Abstract
Kebutuhan pasar yang terus meningkat akan permintaan batugamping di
PT. Sugih Alamanugroho, Desa Bedoyo, Kecamatan Ponjong, Kabupaten Gunung
Kidul, dan cadangan di Gunung Sidowayah yang semakin sedikit, maka dilakukan
perhitungan cadangan pada Gunung Pokerso agar setelah cadangan di Gunung
Sidowayah habis maka penambangan dapat dilanjutkan di Gunung Pokerso
sehingga perusahaan dapat memenuhi permintaaan batugamping. Perhitungan
cadangan sangat diperlukan sebelum melakukan kegiatan penambangan.
Pemilihan metode perhitungan cadangan sebaiknya dipilih yang murah, cepat,
mudah dilaksanakan dan hasil yang representatif. Dalam hal ini dipilih Metode
Cross Section dan Metode Contour.
Pada Metode Cross Section, dilakukan dengan membuat penampang
(sayatan). Sayatan yang dibuat sebanyak 15 sayatan yang terbagi dalam 14 blok,
dari sayatan A – A’, sayatan B - B’, sayatan C - C’ sampai dengan sayatan
O - O’. Sayatan dibuat berdasarkan atas topografi endapan batugamping yang
terdiri dari bagian topografi puncak, lereng, dan lembah, dengan jarak antar
sayatan 20 meter. Sedangkan pada Metode Contour, jarak antar kontur adalah
20 meter, terbagi dalam 2 blok yang terdiri dari 3 buah kontur yaitu kontur 430,
kontur 410 dan kontur 390. Kontur tertinggi 430 meter di atas permukaan laut dan
kontur terendah adalah 390 meter di atas permukaan laut.
Adapun pengukuran luas dengan menggunakan bantuan program komputer,
yaitu Softwere Autocad dan Quicksurf. Kemudian volume menggunakan Rumus
Mean Area dan Rumus Frustum.
Berdasarkan estimasi dengan menggunakan Metode Cross Section diperoleh
tonase cadangan batugamping terbukti sebesar 1.304.343,18 Ton, sedangkan
dengan Metode Contour diperoleh tonase cadangan batugamping terbukti sebesar
1.216.335,25 Ton. Hasil estimasi cadangan dari kedua metode diperoleh nilai
estimasi untuk Metode Cross Section yang lebih besar bila dibandingkan dengan
Metode Contour, dengan perbedaan hasil estimasi tonasenya yaitu sebesar
88.007,93 Ton.
Perhitungan umur tambang didapatkan berdasarkan sasaran produksi yang
direncanakan, yaitu 36.288 Ton/tahun. Umur tambang pada Gunung Pokerso
menggunakan Metode Cross Section adalah 35,94 tahun 36 tahun, sedangkan
Metode Contour adalah 33,52 tahun 34 tahun.
Increasing market needs will demand limestones at PT. Sugih Alamanugroho, Bedoyo
Village, District Ponjong, Gunung Kidul, and reserves at Mount Sidowayah less and less, then
do a calculation of reserves at Mount Pokerso so after reserves at Mount Sidowayah out then
mining can proceed in Mount Pokerso so that the company can meet the limestones to the
request. Calculation of reserves is necessary before mining operations. The selection of the
method of calculation should be selected reserves of cheap, fast, easy to implement and the
results are representative. In this case the selected method of Cross Section and Contour
Method.
In Cross Section Method, conducted by making cross (incision). An incision is made as
much as 15 incisions were divided into 14 blocks, from the incision A - A ', incision B - B',
incision C - C 'until the incisions O - O'. An incision is made based on the topography of
limestone sediment that consists of the topographic crest, slopes and valleys, with the slice
spacing of 20 meters. While the method of Contour, contour spacing is 20 feet, divided into two
blocks consisting of 3 pieces of the contour of the contours of 430, 410 and contour contour 390.
Highest contour 430 meters above sea level and the lowest contour is 390 feet above sea level.
The area measurements with the aid of a computer program, which Softwere Autocad and
Quicksurf. Then the volume using the formula Mean Area and Frustum Formulas.
Based on estimates using the method of Cross Section proven limestone reserves acquired
tonnage of 1,304,343.18 tons, while the Contour Method with proven limestone reserves
acquired tonnage of 1,216,335.25 tons. The results of both methods of reserve estimation
obtained estimated values for Cross Section Method larger than the Contour Method, the
estimated difference in the amount of 88007.93 Tons.
Got mine life calculation based on planned production targets, ie 36 288 tons / year. Life
of the mine at Mount Pokerso using Method Cross Section is 35.94 years 36 years, while the
Contour Method was 33.52 years 34 years.
Keywords: Limestone, Reserves Estimation, Cross Section Method, Contour Method
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 08 Jun 2016 01:46 |
Last Modified: | 08 Jun 2016 01:46 |
URI: | http://eprints.upnyk.ac.id/id/eprint/3215 |
Actions (login required)
![]() |
View Item |