ANALISIS POWDER FACTOR UNTUK MENGOPTIMALKAN DIGGING TIME ALAT LOADING PC 2000 DI PIT 4 BLOK 17-23 PT BUKIT MAKMUR MANDIRI UTAMA JOBSITE SENAKIN KALIMANTAN SELATAN

X. ARONGGEAR, VANESSA (2013) ANALISIS POWDER FACTOR UNTUK MENGOPTIMALKAN DIGGING TIME ALAT LOADING PC 2000 DI PIT 4 BLOK 17-23 PT BUKIT MAKMUR MANDIRI UTAMA JOBSITE SENAKIN KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of ABSTRAC.pdf]
Preview
Text
ABSTRAC.pdf

Download (7kB) | Preview
[thumbnail of DAFTAR ISI.pdf]
Preview
Text
DAFTAR ISI.pdf

Download (22kB) | Preview
[thumbnail of JUDUL.pdf]
Preview
Text
JUDUL.pdf

Download (40kB) | Preview
[thumbnail of RINGKASAN.pdf]
Preview
Text
RINGKASAN.pdf

Download (16kB) | Preview

Abstract

Mining activities are conducted in PT. BUMA Job Site Senakin using open pit system
with high levels varied between 0.5 to 14 meters. Overburden stripping is done by 2 methods
of dismantling the direct excavation as much as 30% and 70% with blasting methods.
Overburden production targets for demolition by blasting method in May in Pit 4 is 14,044
Bcm / day, while the production of blasting results on average per day were obtained in Pit 4
is 10 487 Bcm / day so that the planned production target has not been achieved.
PT. BUMA is the contractor of PT. Arutmin Indonesia to dismantle overburden by
blasting method. Blasting initiation systems used are non-electric initiation systems, the time
delay in the hole (inhole delay) of 500 ms and the time delay on the surface (surface delay) of
25 ms, 42 ms and 75 ms.
The explosives used were Anfo and Emulsion (Fortis) 816 with an average weight of
145.00 kg/pit and booster explosive weighing 0.4kg/explosive hole.
At the time of the study carried out blasting geometry is applied is: 7m burden; spacing of 8
m; stemming 4 m; blast hole depth of 9 m; primary charge 5 m, 10 m high levels and powder
factor 0.47 kg/m3.
Efforts to comply with the production of explosive overburden the number of holes
needed for production targets in May on average per day in Pit 4 is a 30 hole uncovered
explosive rock volume of 10 487 m3/jumlah explosives used in Pit 4 at 4091.95 kg / the
powder factor of 0.37 kg/m3. Meanwhile, to reduce the boulder in the field today, blasting
geometry repair done by using the approach of the theory of RL Ash (1967).
To predict rock fragmentation produced, can use the formula of KUZNETOZ. Results
of the study on the percentage fragmentase rock, drilling efficiency, use of explosives and
blasting production is based on the theory of RL Ash (1967). because it produces a lower
powder factor. If the rock density of 2.46 gr/cm3, then buden 6 m, 7 m spacing; stemming 4
m; subdrilling 1 m; kadalaman blast holes 9 m; higher levels of 8m; primary charge 5 m and
weight of explosives was 105.55 kg / hole.

Item Type: Thesis (Other)
Subjek: T Technology > T Technology (General)
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eny Suparny
Date Deposited: 25 May 2016 01:25
Last Modified: 25 May 2016 01:25
URI: http://eprints.upnyk.ac.id/id/eprint/2342

Actions (login required)

View Item View Item