RENCANA REKLAMASI PADA LAHAN BEKAS PENAMBANGAN TANAH LIAT DI KUARI TLOGOWARU PT. SEMEN INDONESIA (Persero) Tbk. PABRIK TUBAN, JAWA TIMUR

PARASCITA, LAKSA (2015) RENCANA REKLAMASI PADA LAHAN BEKAS PENAMBANGAN TANAH LIAT DI KUARI TLOGOWARU PT. SEMEN INDONESIA (Persero) Tbk. PABRIK TUBAN, JAWA TIMUR. Other thesis, UPN ''VETERAN'' YOGYAKARTA.

[img]
Preview
Text
abstrak.pdf

Download (36kB) | Preview

Abstract

Penelitian ini terletak di area penambangan tanah liat di kuari Tlogowaru, Desa Temandang, Kecamatan Merakurak, Kabupaten Tuban, Provinsi Jawa timur. Tujuan dilakukannya penelitian ini adalah untuk merencanakan kegiatan reklamasi di area tersebut sehingga meningkatkan dan memperbaiki kualitas lingkungan. Luas area penambangan tanah liat di kuari Tlogowaru adalah 250 Ha dengan total tertambang 191,0 Ha. Target produksi 1,58-3,19 juta ton/tahun. Berdasarkan kondisi morfologi area penambangan tanah liat dan ketersediaan tanah pucuk, penelitian ini memilih metode penataan tanah pucuk dengan sistem guludan dan sistem pot. Karena metode ini membutuhkan jumlah tanah pucuk yang sedikit. Di Blok V dengan luas 1,2 Ha membutuhkan 2.520 LCM tanah pucuk dengan jumlah tanaman 564 pohon. Sedangkan di Blok VI dengan luas 2,3 Ha membutuhkan tanah pucuk sebanyak 68,89 LCM dan jumlah tanaman 2.555 pohon. Serta waktu yang dibutuhkan untuk pembuatan dan pengisian lubang tanam dengan jumlah pekerja 10 orang, untuk Blok V adalah 6,4 jam dan Blok VI adalah 3 hari 7 jam. Tanaman yang digunakan untuk kegiatan revegetasi adalah kombinasi tanam keras dan tanaman buah. Tanaman keras dipilih Trembesi, yang ditanam di sepanjang jalan angkut tambang. Sedangkan tanaman buah dipilih pohon Sukun yang ditanam di lahan reklamasi dan jenjang yang tidak digenangi air untuk mengembalikan lahan bekas penambangan tersebut menjadi lahan yang lebih produktif This research take a place in the area of clay mining pit located in the Tlogowaru area, Temandang Village, District Merakurak, Tuban, province of East Java. The purpose of this research is planning for reclamation activity in that area to improve environmental conditions. Quarry clay Tlogowaru is 250 hectare wide with total mineable 191,0 hectare. Production target 1,58-3,19 million ton/year. Based on the morphological condition of the clay mining area, and the availability of top soil this reasearch choose the most efficient structuring top soil method that required only few top soil. On the Block V, 1,2 hectare wide with 564 pot and 2.520 LCM of top soil. While on the Block VI, 2,3 hectares wide with 2.555 pot and 68,89 LCM of top soil. The time required of making and filling the planting hole with the number of workers 10 people on the ready reclaimed land Block V is 6,4 hours, and Block VI is 3 days 7 hours. Scheduling activities is used to determine the efficient time to revegetated. The Types of plants that will be used for revegetation activities are a combination of perennials plants and fruit plants. For perennials plants are Trembesi, planted along the road carrying, whereas for the fruit plants are Breadfruit trees, planted on reclaimed land and planted at levels that are not flooded by the water to restore the land into productive land designated as forest. Keywords: Revegetate, time, plant

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Erny Azyanti
Date Deposited: 07 Jun 2016 05:26
Last Modified: 07 Jun 2016 05:26
URI: http://eprints.upnyk.ac.id/id/eprint/3147

Actions (login required)

View Item View Item