Utama Arsy, Budi (2014) Evaluasi Perancangan Dimensi Settlingpond Pada Quarry Karang Putih PT. Semen Padang, Desa Batu Gadang, Kenagarian Indarung, Kecamatan Lubuk Kilangan, Sumatera Barat. Other thesis, UPN ''VETERAN'' YOGYAKARTA.
|
Text
abtrak.pdf Download (113kB) | Preview |
|
|
Text
Cover + halaman persetujuan kolokium.pdf Download (270kB) | Preview |
Abstract
Aliran permukaan yang terbentuk akibat hujan membawa material-material yang berukuran halus, kecil dan sedang disetiap liku-liku bumi yang dilaluinya. Pada akhirnya material tersebut mengendap pada cekungan dan titik-titik terendah setiap alirannya. Sehingga terjadi penumpukan material pada titik-titik tersebut seperti badan sungai. Settling pond merupakan media untuk menurunkan tingginya angka total suspended solid. Untuk dapat bekerja secara optimal, perlu dilakukan kajian terhadap debit dan daya tampung settling pond. Sehingga air yang dilepas ke lingkungan, tidak melebihi ambang batas yang ditetapkan menurut Peraturan Pemerintah Nomor 82 tahun 2001 “tentang pengelolaan kualitas air dan pengendalian pencemaran air”. Pengelolaan total suspended solid dilakukan dengan metode sedimentasi pada settling pond. Perhitungan prakiraan debit, daya tampung dan persentase pengendapan dapat dilakukan secara matematis. Pada akhirnya diharapkan durasi air untuk keluar dari settling pond lebih lama dibandingkan waktu pengendapan. Sehingga pengendapan terjadi secara optimal sebelum air tersebut keluar dari settlingpond. Faktor lain yang harus diperhatikan adalah interval waktu pengerukan. Interval waktu pengerukan merupakan cerminan terhadap evaluasi kinerja settling pond. Waktu pengerukan diharapkan lebih lama, sehingga waktu pengerukan tidak menyita waktu produktif. Kata kunci: settlingpond, total suspended solid, pengendapan The flow rate of a water body is a primary factor influencing turbidity concentrations. Fast running water can carry more particles and larger-sized sediment. Heavy rains can pick up sand, silt, clay, and organic particles from the land and carry it to surface water. Settling pond is a medium to reduce the high number of total suspended solids. Sediment availability in the study basins is related to land use and underlying geology. To maximize the Settling pond capacity to be employed to define a management strategy that minimizes environmental risk as well as by Government Regulation No. 82 of 2001 " on water quality management and water pollution control " . Total suspended solids carried management by sedimentation method in settling pond . mathematically calculation of discharge forecasts , capacity and percentage of sedimentation. In the end, duration expected for longer than the time of sedimentation. Maximum sedimentation occurs before the water out of the settlingpond . Another factor to consider is the time interval dredging . Dredging time interval is a reflection of the performance evaluation settling pond . Dredging expected longer time , so it does not take productive time . Keywords : settling pond , total suspended solids , sedimentation
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TD Environmental technology. Sanitary engineering |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment |
Depositing User: | Erny Azyanti |
Date Deposited: | 10 Jun 2016 02:13 |
Last Modified: | 10 Jun 2016 02:13 |
URI: | http://eprints.upnyk.ac.id/id/eprint/3528 |
Actions (login required)
View Item |