TRIWANTO, ALIP (2022) PERANCANGAN ULANG POMPA PROGRESSIVE CAVITY PUMP SUMUR ATR-17 DAN ATR-19 DI SHALLOW ZONE d/320 DAN b/400 STRUKTUR KAS LAPANGAN ATR. Masters thesis, UPN 'Veteran" Yogyakarta.
| 
              
Text
 Daftar Isi_Alip T.pdf Download (620kB)  | 
          |
| 
              
Text
 Daftar Pustaka_Alip T.pdf Download (524kB)  | 
          |
| 
              
Text
 Hal Pengesahan_Alip T.pdf Download (184kB)  | 
          |
| 
              
Text
 Ringkasan dan Abstrak_Alip T.pdf Download (335kB)  | 
          |
| 
              
Text
 2022.11.21_Draft Tesis Alip Triwanto Revisi Setelah Sidang_sent.pdf Restricted to Repository staff only Download (6MB)  | 
          |
| 
              
Text
 Cover_Alip T.pdf Download (376kB)  | 
          
Abstract
RINGKASAN 
Struktur KAS merupakan salah satu struktur penghasil minyak di Lapangan 
ATR dengan jumlah sumur penghasil minyak sebanyak 67 sumur dimana sebanyak 
48 sumur diproduksikan menggunakan artificial lift berupa Progressive Cavity 
Pump (PCP). Data hasil perawatan sumur selama periode tahun 2019 menunjukkan 
bahwa dari 48 sumur PCP di Struktur KAS yang memiliki lifetime kurang dari 6 
bulan sebanyak 25 %, memiliki lifetime 6-12 bulan sebanyak 23 % dan memiliki 
lifetime diatas 12 bulan sebanyak 52 % populasi. Sumur ATR-17 diproduksikan 
dari layer b/400 dan memiliki lifetime hanya 5 hari yang disebabkan oleh kerusakan 
elastomer yang merupakan salah satu komponen utama pompa PCP. Sumur ATR�19 diproduksikan dari layer d/320 dengan lifetime rata-rata 46 hari yang disebabkan 
oleh permasalahan berulang berupa tubing bocor. Rendahnya lifetime sumur 
berdampak pada proses pengurasan minyak dan timbulnya biaya tambahan untuk 
pekerjaan perawatan sumur. Oleh karena itu untuk menjawab permasalahan 
tersebut dengan tetap memperhitungkan kaidah keteknikan yang baik (good 
engineering practices) diperlukan perancangan ulang pompa PCP di Struktur KAS 
Lapangan ATR. 
Untuk mengetahui penyebab rendahnya lifetime sumur digunakan metodologi 
penelitian dengan terlebih dahulu melakukan pengumpulan data berupa data 
reservoir, data sifat fisik fluida, data teknis sumur, data test sumur dan data 
perawatan sumur. Kemudian data tersebut dianalisa dan diolah untuk mengetahui 
lifetime sumur PCP yang ada di Struktur KAS. Setelah itu dilakukan evaluasi 
pompa eksisting dan dilakukan perancangan ulang berdasarkan data terbaru. Hasil 
perancangan ulang diaplikasikan ke sumur ATR-17 dan ATR-19 kemudian 
dilakukan perbandingan lifetime sumur. 
Hasil dari penelitian ini diperoleh bahwa perancangan ulang pompa yang 
dilakukan di sumur ATR-17 dengan kombinasi metode dengan mengurangi potensi 
gesekan antara sucker rod dan tubing dan mengganti material tubing dengan bahan 
yang lebih tahan dengan gesekan mekanis mampu mengatasi permasalahan tubing 
bocor dimana hal ini terlihat dari lifetime sumur ATR-17 meningkat dari rata-rata 
46 hari menjadi 15 bulan dengan total penghematan biaya sebesar Rp. 
1.511.697.012. Sementara perancangan ulang yang dilakukan di Sumur ATR-19 
dengan pemilihan elastomer yang tepat sesuai dengan rekomendasi elastomer 
compatibilty test mampu mengatasi permasalahan kerusakan dini elastomer dimana 
hal ini terlihat dari lifetime sumur ATR-19 meningkat dari 5 hari menjadi lebih dari 
13 bulan dengan total penghematan biaya sebesar Rp. 4.124.249.222. 
Kata kunci: progressive cavity pump, PCP, lifetime, perancangan ulang, pump 
stuck, elastomer. 
 
ABSTRACT 
The KAS structure is one of the oil-producing structures in the ATR Field 
with a total of 67 oil-producing wells of which 48 wells are produced using an 
artificial lift Progressive Cavity Pump (PCP). The data on the results of well service 
during the 2019 period show that of the 48 PCP wells in the KAS Structure that 
have a lifetime of fewer than 6 months as much as 25%, have a lifetime of 6-12 
months as much as 23% and have a lifetime above 12 months as much as 52% of 
the population. The ATR-17 well is produced from layer b/400 and has a lifetime 
of only 5 days caused by damage to the elastomer which is one of the main 
components of the PCP pump. The ATR-19 well is produced from layer d/320 with 
an average lifetime of 46 days caused by repeated problems in the form of leaking 
tubing. The low life of the well has an impact on the oil draining process and the 
emergence of additional costs for well maintenance work. Therefore, to answer 
these problems while still taking into account good engineering practices, it is 
necessary to redesign the PCP pump in the ATR Field KAS Structure 
To find out the cause of the low life of the well, a research methodology was 
used by first collecting data in the form of reservoir data, fluid physical properties 
data, well technical data, well test data, and well service data. Then the data is 
analyzed and processed to determine the lifetime of the PCP wells in the KAS 
Structure. After that, an evaluation of the existing pump was carried out and a 
redesign was carried out based on the latest data. The results of the redesign were 
applied to the ATR-17 and ATR-19 wells and then a comparison of the lifetime of 
the wells was carried out. 
The results of this study obtained that the pump redesign carried out in the 
ATR-17 well with a combination of methods by reducing the potential for friction 
between the sucker rod and tubing and replacing the tubing material with a material 
that is more resistant to mechanical friction can overcome the problem of leaking 
tubing where this can be seen from the lifetime ATR-17 wells increased from an 
average of 46 days to 15 months with a total cost savings of Rp. 1,511,697,012. 
While the redesign carried out at the ATR-19 well with the selection of the right 
elastomer following the elastomer compatibility test recommendations was able to 
overcome the problem of premature elastomer damage where this can be seen from 
the lifetime of the ATR-19 well which increased from 5 days to more than 13 
months with total cost savings. of Rp. 4,124,249,222. 
Keywords: progressive cavity pump, PCP, lifetime, redesign, pump stuck, 
elastomer.
| Item Type: | Thesis (Masters) | 
|---|---|
| Uncontrolled Keywords: | progressive cavity pump, PCP, lifetime, redesign, pump stuck, elastomer. | 
| Subjek: | T Technology > T Technology (General) | 
| Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences | 
| Depositing User: | Eko Yuli | 
| Date Deposited: | 08 Dec 2022 01:31 | 
| Last Modified: | 08 Dec 2022 01:31 | 
| URI: | http://eprints.upnyk.ac.id/id/eprint/31844 | 
Actions (login required)
![]()  | 
        View Item | 