RANCANGAN SISTEM PENYALIRAN TAMBANG PADA PENAMBANGAN BATUBARA DI PIT Z12 BELUMPUR PT. MULTI HARAPAN UTAMA KUTAI KARTANEGARA, KALIMANTAN TIMUR

WARDHANI, IKHA CITRA (2023) RANCANGAN SISTEM PENYALIRAN TAMBANG PADA PENAMBANGAN BATUBARA DI PIT Z12 BELUMPUR PT. MULTI HARAPAN UTAMA KUTAI KARTANEGARA, KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyajarta.

[thumbnail of ABSTRAK.pdf] Text
ABSTRAK.pdf

Download (209kB)
[thumbnail of COVER SKRIPSI.pdf] Text
COVER SKRIPSI.pdf

Download (137kB)
[thumbnail of DAFTAR ISI.pdf] Text
DAFTAR ISI.pdf

Download (137kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (186kB)
[thumbnail of LEMBAR PENGESAHAN.pdf] Text
LEMBAR PENGESAHAN.pdf

Download (342kB)
[thumbnail of SKRIPSI FULL.pdf] Text
SKRIPSI FULL.pdf
Restricted to Repository staff only

Download (6MB)

Abstract

v
RINGKASAN
PT. MHU terletak di Kabupaten Kutai Kartanegara dan Kota Samarinda,
Provinsi Kalimantan Timur. Sistem penambangan batubara di PT. MHU adalah
sistem tambang terbuka dengan metode open pit, sehingga seluruh rangkaian kerja
penambangan dipengaruhi oleh air terutama air hujan dalam jumlah berlebih. Oleh
karena itu, diperlukan rancangan sistem penyaliran tambang yang baik.
Berdasarkan analisis kondisi hidrologi di lokasi penelitian dengan
menggunakan data curah hujan selama 10 tahun (2013-2022), diperoleh curah hujan
rencana sebesar 131,92 mm/hari, intensitas curah hujan sebesar 26,90 mm/jam
dengan periode ulang hujan 3 tahun dan resiko hidrologi sebesar 86,83 %. Terdapat
tiga daerah tangkapan hujan di lokasi penelitian, yaitu DTH I seluas 0,54 km2
dengan debit air limpasan sebesar 3,65 m3/detik, DTH II seluas 0,21 km2 dengan
debit air limpasan sebesar 0,93 m3/detik, DTH III seluas 0,27 km2 dengan debit air
limpasan sebesar 1,21 m3/detik.
Rancangan sistem penyaliran tambang meliputi, saluran terbuka dan
gorong-gorong, ceruk, kebutuhan pompa dan pipa, dan waktu pemeliharaan kolam
pengendapan. Dimensi saluran terbuka 1 adalah kemiringan dinding saluran
() = 60°, lebar dasar saluran (b) = 0,98 m, lebar permukaan (B) = 1,95 m,
kedalaman saluran (d) = 1,01 m, kedalaman air (h) = 0,85 m, dan panjang sisi luar
saluran (a) = 1,17 m. Dimensi saluran terbuka 2 adalah kemiringan dinding saluran
() = 60°, lebar dasar saluran (b) = 1,33 m, lebar permukaan (B) = 2,67 m,
kedalaman saluran (d) = 1,39 m, kedalaman air (h) = 1,15 m, dan panjang sisi luar
saluran (a) =1,60 m. Terdapat 1 gorong-gorong yang dibutuhkan untuk mengalirkan
air dari saluran terbuka yang memotong jalan angkut dengan diameter 0,83 m.
Pembuatan ceruk berada pada elevasi terendah dari bukaan tambang dengan
volume 21.092 m3. Pompa yang direkomendasikan adalah pompa Multiflo 420
dengan head total pada 71,27 m dan debit kapasitas pompa sebesar 982,9 m3/jam.
Pipa yang digunakan adalah jenis HDPE (High Density Polyethylene) dengan
diameter 12 inch dan panjang 720 m. Kolam pengendapan terdiri dari 7
kompartemen dengan luas 4.320 m2 dan volume pengendapan 17.280 m3. Waktu
pemeliharaan pada kolam pengendapan berupa pengerukan untuk kompartemen 1
selama 30 hari sekali, kompartemen 2 selama 48 hari sekali, kompartemen 3 selama
65 hari sekali, kompartemen 4 selama 83 hari sekali, kompartemen 5 selama
119 hari sekali, kompartemen 6 selama 180 hari sekali, kompartemen 7 selama 205
hari sekali.
vi
SUMMARY
PT. MHU is located in Kutai Kartanegara Regency and Samarinda City,
East Kalimantan Province. Coal mining system at PT. MHU is an open pit mining
system with the open pit method, so that the entire mining work series is affected by
water, especially rainwater in excess amounts. Therefore, it is necessary to design
a good mine drainage system.
Based on an analysis of the hydrological conditions at the study site using
rainfall data for 10 years (2013-2022), a planned rainfall of 131.92 mm/day was
obtained, a rainfall intensity of 26.90 mm/hour with a return period of 3 years and
hydrological risk of 86.83%. There are three rain catchment areas at the study site,
namely DTH I covering an area of 0.54 km2 with runoff water discharge of
3.65 m3/sec, DTH II covering an area of 0.21 km2 with runoff water discharge of
0.93 m3/sec, DTH III covering an area of 0.27 km2 with runoff water discharge of
1.21 m3/sec.
The design of the mine drainage system includes open channels and
culverts, recesses, the need for pumps and pipes, and maintenance time for settling
ponds. The open channel dimension 1 is the slope of the channel wall () = 60°,
channel bottom width (b) = 0.98 m, surface width (B) = 1.95 m, channel depth (d)
= 1.01 m, water depth (h) = 0.85 m, and the outer side of the canal (a) = 1.17 m.
The dimensions of the open channel 2 are the slope of the channel wall () = 60°,
the width of the channel bottom (b) = 1.33 m, the surface width (B) = 2.67 m, the
depth of the channel (d) = 1.39 m, the depth water (h) = 1.15 m, and the outer side
of the canal (a) = 1.60 m. There is 1 culvert required to convey water from an open
canal that intersects the haul road with a diameter of 0.83 m.
The niche is made at the lowest elevation of the mine opening with a volume
of 21,092 m3. The recommended pump is the Multiflo 420 pump with a total head
of 71.27 m and a pump capacity of 982.9 m3/hour. The pipe used is HDPE (High
Density Polyethylene) with a diameter of 12 inches and a length of 720 m. The
settling pond consists of 7 compartments with an area of 4,320 m2 and a settling
volume of 17,280 m3. The maintenance time for settling ponds is dredging for
compartment 1 once every 30 days, compartment 2 for once every 48 days,
compartment 3 for once every 65 days, compartment 4 for once every 83 days,
compartment 5 for once 119 days, compartment 6 for once every 180 days,
compartment 7 every 205 days.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 28 Aug 2023 03:08
Last Modified: 28 Aug 2023 03:08
URI: http://eprints.upnyk.ac.id/id/eprint/37188

Actions (login required)

View Item View Item