Daerah Gumelar merupakan daerah prospek bijih emas yang baik. Pada saat
ini telah berlangsung kegiatan penambangan yang dilakukan secara tambang rakyat
oleh warga masyarakat sekitar. Kegiatan penambangan tersebut dilakukan dengan
membentuk kelompok-kelompok yang terdiri dari 6-10 orang. Rancangan teknis
penambangan di daerah Gumelar belum pernah dibuat sehingga menyebabkan
pengelolaan kegiatan penambangan kurang terkoordinasi dan produksi tidak stabil.
Rancangan penambangan merupakan tahap penting dalam operasi penambangan.
Oleh karena itu, rancangan penambangan sangat diperlukan agar kegiatan
penambangan yang dilakukan memperoleh hasil yang optimal.
Berdasarkan data uji laboratorium mekanika batuan, dapat diketahui
karakteristik mekanika batuan yang terdapat di daerah Gumelar, yaitu (a) bijih/ore
zone memiliki nilai Rock Mass Rating (RMR): 59 % masuk golongan moderate, (b)
hanging wall memiliki nilai Rock Mass Rating (RMR): 62 % masuk golongan strong,
(c) footwall memiliki nilai Rock Mass Rating (RMR): 67 % masuk golongan strong.
Dari hasil pengamatan yang dilakukan, metode penambangan yang sesuai dengan
kondisi topografi dan geologi di daerah Gumelar adalah metode gophering.Pemilihan
metode ini disesuaikan dengan keadaan endapan yang berupa spotty deposits
sehingga penambangan tidak dapat dilakukan dengan skala industri. Berdasarkan
rancangan yang dibuat diperoleh cadangan terkira sebesar 33 kg Au. Metode
penambangan yang diterapkan menggunakan sistem penyanggaan agar keamanan
dalam bekerja lebih terjamin.
Penyanggaan yang digunakan yaitu penyangga kayu agar lebih mudah
mengetahui apabila penyangga kurang kuat dari retakan yang ditimbulkan. Kegiatan
penambangan yang dilakukan membutuhkan investasi modal yang tidak sedikit. Pada
kegiatan tambang bawah tanah terdapat biaya awal yang merupakan biaya persiapan
penambangan yaitu perhitungan biaya sebelum dimulai kegiatan penambangan.
Berdasarkan hal itu maka diperlukan koperasi penambang rakyat agar lebih mudah
dalam permodalan sebelum melakukan kegiatan penambangan.

Gumelar area is an area of good prospects of gold ore. At this time the mining
activity has been going on artisanal mining is done by citizens around. Mining
activities are carried out by forming groups consisting of 6-10 people. Technical
design Gumelar mining in the area has not been made resulting in poorly
coordinated management of mining activities and production unstable. Draft mining
is an important step in mining operations. Therefore, the draft mining is necessary
for mining activities conducted to obtain optimal results.
Based on laboratory test data of rock mechanics, rock mechanics
characteristics can be known of the region Gumelar, namely (a) the ore / ore zone
has a value of Rock Mass Rating (RMR): 59% is included in the moderate group, (b)
the hanging wall has a value of Rock Mass Rating (RMR): 62% belonging to the
strong, (c) the footwall has a value of Rock Mass Rating (RMR): 67% belonging to
the strong. From the results of observations made, the appropriate mining method
with topography and geology of Gumelar is gophering method. The selection of the
method is adapted to the circumstances in the form of spotty sediment deposits that
mining can not be done with an industrial scale. Based on their designs obtained
probable reserves of 33 kg Au. Mining methods are applied using a support system in
working order security is guaranteed.
Support of timber is used to make it easier to know when the support is less
robust than that induced cracks. Mining activities are conducted requires a large
capital investment. In underground mining activities there are initial cost which mean
the cost of preparation of mining, namely the calculation of the cost before the work
begins. Based on that it would require cooperative artisanal miners for easy capital
before mining operations.
Keywords: gophering, reserves, support, cost.

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 20 May 2016 01:47
Last Modified: 20 May 2016 01:47
URI: http://eprints.upnyk.ac.id/id/eprint/1789

Actions (login required)

View Item View Item