MA’RUFI, RIZAL (2013) RANCANGAN TEKNIS PENGUPASAN LAPISAN MATERIAL PENUTUP DAN PENAMBANGAN BATUBARA DI SITE NAPAL PUTIH PT. INDONESIA RIAU SRI AVANTIKA KABUPATEN BENGKULU UTARA BENGKULU. Other thesis, UPN "Veteran" Yogyakarta.
|
Text
4.RINGKASAN.pdf Download (190kB) | Preview |
|
|
Text
5.ABSRAC.pdf Download (88kB) | Preview |
Abstract
PT. Indonesia Riau Sri Avantika (PT. IRSA) merupakan salah satu perusahaan pertambangan batubara di Indonesia yang memiliki job site berlokasi di Desa Bukit Berlian, Kecamatan Napal Putih, Kabupaten Bengkulu Utara, Provinsi Bengkulu. Aktivitas penambangan, PT. Indonesia Riau Sri Avantika menggunakan metode tambang terbuka. Daerah penelitian merupakan salah satu pit yang dikerjakan oleh PT. IRSA yaitu Site Napal Putih dengan luasan area penelitian sebatas akhir bulan Mei 2013 seluas 8,98 ha. Jumlah lapisan material penutup hingga final pit sebesar 4.184.292 bcm dan cadangan batubar sebesar 1.256.159 ton. Berdasarkan data PT. IRSA memiliki lapisan batubara 1 seam (seam A) dan secara umum pola penyebaran batubara di Site Napal Putih mempunyai lapisan batubara yang melingkar dari barat laut ke tenggara dengan kemiringan lapisan batubara yaitu 3° dan ketebalan batubara 0,3 – 7 m. PT. IRSA membutukan rancangan teknis pengupasan lapisan material penutup dengan SR penambangan batubara sebesar 5 : 1 dan target produksi batubara sebesar 50.000 bcm/bulan dalam jangka waktu 6 bulan. Geometri lereng penambangan untuk tinggi jenjang adalah 8 m, lebar jenjang 3 m, kemiringan jenjang tunggal 600, dan kemiringan jenjang keseluruhan 480. Lebar jalan angkut adalah 13 m untuk jalan lurus dan 17 m untuk jalan pada tikungan dengan jari – jari pada tikungan 7,8 m dan kemiringan jalan angkut sebesar 25 % (140). Rencana produksi lapisan material penutup dan batubara yang akan dibuka perbulan pada daerah telitian yang dijadwalkan selama 6 bulan yaitu: Rencana pengupasan lapisan material penutup bulan I sebesar 153.546 bcm, dengan batubara yang dapat di buka sebesar 68.924 ton dengan nilai stripping ratio sebesar 2,2: 1. Rencana pengupasan lapisan material penutup bulan II sebesar 151.045 bcm, dengan batubara yang dapat di buka sebesar 42.031 ton dengan nilai stripping ratio sebesar 3,6 : 1. Rencana pengupasan lapisan material penutup bulan III sebesar 150.962 bcm, dengan batubara yang dapat di buka sebesar 67.647 ton dengan nilai stripping ratio sebesar 2,2 : 1. Rencana pengupasan lapisan material penutup bulan IV sebesar 157.135 bcm, dengan batubara yang dapat di buka sebesar 99.429 ton dengan nilai stripping ratio sebesar 1,6 : 1. Rencana pengupasan lapisan material penutup bulan V sebesar 152.630 bcm, dengan batubara yang dapat di buka sebesar 55.547 ton dengan nilai stripping ratio sebesar 2,7 : 1. Rencana pengupasan lapisan material penutup bulan VI sebesar 150.930 bcm, dengan batubara yang dapat di buka sebesar 45.087 ton dengan nilai stripping ratio sebesar 3,3 : 1. Penimbunan dilakukan pada lokasi inpit dump site Napal Putih. Alat gali muat yang digunakan yaitu CAT 325B dan alat angkut untuk pengupasan lapisan material penutup menggunakan dump truck Volvo A25C. PT. Indonesia Riau Sri Avantika (PT. IRSA) is one of coal mining company in Indonesia which has a job site located in Bukit Berlian village, Napal Putih District, Bengkulu Utara Regency, Bengkulu Province. In conducting mining activities, PT. Indonesia Riau Sri Avantika uses a surface mining system. The research area is one of pits operated by PT. IRSA, Site Napal Putih, with the research area limited to 8,98 hectares in Mei 2013 and 4.184.292 bcm overburden and 1.256.159 tons coal reserves. Based on the data from PT. Indonesia Riau Sri Avantika, Site Napal Putih has 1 coal seam (A) and in general the pattern of coal distribution at Site Napal Putih has a circular coal seam from Nort West to South East with a coal seam inclination of 3° and coal thickness from 0.3 to 7 m. PT. IRSA needs technical plan of overburden stripping with SR of 5: 1 and the coal stripping production target of 50,000 ton / month within 6 months which are June 2013, July 2013, August 2013, September 2013, October 2013, dan November 2013 Mining slope geometries are 8 m height, 5 m width, 60o single slope inclination, and 48o overall slope inclination. Haul road width is 13 m for straight road and 17 m for curve road with 7,8 m radius and 25% (14o) for the haul road inclination. Overburden production plan and coal/month exposure at the research area are scheduled for 6 months. The first month of production of overburden stripping is 153.546 bcm and the coal which will be opened is 68.924 tones with stripping ratio (SR) 2,2. The second month of production of overburden stripping is 151.045 bcm and the coal which will be opened is 42.031 tones with stripping ratio (SR) 3,6. The Third month of production of overburden stripping is 150.962 bcm and the coal which will be opened is 67.647 tones with stripping ratio (SR) 2,2. The fourth month of production of overburden stripping is 157.135 bcm and the coal which will be opened is 99.429 tones with stripping ratio (SR) 1,6. The five month of production of overburden stripping is 152.630 bcm and the coal which will be opened is 55.547 tones with stripping ratio (SR) 2,7. The sixth month of production of overburden stripping is 150.930 bcm and the coal which will be opened is 45.087 tones with stripping ratio (SR) 3,3. Waste dump is created only at 1 location which is inpit dump Site Napal Putih located at northern sidewall inside the Site Napal Putih area which has been mined out its coal. Types of excavators used for overburden stripping is Caterpilar tipe 325B and Types of dump truck used for hauling overburden is Volvo tipe A25C.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 20 May 2016 06:16 |
Last Modified: | 20 May 2016 06:16 |
URI: | http://eprints.upnyk.ac.id/id/eprint/1937 |