EVALUASI POTENSI GAS SUMUR XQ-2 PADA LAPANGAN AY DALAM STRATEGI PENYALURAN GAS SECARA KOMERSIAL UNTUK INDUSTRI HILIR

KAMAL, DICKY AGUNG PRAMONO (2024) EVALUASI POTENSI GAS SUMUR XQ-2 PADA LAPANGAN AY DALAM STRATEGI PENYALURAN GAS SECARA KOMERSIAL UNTUK INDUSTRI HILIR. Masters thesis, UPN Veteran Yogyajarta.

[thumbnail of Cover Dicky AP.pdf] Text
Cover Dicky AP.pdf

Download (90kB)
[thumbnail of Daftar Isi Dicky AP.pdf] Text
Daftar Isi Dicky AP.pdf

Download (150kB)
[thumbnail of Daftar Pustaka Dicky AP.pdf] Text
Daftar Pustaka Dicky AP.pdf

Download (210kB)
[thumbnail of Final Draft_Tesis_Dicky_Agung_Pramono_Kamal_213202007_Rev_After_Sidang[1].pdf] Text
Final Draft_Tesis_Dicky_Agung_Pramono_Kamal_213202007_Rev_After_Sidang[1].pdf
Restricted to Repository staff only

Download (8MB)
[thumbnail of Hal pengesahan Dicky AP.pdf] Text
Hal pengesahan Dicky AP.pdf

Download (190kB)
[thumbnail of Ringkasan Dicky AP.pdf] Text
Ringkasan Dicky AP.pdf

Download (32kB)

Abstract

iv
RINGKASAN
Pemboran eksplorasi pada lapangan AY di area Seram Non-Bula merupakan
usaha Perusahaan dalam mencari potensi gas. Formasi target dari kegiatan pemboran
eksplorasi ini merupakan Formasi Manusela yang merupakan bagian dari Cekungan
Seram. Pemboran eksplorasi dilakukan untuk 2 (dua) sumur, yaitu: Sumur XQ-1/1ST
(2012) dan XQ-2 (2014). Kedua sumur tersebut kondisi sekarang adalah temporary
plugged & abandoned. Perusahaan melakukan re-entry dan re-testing sumur XQ-2 pada
tahun 2022 yang menembus zona gas dengan total Cadangan gas mula-mula sebesar
109.7 BSCF. Perusahaan akan menghitung keekonomian sumur XQ-2 ini agar dapat
dilakukan penyaluran gas secara komersial untuk industri hilir. Potensi gas dan strategi
penyaluran gas secara komersial sumur XQ-2 ini akan diketahui dari perhitungan
Cadangan gas dan skenario Perusahaan dengan pembeli akhir. Skenario ini juga
tergantung dari harga yang dipakai di perhitungan keekonomian.
Evaluasi potensi gas Sumur XQ-2 dilakukan berdasarkan dengan menganalisa
data sumuran yang sudah ada. Mengetahui cadangan gas pada formasi Manusela dengan
melakukan perhitungan dengan metode volumetrik, simulasi reservoir menggunakan
simulator IPM (MBAL dan Prosper), melakukan penentuan skenario penyaluran gas
terbaik dalam penyaluran gas secara komersial dengan memperhitungkan nilai
keekonomian proyek berdasarkan jenis production sharing contract (PSC) gross split.
Hasil evaluasi potensi sumur XQ-2 lapangan AY diperoleh rate gas sebesar 10
MMSCFD dengan lama waktu produksi menyesuaikan dengan kontrak Perusahaan
sampai dengan tahun 2039. Skenario 2 yang dipilih karena menunjukan hasil yang
positif dan waktu pengembalian modal yang relatif cepat dibandingkan dengan skenario
1 dan 3. Hasil nilai keekonomian yang didapatkan pada skenario 2 adalah dengan
menggunakan PSC Gross Split mendapatkan hasil dengan total biaya investasi sebesar
US$ 32,693M, NPV US$ 59805M, IRR sebesar 18.4% dan POT 6.14 tahun.
Kata Kunci: Cadangan Gas, Industri Hilir, Keekonomian, Potensi Gas, PSC Gross Split,
Simulasi Reservoir
v
ABSTRACT
Exploration drilling in the AY field in the Seram Non-Bula area is the company's
effort to find potential gas reserves. The target formation for this exploration drilling is
the Manusela Formation, which is part of the Seram Basin. The exploration drilling is
conducted for two wells: Well XQ-1/1ST (2012) and XQ-2 (2014). Both wells are
currently in a temporary plugged and abandoned condition (due to operational issues
and the company's contractual limits). In 2022, the company conducted a re-entry and
re-testing of well XQ-2, penetrating the gas zone with a total initial gas reserve of 109.7
BSCF. The company will calculate the economics of well XQ-2 to enable the
commercial distribution of gas to downstream industries. The potential gas and the
strategy for commercial gas distribution from well XQ-2 will be determined through
reserve calculations and the company's scenarios with end buyers. These scenarios also
depend on the prices used in the economic calculations.
The evaluation of the gas potential of Well XQ-2 is based on analyzing existing
well data. Determining the gas reserves in the Manusela Formation involves volumetric
calculations, reservoir simulation using the IPM simulator (MBAL and Prosper), and
selecting the best gas distribution scenario commercially, considering the economic
value of the project based on the type of Production Sharing Contract (PSC) gross split.
The evaluation results for Well XQ-2 in AY field indicate a gas rate of 10
MMSCFD with a production timeline aligned with the company's contract until 2039.
Scenario 2 is chosen because it shows positive results and a relatively fast return on
investment compared to scenarios 1 and 3. The economic values obtained in Scenario
2, using the PSC Gross Split, include a total investment cost of US$ 32,693M, NPV of
US$ 59,805M, an IRR of 18.4%, and a POT of 6.14 years.
Keywords: Downstream Industries, Economics, Gas Potential, Gas Reserves, PSC
Gross Split, Reservoir Simulation

Item Type: Thesis (Masters)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 22 Feb 2024 01:46
Last Modified: 22 Feb 2024 01:47
URI: http://eprints.upnyk.ac.id/id/eprint/38936

Actions (login required)

View Item View Item