RANCANGAN SISTEM PENYALIRAN TAMBANG TAHUN PERTAMA PENAMBANGAN PADA ZONA LISA UTARA PT. AGRO CITY KALTIM KECAMATAN LONG IRAM KABUPATEN KUTAI BARAT PROVINSI KALIMANTAN TIMUR

VARRYBASO, NATALIST RECHVO (2014) RANCANGAN SISTEM PENYALIRAN TAMBANG TAHUN PERTAMA PENAMBANGAN PADA ZONA LISA UTARA PT. AGRO CITY KALTIM KECAMATAN LONG IRAM KABUPATEN KUTAI BARAT PROVINSI KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
ABSTRACT.pdf

Download (60kB) | Preview

Abstract

Pit A dan Pit B merupakan proyek tahun pertama penambangan batubara PT. Agro City Kaltim yang berlokasi di Kecamatan Long Iram, Kabupaten Kutai Barat, Provinsi Kalimantan Timur. Pada Pit A dan Pit B, sumber air yang akan masuk ke dalam tambang berasal dari air hujan maupun air limpasan dari daerah tangkapan hujan disekitar bukaan tambang. Berdasarkan hasil analisis data maka diperoleh data curah hujan rencana sebesar 130,07 mm/hari, intensitas curah hujan sebesar 18,78 mm/jam dengan periode ulang hujan 3 tahun dan resiko hidrogeologi sebesar 94,147 %. Daerah tangkapan hujan pada daerah penelitian dibagi menjadi delapan wilayah, yaitu DTH I = 0,02999 km2, DTH II = 0,06422 km2, DTH III = 0,05012 km2, DTH IV = 0,07564 km2, DTH V = 0,04271 km2, DTH VI = 0,04109 km2, DTH VII = 0,09211 km2 dan DTH VIII = 0,04039 km2. Sistem penyaliran yang direncanakan merupakan kombinasi dari mine drainage dan mine dewatering. Metode mine drainage yang digunakan adalah pembuatan saluran terbuka untuk mencegah air limpasan masuk ke dalam pit. Dimensi saluran terbuka yang direncanakan adalah sebagai berikut: a. Saluran 1 : a = 0,6 m ; b = 0,6 m ; B = 1,2 m ; h = 0,6 m, b. Saluran 2 : a = 0,7 m ; b = 0,7 m ; B = 1,4 m ; h = 0,7 m, c. Saluran 3 : a = 0,6 m ; b = 0,6 m ; B = 1,2 m ; h = 0,6 m, d. Saluran 4 : a = 0,5 m ; b = 0,5 m ; B = 1,0 m ; h = 0,5 m. e. Saluran 5 : a = 0,8 m ; b = 0,8 m ; B = 1,6 m ; h = 0,8 m. Metode mine dewatering yang digunakan adalah pembuatan sumuran yang berfungsi menampung air hujan yang akan masuk ke Pit A. Air hujan yang akan mengalir kedalam tambang dibiarkan mengalir secara alami menuju sump, dengan dimensi panjang sebesar 32,5 m, lebar sebesar 12 m dan kedalaman sebesar 4 m. Air yang sudah tertampung ke dalam sumuran kemudian dipompa menuju saluran terbuka dan dibiarkan mengalir secara alami ke kolam pengendapan. Pompa yang digunakan adalah tipe Multiflo MFC-345. Air pada sumuran Pit A dipompa menuju kolam pengendapan 1 dengan debit 300 m3/jam. Kolam pengendapan yang direncanakan pada tahun pertama penambangan berjumlah tiga kolam dengan dimensi sebagai berikut: a. Kolam pengendapan 1 memiliki panjang 25 m, lebar 15 m dan kedalaman 3 m, b. Kolam pengendapan 2 memiliki panjang 32 m, lebar 15 m dan kedalaman 4 m, c. Kolam pengendapan 3 memiliki panjang 45 m, lebar 25 m dan kedalaman 4 m. Pit A and Pit B are the first project coal mining PT. Agro City Kaltim located in Long Iram district, West Kutai Regency, East Kalimantan Province. In Pit A and Pit B, the water resources that will flow into the pit comes from rain water and run off water from the catchment around pit. Based on the analysis of the obtained data is the plan rainfall is 130.07 mm/day, the intensity of rainfall is 18.78 mm/hour with a 3 year return period rainfall and 94.147% hydrological risks. There are eight catchment area in research located, DTH I = 0.02999 km2, DTH II = 0.06422 km2, DTH III = 0.05012 km2, DTH IV = 0.07564 km2, DTH V = 0.04271 km2, DTH VI = 0.04109 km2, DTH VII = 0.09211 km2 and DTH VIII = 0.04039 km2. Drainage system has planned is a combination of mine drainage and mine dewatering. The mine drainage used is open channel to prevent run off into the pit. Dimensions of open channel are : a. Open Channel 1: a = 0,6 m; b = 0,6 m; B = 1,2 m; h = 0.6 m, b. Open Channel 2: a = 0,7 m; b = 0,7 m; B = 1,4 m; h = 0,7 m, c. Open Channel 3: a = 0,6 m; b = 0,6 m; B = 1,2 m; h = 0,6 m, d. Open Channel 4: a = 0,5 m; b = 0,5 m; B = 1,0 m; h = 0,5 m. e. Open Channel 5: a = 0,8 m; b = 0,8 m; B = 1,6 m; h = 0,8 m The mine dewatering used is make the sump to hold of rainwater that flow into the Pit A. The rain water will have flowed into the pit and flow naturally into the sump. Dimensions of the sump has a lenght of 32.5 m, a width of 12 m and a depth of 4 m, Water will have filled into the sump and then will have pumped to the open channel and flow naturally into sedimen ponds. Pump used are the type Multiflo MFC-345. The water in the sump Pit A will have pumped into sedimen pond 1 with 300 m3 / hour flowrate. There are 3 sedimen ponds has planned in the first year mining with dimensions are: a. Sedimen ponds 1 has a length of 25 m, a width of 15 m and a depth of 3 m, b. Sedimen ponds 2 has a length of 32 m, a width of 15 m and a depth of 4 m, c. Sedimen ponds 3 has a length of 45 m, a width of 25 m and a depth of 4 m.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 20 May 2016 04:07
Last Modified: 20 May 2016 04:07
URI: http://eprints.upnyk.ac.id/id/eprint/1905

Actions (login required)

View Item View Item