OPTIMALISASI KERJA ALAT GALI MUAT EXCAVATOR KOMATSU PC4000-6 UNTUK PENGUPASAN TANAH PENUTUP PADA PENAMBANGAN BATUBARA DI PT. ADARO INDONESIA KALIMANTAN SELATAN

SOURIFET, I MADE EDO (2014) OPTIMALISASI KERJA ALAT GALI MUAT EXCAVATOR KOMATSU PC4000-6 UNTUK PENGUPASAN TANAH PENUTUP PADA PENAMBANGAN BATUBARA DI PT. ADARO INDONESIA KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
ABSTRACT.pdf

Download (7kB) | Preview

Abstract

PT. Adaro is one of the coal mining located in South Borneo. The mining method wich is used by PT. Adaro Indonesia is surface mining. One of the concequences of surface mining is the uncovered of the soil cover (overburden) caused by unloaded insitu materials. The unloading of the soil cover materials activities are done by blasting. The overburden loading in Paringin Pit using mechanical devices. On March, 2014 the overburden loading at low wall using Excavator Komatsu PC 4000-06 with bucket capacity of 22 m3 Loading target of the overburden is 1.350 bcm/hour. The production of the mechanical devices based on the research are, the Excavator Komatsu PC 4000-6 EXKM 41002 produces 1.208,78 BCM/hour, EXKM 41003 produces 1.243,69 BCM/hour, EXKM 41005 produces 1.194,56 BCM/hour. While the theoritical result from the field condition which considering the correction factor and the convertion factor are, EXKM 41002 produces 1.214,49 BCM/jam, EXKM 41003 1.267,99 produces BCM/jam, EXKM 41005 1.203,96 produces BCM/jam. The way to increase the production of the overburden in order to reach the target is, optimalizing the mechanical device by technical correction so the cycle time could be optimal and the correction of work efficiency by pressing the time. After doing the improvement, the loading capacity was increased. It can be seen from the theoritical loading capacity for EXKM 41002 from 1.214,49 BCM/hour increase to 1.394,79 BCM/hour, EXKM 41003 from 1.267,99 BCM/hour increase to 1.398,04 BCM/hour, EXKM 41005 1.203,96 BCM/hour increase to 1.402,7 BCM/hour. And the loading target of 1.350 bcm/hour has complete.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 18 May 2016 03:53
Last Modified: 18 May 2016 03:53
URI: http://eprints.upnyk.ac.id/id/eprint/1387

Actions (login required)

View Item View Item