DUMAIS, ERICKA INDAH (2023) OPTIMASI ELECTRIC SUBMERSIBLE PUMP (ESP) GUNA MENINGKATKAN LAJU PRODUKSI PADA SUMUR “ED-09” & “ED-11” LAPANGAN “DUMUM”. Other thesis, UPN "Veteran" Yogyajarta.
Text
Abstrak_113190030_Ericka Indah Dumais.pdf Download (106kB) |
|
Text
Cover_113190030_Ericka Indah Dumais.pdf Download (120kB) |
|
Text
Daftar Isi_113190030_Ericka Indah Dumais.pdf Download (105kB) |
|
Text
Daftar Pustaka_113190030_Ericka Indah Dumais.pdf Download (135kB) |
|
Text
Lembar Pengesahan_113190030_Ericka Indah Dumais.pdf Download (82kB) |
|
Text
Skripsi Full Text_113190030_Ericka Indah Dumais.pdf Restricted to Repository staff only Download (5MB) |
Abstract
vii
RINGKASAN
OPTIMASI ELECTRIC SUBMERSIBLE PUMP (ESP) GUNA
MENINGKATKAN LAJU PRODUKSI PADA SUMUR “ED-09”
& “ED-11” LAPANGAN “DUMUM”
Oleh
Ericka Indah Dumais
NIM: 113190030
(Program Studi Sarjana Teknik Perminyakan)
Sumur “ED-09” dan “ED-11” terletak di Lapangan “DUMUM” PT.
Pertamina EP Cepu saat ini sudah tidak mampu memproduksikan fluida secara
natural flow atau pengangkatan secara alami, sehingga semur tersebut
diproduksikan dengan metode artificial lift atau pengangkatan buatan dengan
menggunakan pengangkatan buatan Electrical Submersible Pump (ESP).
Berdasarkan data sejarah produksi sumur ini memiliki trend produksi yang naik
turun (fluktuatif). Sumur “ED-09” dan sumur “ED-11” belum pernah dilakukan
evaluasi sebelumnya. Masalah tersebut memerlukan adanya evaluasi dan optimasi
sehingga dapat meningkatkan laju produksi sumur kajian.
Penelitian ini, dimulai dengan melakukan pengumpulan data produksi, data
reservoir, data komplesi, data ESP terpasang dan data penunjang lainnya.
Selanjutnya, melakukan evaluasi pada pompa ESP terpasang dengan menghitung
produktivitas formasi menggunakan Metode Pudjo Sukarno dan melakukan analisa
nodal Vertical Lift Performance menggunakan Metode Gilbert. Tahap selanjutnya,
melakukan evaluasi formation completion sumur dengan menghitung pressure drop
akibat dari perforasi dengan persamaan Jones, Blount & Glaze. Jika, pompa yang
terpasang tidak optimum maka perlu dilakukan perencanaan ulang pada pompa.
Hasil perhitungan perencanaan ulang Electric Submersible Pump pada
sumur “ED-11”, memperoleh produksi minyak sebesar 60 BOPD. Tipe pompa yang
digunakan adalah DN1100/60 Hz/ 172 Stages/ TDH 2496 ft, Pump Setting Depth
(PSD) yang terpasang pada kedalaman, yaitu 2680 ft dan efisien pompa
meningkatkan menjadi 85%. Sedangkan untuk sumur “ED-09” tidak dilakukan
optimasi dikarenakan pompa yang terpasang sudah mencapai nilai effisiensi
optimum.
Kata Kunci: Electric Submersible Pump, PSD, TDH
viii
ABSTRACT
OPTIMIZATION OF ELECTRIC SUBMERSIBLE PUMP (ESP)
TO INCREASE PRODUCTION RATE AT WELLS "ED-09" &
"ED-11" "DUMUM" FIELD
By
Ericka Indah Dumais
NIM: 113190030
(Petroleum Engineering Undergraduated Program)
The "ED-09" and "ED-11" wells located in the "DUMUM" field of PT
Pertamina EP Cepu are currently unable to produce fluid by natural flow or natural
lifting, so that the well is produced by artificial lift method using the Electrical
Submersible Pump (ESP) artificial lift. Based on historical production data, this
well has a fluctuating production trend. Well "ED-09" and well "ED-11" have never
been evaluated before. The problem requires evaluation and optimization so as to
increase the production rate of the study wells.
This research begins by collecting production data, reservoir data,
completions data, installed ESP data and other supporting data. Next, evaluate the
installed ESP pump by calculating formation productivity using the Pudjo Sukarno
Method and analyzing nodal Vertical Lift Performance using the Gilbert Method.
The next step is to evaluate the formation completion of the well by calculating the
pressure drop due to perforation using the Jones, Blount & Glaze equation. If, the
installed pump is not optimum then it is necessary to re-plan the pump.
The results of the Electric Submersible Pump re-planning calculation at the
"ED-11" well, obtained oil production of 60 BOPD. The type of pump used is
DN1100/60 Hz/ 172 Stages/ TDH 2496 ft, Pump Setting Depth (PSD) installed at a
depth of 2680 ft and pump efficiency increased to 85%. As for well "ED-09", no
optimization was carried out because the installed pump has reached the optimum
efficiency.
Keywords: Electric Submersible Pump, PSD, TDH
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Electric Submersible Pump, PSD, TDH |
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Yuli |
Date Deposited: | 12 Sep 2023 06:58 |
Last Modified: | 12 Sep 2023 06:58 |
URI: | http://eprints.upnyk.ac.id/id/eprint/37464 |
Actions (login required)
View Item |