MANURUNG, RIKY AGUSETIAWAN (2022) RATIO PENIMBUNAN ANTARA MATERIAL LUNAK DAN MATERIAL KERAS UNTUK MEMENUHI PRODUKSI DISPOSAL PADA SITE LATI MINE OPERATION PT. BERAU COAL, KALIMANTAN TIMUR. Other thesis, UNSPECIFIED.
| ![[thumbnail of Cover Skripsi_Riky A M_112180024.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text Cover Skripsi_Riky A M_112180024.pdf Download (304kB) | 
| ![[thumbnail of Daftar Isi_Riky A M_112180024.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text Daftar Isi_Riky A M_112180024.pdf Download (392kB) | 
| ![[thumbnail of Daftar Pustaka_Riky A M_112180024.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text Daftar Pustaka_Riky A M_112180024.pdf Download (535kB) | 
| ![[thumbnail of Draft Skripsi_Riky Agusetiawan Manurung_112180024.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text Draft Skripsi_Riky Agusetiawan Manurung_112180024.pdf Restricted to Repository staff only Download (8MB) | 
| ![[thumbnail of lembar pengesahan_Riky A M_112180024.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text lembar pengesahan_Riky A M_112180024.pdf Download (223kB) | 
| ![[thumbnail of Abstrak_Riky A M_112180024.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text Abstrak_Riky A M_112180024.pdf Download (597kB) | 
Abstract
vi
SUMMARY
 The study was conducted at PT. Berau Coal, Lati Mine Operation site which is 
located in the district of Gunung Tabur, Berau, East Kalimantan province starting 
from September 2nd of 2021 to Desember 31th 0f 2021.
 The overburden stripping activity by PT. Berau Coal as the owner uses 
conventional methods for mining activities, namely using a combination of loading 
an unloading equipment and transportatioon equipment. The digging tools uses are 
the Excavator 2000 and the Caterpillar 777D hauling equipment. 
 One of the mining stages is to excavate and fill the overburden (OB) layer. OB 
material is transported to the dumping or disposal location for dumping until it 
reaches the final dump condition in accordance with the plan that has been made 
previously covering the area, shape and elevation of the stockpile. 
 The dumping ratio from the current evaluation is soft material 1 : 3,55 hard 
material. In this PQRT pit area by considering the need for hard material or 
blasting material, where in the PQRT pit for hard materials the volume is very 
limited with a lot of soft material at the top that must be removed first. The hard 
material is very necessary to be used as dumping material in front loading swamp 
areas, ex-disposal areas that are redisturb, dumping soft materials in disposal 
areas and material for layering on mining roads. 
 This study analyzes the activities of ratio dumping in the disposal area. This 
research is intended so that the results of the dumping ratio in the disposal area 
are in accordance with company standards, namely soft material 1 : 3 hard 
material. Thus, excess soft material can be transferred to Channel Dump. This 
research can be completed properly and on time. The results of the research on the 
comparison between soft and hard materials can be used as evaluation material by 
the company owner. 
 Based on the results of the study, it was found that the production of Excavator 
PC2000 from the front to channel dump was 20.474 BCM/Month and the 
production of Excavator PC2000 from the front to the disposal was 
20.861 BCM/Month. Meanwhile, the production of HD-777 from the front to 
channel dump is 18.715,5 BCM/Month and the production of HD-777 from front to 
disposal is 14.392 BCM/Month.
| Item Type: | Tugas Akhir (Other) | 
|---|---|
| Subjek: | T Technology > TA Engineering (General). Civil engineering (General) | 
| Depositing User: | Eko Yuli | 
| Date Deposited: | 25 Oct 2022 07:06 | 
| Last Modified: | 25 Oct 2022 07:06 | 
| URI: | http://eprints.upnyk.ac.id/id/eprint/31483 | 