BARGAWA, Waterman Sulistyana (2008) Penjadwalan Produksi (Mine Scheduling) pada Perancangan Teknis Penambangan Batubara secara Tambang Terbuka. In: Prosiding Seminar Nasional FTM UPNVYYogyakarta 5 Agustus 2008 (221-230), 5 Agustus 2008, Yogyakarta.
| Preview | Text 2008-semnas-ftm-penjadwalan produksi pada perancangan teknis penambangan batubara secara tambang terbuka_joz.pdf Download (945kB) | Preview | 
Abstract
The subject discussed in this paper deal with production planning, or more specifically, how the result of mine scheduling may relate back to short-range planning and final pit design. The items discussed here are: mine design, push back, overburden and coal, relationship to mine design and mine scheduling with computer method
| Item Type: | Conference or Workshop Item (Paper) | 
|---|---|
| Subjek: | T Technology > TA Engineering (General). Civil engineering (General) | 
| Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment | 
| Depositing User: | Dr.Ir. MT WATERMAN BARGAWAN SULISTYANA | 
| Date Deposited: | 22 May 2019 06:14 | 
| Last Modified: | 22 May 2019 06:16 | 
| URI: | http://eprints.upnyk.ac.id/id/eprint/19595 | 
Actions (login required)
|  | View Item |