SIMULASI RESERVOIR SUMUR GAS “MR-02” LAPANGAN MR LAPISAN LTAF DENGAN MENGGUNAKAN DATA DAN ANALISA DST

RAHMA, MIFTAHUR (2023) SIMULASI RESERVOIR SUMUR GAS “MR-02” LAPANGAN MR LAPISAN LTAF DENGAN MENGGUNAKAN DATA DAN ANALISA DST. Other thesis, UPN "Veteran" Yogyajarta.

[thumbnail of Daftar Pustaka_113190022_Miftahur Rahma.pdf] Text
Daftar Pustaka_113190022_Miftahur Rahma.pdf

Download (119kB)
[thumbnail of Abstrak_113190022_Miftahur Rahma.pdf] Text
Abstrak_113190022_Miftahur Rahma.pdf

Download (130kB)
[thumbnail of Daftar Isi_113190022_Miftahur Rahma.pdf] Text
Daftar Isi_113190022_Miftahur Rahma.pdf

Download (115kB)
[thumbnail of Lembar Pengesahan_113190022_Miftahur Rahma.pdf] Text
Lembar Pengesahan_113190022_Miftahur Rahma.pdf

Download (175kB)
[thumbnail of Skripsi Full Text_113190022_Miftahur Rahma.pdf] Text
Skripsi Full Text_113190022_Miftahur Rahma.pdf
Restricted to Repository staff only

Download (2MB)
[thumbnail of Cover_113190022_Miftahur Rahma.pdf] Text
Cover_113190022_Miftahur Rahma.pdf

Download (71kB)

Abstract

vi
RINGKASAN
SIMULASI RESERVOIR SUMUR GAS “MR-02”
LAPANGAN MR LAPISAN LTAF DENGAN
MENGGUNAKAN DATA DAN ANALISA DST
Oleh
Miftahur Rahma
NIM: 113190022
(Program Studi Sarjana Teknik Perminyakan)
Lapangan “MR” adalah lapangan yang sedang di eksplorasi dan memiliki 3 sumur
yang tersedia salah satunya adalah sumur “MR-02”. Sumur Gas “MR-02” ini
belum berproduksi sehingga tidak ada data produksi dari Lapangan MR. Lapangan
“MR” ini telah dilakukan drill steam test dari DST#1 (Lapisan Weater Granit) dan
DST#2 (Lapisan LTAF), dimana agar dapat mengetahui kandungan gas yang ada
pada Sumur Gas “MR-02”. Tujuan dari simulasi ini adalah untuk memahami
perilaku aliran fluida di dalam lapisan tersebut dan menentukan waktu plateau
(waktu di mana produksi gas menjadi konstan) untuk periode yang signifikan. Pada
penelitian ini dilakukan simulasi pada Lapisan LTAF DST#2.
Pada Sumur Gas “MR-02” dilakukan simulasi reservoir menggunakan data dan
analisa DST dengan simulator CMG dengan single well model, lalu didapatkan
hasil inisialisasi data pada proses simulasi, didapatkan OGIP sebesar 5.49 BSCF.
Mengingat Sumur Gas “MR-02” ini belum berproduksi, maka proses history
matching dilakukan dengan menggunakan data DST. Skenario produksi pada
penilitian ini dilakukan dengan 3 skenario.
Pada hasil skenario 1 dilakukan dengan running menggunakan laju alir 1.01
MMSCFD didapatkan waktu plateu selama 8 tahun 1 bulan, pada laju alir 1.05
MMSCFD didapatkan waktu plateu selama 5 tahun 3 bulan dan laju alir 2.00
MMSCFD didapatkan waktu plateu 3 tahun 9 bulan. Sedangkan pada skenario 2
dilakukan dengan laju alir 2.50 MMSCFD didapatkan waktu plateu selama 2 tahun
11 bulan, pada laju alir 3.00 MMSCFD didapatkan waktu plateu selama 1 tahun 5
bulan, dan pada laju alir 3.50 MMSCFD didapatkan waktu plateu selama 1 tahun
12 bulan. Dan pada skenario 3 dilakukan dengan laju alir 3.90 MMSCFD
didapatkan waktu plateu selama 1 tahun 9 bulan dan pada laju alir 4.42 MMSCFD
didapatkan waktu plateu selama 1 tahun 6 bulan.
Kata kunci: Simulasi Reservoir, Single Well Model, Sumur Gas
vii
ABSTRACT
RESERVOIR SIMULATION OF GAS WELL "MR-02"
OF MR FIELD LTAF LAYER BY USING DATA AND
ANALYSIS DST
By
Miftahur Rahma
NIM: 113190022
(Petroleum Engineering Undergraduated Program)
The "MR" field is an exploratory field and has 3 wells available, one of which is
the "MR-02" well. The "MR-02" gas well is not yet in production so there is no
production data from the MR field. The "MR" field has drilled steam tests from
DST#1 (Granite Weater Layer) and DST#2 (LTAF Layer), in order to determine
the gas content in the "MR-02" Gas Well. The purpose of this simulation is to
understand the fluid flow behavior within these layers and determine the plateau
time (the time at which gas production becomes constant) for a significant period.
In this study, the simulation was carried out on the LTAF DST#2 layer.
In the Gas Well "MR-02", reservoir simulation was carried out using DST data and
analysis with the CMG simulator with a single well model, then the results of data
initialization in the simulation process obtained an OGIP of 5.49 BSCF.
Considering that the Gas Well "MR-02" is not yet in production, the history
matching process is carried out using DST data. The production scenario in this
research is carried out with 3 scenarios.
In the results of scenario 1 carried out by running using a flow rate of 1.01
MMSCFD, the plateau time is obtained for 8 years and 1 month, at a flow rate of
1.05 MMSCFD, the plateau time is obtained for 5 years and 3 months and a flow
rate of 2.00 MMSCFD is obtained for 3 years and 9 months. While in scenario 2
carried out with a flow rate of 2.50 MMSCFD, the plateau time is obtained for 2
years and 11 months, at a flow rate of 3.00 MMSCFD, the plateau time is obtained
for 1 year and 5 months, and at a flow rate of 3.50 MMSCFD, the plateau time is
obtained for 1 year and 12 months. And in scenario 3 carried out with a flow rate
of 3.90 MMSCFD, the plateau time is obtained for 1 year and 9 months and at a
flow rate of 4.42 MMSCFD, the plateau time is obtained for 1 year and 6 months.
Keywords: Simulation Reservoir, Single Well Model, Gas Well

Item Type: Thesis (Other)
Uncontrolled Keywords: Simulation Reservoir, Single Well Model, Gas Well
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 02 Aug 2023 07:27
Last Modified: 02 Aug 2023 07:27
URI: http://eprints.upnyk.ac.id/id/eprint/36723

Actions (login required)

View Item View Item