sumatera Selatan. Perusahaan ini bergerak pada usaha jasa pertambangan
Batubara menggunakan sistem tambang terbuka. Kegiatan yang dilakukan
adalah tahapan pembongkaran, pemuatan, dan pengangkutan. Untuk
menghindari dan mengurangi risiko yang dapat terjadi maka diperlukan
manajemen risiko yaitu dengan identifikasi bahaya (hazard identification),
dan penilaian risiko (risk assessment) atau HIRA. Pengamatan identifikasi
bahaya pada penelitian ini dilakukan pada kegiatan penambangan dari hasil
risiko tersebut ditentukan pengendalian risiko untuk mengurangi dan
menghilangkan potensi tersebut.
Pengamatan identifikasi bahaya pada penelitian ini dilakukan di
kegiatan loading overburden dan batubara untuk selanjutnya diketahui hasil
penilaian risiko serta pengendalian yang dapat digunakan. Dari hasil
penelitian tersebut pada kegiatan loading overburden didapatkan 7 risiko
kecelakaan berdasarkan hasil HIRA memiliki 2 kriteria extreme, memiliki 4
kriteria high dan memiliki 1 kriteria moderate. Selanjutnya dari risiko
kecelakaan yang ada dilakukan pengendalian eliminasi, pengendalian
administrasi dan pemakaian alat pelindung diri, sehingga menurunkan nilai
kemungkinan terjadi dan nilai keparahan cidera yang diterima sehingga 7
risiko kecelakaan menjadi kriteria low.
Selanjutnya pada kegiatan loading batubara didapatkan 3 risiko
kecelakaanberdasarkan hasil HIRA memiliki 2 kriteria extreme, memiliki 1
kriteria high dan 1 kriteria moderate. Dari risiko kecelakaan yang ada
dilakukan pengendalian eliminasi, rekayasa engineering, pengendalian
administrasi dan pemakaian alat pelindung diri sehingga menurunkan nilai
kemungkinan terjadi dan nilai keparahan cidera yang diterima sehingga 4
risiko kecelakaan menjadi kriteria low.
Dari hasil penelitian yang dilakukan, diperlukan adanya evaluasi
program keselamatan dan kesehatan kerja lebih detil seperti pelaksanaan
pengecekan peralatan harian (P2H) agar pekerja dapat melaksanakan kerja
secara sesuai dan dengan benar, serta dapat meminimalisir akan terjadinya
kecelakan kerja dan sakitakibat kerja
VI
SUMMARY
PT. Bukit Asam Tbk is located in Muara Enim District, South Sumatra
province. This company is engaged in the coal mining service business using an
open-pit mining system. The activities carried out the stages of unloading, loading,
and transporting.
To avoid and reduce some of the risks that may occur, some risk
management is needed by using Hazard Identification and Risk Assessment (HIRA).
The observations about hazard identification in this study were conducted in mining
activities and the results of these risks would be used to decide the risk control to
reduce and eliminate these hazard potentials.
Observations of hazard identification in this study were carried out at
Loading Overburden and Coal activities and the results would determine risk
assessment and controls that may be used.
The result of this study in loading overburden activities was obtained 7 risks
of accidents, based on HIRA there are 2 extreme criteria, 4 high criteria and 1
moderate criteria. Furthermore, in the coal loading activities, this study discovered
4 risks of accidents, based on HIRA, the result contains 2 extreme criteria, 1 high
criteria and 1 moderate criteria. From the existing accident risks, elimination
control, administrative control, and utility of personal protective equipment were
conducted so that all of the accident risks turn into low criteria.
The result of this study in loading overburden activities was obtained 7 risks
of accidents, based on HIRA there are 2 extreme criteria, 4 high criteria and 1
moderate criteria. Furthermore, in the coal loading activities, this study discovered
4 risks of accidents, based on HIRA, the result contains 2 extreme criteria, 1 high
criteria and 1 moderate criteria. From the existing accident risks, elimination
control, administrative control, and utility of personal protective equipment were
conducted so that all of the accident risks turn into low criteria.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 26 Jun 2024 03:50
Last Modified: 26 Jun 2024 03:50
URI: http://eprints.upnyk.ac.id/id/eprint/39958

Actions (login required)

View Item View Item