IBRAHIM, IBRAHIM (2014) KAJIAN TEKNIS PENINGKATAN PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN LAPISAN PENUTUP UNTUK MENCAPAI TARGET PRODUKSI SEBESAR 1.350 BCM/JAM FLEET I FLEET II PT. BUKIT MAKMUR MANDIRI UTAMA KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
|
Text
Ringkasan.pdf Download (21kB) | Preview |
|
|
Text
ABSTRACK.pdf Download (19kB) | Preview |
Abstract
PT. Bukit Makmur Mandiri Utama Job Site Kideco Jaya Agung termasuk daerah Desa Batu Kajang, Kecamatan Batu Sopang, Kabupaten Pasir, Provinsi Kalimantan Timur. Sistem penambangan yang diterapkan adalah sistem tambang terbuka dengan metode open pit yang dilakukan dengan cara yang peledakan dan kombinasi kerja antara alat muat dan alat angkut. kegiatan pengupasan lapisan penutup di PT. Bukit Makmur Mandiri Utama dilakukan dengan menggunakan kombinasi alat muat power shovel 4000-04 sebanyak 1 (satu) unit pada fleet I dengan kapasitas 24 m3, dan Backhoe 3600-08 sebanyak 1 (satu) unit pada fleet II dengan kapasitas 23 m3 dan alat angkut Dump Truck Catterpilar 789.C pada fleet I, sebanyak 7 unit dengan kapasitas bak 120 m3 dan Dump Truck Catterpilar 785.C pada fleet II kapasitas sebesar 93,75 m3 sebanyak 7 unit. Tareget produksi lapisan penutup yang ditetapkan oleh PT. Bukit Makmur Mandiri Utama sebesar 1.350 Bcm/jam. Saat ini besarnya produksi alat muat fleet I yaitu 1.549,2 Bcm/jam, produksi alat angkut fleet I saat ini didapatkan sebesar 1.436,4 Bcm/jam Produksi alat muat fleet II saat ini sebesar 1.518,3 Bcm/jam produksi alat angkut fleet II saat ini sebesar 1.264,5 Bcm/jam. Saat ini produksi fleet I telah tercapaikan. Namun tidak terjadi pada produksi alat angkut Dump Truck Catterpilar 785.C fleet II belum memenuhi target produksi yang telah ditentukan, oleh karena itu perlu dilakukannya perbaikan-perbaikan untuk meningkatkan produksi alat angkut fleet II yag telah ditentukan. Upaya yang dapat dilakukan untuk meningkatkan peroduksi fleet II adalah dengan upaya melakukan peningkatan waktu kerja efektif yaitu dengan cara mengurangi waktu hambatan yang dihindari yang telah terjadi dalam kegiatan pengangkutan dan pemuatan, waktu hambatan yang tidak dapat dihindari dengan mengunakan metode modus statistika yaitu dengan cara modus dimana metode modus dapat disebut nilai yang sering terjadi atau sering muncul. Setelah dilakukan perbaikan terhadap waktu hambatan-hambatan pada alat mekanis, efesiensi kerja untuk alat gali muat meningkat. Produksi alat muat fleet II semula dengan efesiensi kerja 80,16 % didapatkan produksi sebesar 1.518,3 Bcm/jam setelah dilakukan peningkatan efesiensi menjadi 86,65 % produksi alat muat fleet II meningkat sebesar 1.630,1 Bcm/jam. Produksi alat angkut fleet II semula dengan efesiensi 81,69 % didapatkan produksi sebesar 1.264,5 Bcm/jam setelah dilakukan peningkaan efesiensi menjadi 87,41 % produksi alat angkut fleet II didapatkan sebesar 1.357,7 Bcm/jam. Dengan meningkatnya efesiensi kerja alat muat dan alat angkut fleet II produksi juga meningkat sehingga produksi sebesar 1.350 Bcm/jam telah tercapaikan pada alat angkut fleet II. PT. Bukit Makmur Mandiri Utama Job Site Kideco Jaya Agung including Stone Village area of Kajang, District Sopang Stone, Sand Regency, East Kalimantan Province. Mining system is a system that is applied to an open pit mine with open pit method is done in a way that is blasting and the combination of work between unloading and conveyance tools. Overburden stripping activities at PT. Bukit Makmur Mandiri Utama is done by using a power shovel fit 4000-04 as many as 1 (one) unit in the fleet with a capacity of 24 m3 I, and 3600-08 Backhoe 1 (one) unit on the second fleet with a capacity of 23 m3 bucket and conveyance Dump Truck Catterpilar 789.C on the first fleet, 7 units with a capacity of 120 m3 and a tub for Dump Truck Catterpilar 785.C on the second fleet capacity of 93.75 m3 7 units. Cover production targets set by PT. Bukit Makmur Mandiri Utama amounted to 1,350 Bcm / hour. Currently the size of the fleet I fit tool production is 1549.2 Bcm / h, the production of transportation equipment fleet I currently obtained at 1436.4 Bcm / h, load the tools production II fleet is currently at 1518.3 Bcm / hour. Production of transport equipment fleet is currently at 1264.5 II Bcm / hour. Currently I have tercapaikan fleet production, but does not occur in the production of transportation equipment Dump Truck Fleet II Catterpilar 785.C not meet production targets that have been determined, it is therefore necessary repairs done to increase the production of transport equipment fleet predetermined II. Efforts should be made to increase the production fleet II is the effort to increase in the effective working time that is by reducing the time to avoid obstacles that have occurred in the activities of loading, transporting and time barriers that can not be avoided by using a statistical method that is the way mode mode is the mode in which the method can be called common values or frequently arise. After repairs to the time constraints on the mechanical device, the working efficiency for increased production excavator loading and unloading apparatus II fleet efficiency of work initially with 80.16% obtained a production of 1518.3 Bcm / hour, following an increase in the efficiency to be 86.65 % production tools fit II fleet increased by 1630.1 Bcm / hour. Production of the original conveyance fleet II with 81.69% efficiency of production be obtained at 1264.5 Bcm / hour after boosting production efficiency becomes 87.41% fleet conveyance II obtained at 1357.7 Bcm / hour. By increasing the efficiency of work load and conveyance apparatus fleet II production is also increased so that the production of 1,350 Bcm / hour have fulfilled on conveyance fleet II.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 25 May 2016 04:19 |
Last Modified: | 25 May 2016 04:19 |
URI: | http://eprints.upnyk.ac.id/id/eprint/2422 |
Actions (login required)
View Item |