Habara, Alvin and Kristanto, Dedy (2021) Evaluation of Scale Deposition in Production Tubes with Direct Assessment Approach in The 'AH' Oil Field. In: AIP Conference Proceedings 2363, 020019 (2021), 2021, Yogyakarta Indonesia.
Text
4- Prosiding AIP Conference 2021-Evaluation of Scale Deposition (November 2021).pdf Download (891kB) |
Abstract
Scaling in the production tube can directly disrupt production, resulting in decreased production rates, pressure, and extra work on the workover, resulting in additional costs. The scale prevention method for tubing production uses an inhibitor, but many factors cause the inhibitor not to work optimally. Some scale deposes only in a particular area in the production tube due to turbulence flow, temperature, and pressure differences. The direct assessment using the Coiled Tubing Unit (CTU) will assess the calcite scale formation location based on well intervention result. The use of coiled tubing is combined with the acid injection; thus, the amount of calcite reacts with the acid in the 'tagged area' is measured to describe the amount of deposed calcite. In AH wells that have 88% water cut and with a scale index of 4.1, the estimated amount of carbonate is 15.10 kg.
Keywords: Evaluation, Scale Deposition, Production Tubes, Assesment, Oil
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Evaluation, Scale Deposition, Production Tubes, Assesment, Oil |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Dr.Ir, MT Dedy Kristanto |
Date Deposited: | 31 Mar 2023 14:24 |
Last Modified: | 31 Mar 2023 14:25 |
URI: | http://eprints.upnyk.ac.id/id/eprint/33092 |
Actions (login required)
View Item |