IKHSANI, JAFAR NURUL (2022) ANALISIS BLAST DAMAGE ZONE TERHADAP DINDING AKHIR PENAMBANGAN BATUBARA DI BLOK 3 PIT BALIMAS PT. ENERGI BATUBARA LESTARI KABUPATEN TAPIN KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
Abstrak.pdf Download (62kB) | Preview |
Preview |
Text
Cover Skripsi.pdf Download (163kB) | Preview |
Preview |
Text
Daftar Pustaka(2).pdf Download (132kB) | Preview |
Preview |
Text
Daftar Isi.pdf Download (138kB) | Preview |
Preview |
Text
Lembar Pengesahan.pdf Download (233kB) | Preview |
Text
Skripsi-1-.pdf Restricted to Repository staff only Download (5MB) |
Abstract
. v
RINGKASAN
PT. Energi Batubara Lestari merupakan perusahaan pertambangan batubara
yang terletak di Kecamatan Bungur, Kabupaten Tapin, Kalimantan Selatan.
Kegiatan pengeboran dan peledakan diterapkan untuk memberai overburden
dengan target produksi peledakan 15.000 BCM/hari. Kegiatan peledakan dalam
pembentukan lereng akhir di Blok 3 Pit Balimas mengalami permasalahan, yaitu
pasca peledakan terjadi dinding retak di lereng akhir highwall. Oleh karena itu,
perlu dilakukan analisis getaran tanah yang menyebabkan kerusakan batuan.
Tujuan dari penelitian ini adalah mendapatkan persamaan prediksi Peak
Particle Velovity (PPV) menggunakan metode regresi multivariate dan
menganalisis kerusakan dinding lereng aktual highwall pada peledakan
pembentukan lereng akhir menggunakan batas kriteria kerusakan batuan 125 mm/s
(Savely, 1986). Selain itu juga menentukan batas zona kerusakan batuan akibat
peledakan menggunakan parameter nilai PPV yang diterima dinding akhir.
Berdasarkan hasil persamaan prediksi PPV dapat diusulkan rancangan peledakan
yang digunakan di zona buffer.
Dari hasil perhitungan aktual pada peledakan pembentukan lereng highwall
didapatkan nilai PPV masih dibawah ambang batas kerusakan batuan yaitu pada
jarak 14 m sebesar 80 mm/s. Hal ini menunjukan retak yang terjadi pada lereng
highwall dimungkinkan tidak disebabkan akibat kegiatan peledakan yang
diterapkan. Batas zona blast damage yang diusulkan pada geometri yang sedang
diterapkan yaitu: zona peledakan produksi sejauh 12 m dari dinding akhir dengan
isian ANFO 57,5 kg/lubang dan zona buffer <12 m diukur dari dinding akhir.
Berdasarkan persamaan prediksi, dapat ditentukan usulan rancangan peledakan di
zona buffer. Usulan modifikasi rancangan peledakan pada zona buffer yaitu: untuk
peledakan pada radius 5 m menggunakan isian 35 kg per lubang dengan kedalam
lubang 4 m, pada jarak 8 m sebanyak 40 kg dengan kedalaman lubang 6 m, dan
untuk jarak 11 m menggunakan isian sebanyak 51,5 kg dengan kedalaman lubang
ledak 7,5 m.
.vi
SUMMARY
PT. Energi Batubara Lestari was a coal mining company located in Bungur
District, Tapin Regency, South Kalimantan. Drilling and blasting activities were
applied to breakage overburden with a blast production target of 15,000 BCM/day.
Blasting activities in the formation of the final slope at Block 3 Balimas Pit
experienced a problem, which were cracks on the highwall slope. Therefore, it was
necessary to analyze ground vibrations that cause rock damage.
The purpose of this research was getting prediction formulation for Peak
Particle Velocity (PPV) based multivariate regression method and to analyze
actual final slope damage due to blasting using criteria of observable damage
125 mm/s (Savely, 1986). Beside that, this research to determine the distance of
the rock damage zone due to blasting using PPV value parameter received by the
toe final slope. Based on the result of the PPV prediction formulation, it could be
proposed of blasting design used in buffer zone.
The calculation results of blasting on the formation of highwall slopes
concluded that the PPV value still below the rock damage threshold, which was
80 mm/s for a distance 14 m. It showed that the cracks that occurred was not
affected by blasting activities. The proposed blast damage zone for blasting
production was 12 m from the toe final slope with ANFO filling was 57,5 kg/hole
and buffer zone < 12 m that measured from toe final slope. Based on the prediction
formula, it could determine the proposed blasting design in the buffer zone. The
proposed modifications to the blasting design in the buffer zone were: for blasting
at a distance of 5 m using filling 35 kg/hole with depth hole of 4 m, at a distance of
8 m from toe final slope using 40 kg/hole with depth hole of 6 m, and for a distance
of 11 m using 51,5 kg/hole with depth hole of 7,5 m.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Penambangan batubara |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Yuli |
Date Deposited: | 08 Feb 2022 02:53 |
Last Modified: | 15 Aug 2022 08:00 |
URI: | http://eprints.upnyk.ac.id/id/eprint/28271 |
Actions (login required)
View Item |