BARGAWA, Waterman Sulistyana (2008) Penjadwalan Produksi (Mine Scheduling) pada Perancangan Teknis Penambangan Batubara secara Tambang Terbuka. Prosiding Seminar Nasional Kabumian. pp. 221-230. ISSN 978-602-8206-31-0
|
Text
Kajian_Penjadwalan_Produksi_Pada_Perancangan_Tambang_Terbuka_Batubara.pdf Download (5MB) | Preview |
Abstract
The subject discussed in this paper deal with production planning, or more specifically, how the result of mine scheduling may relate back to short-range planning and final pit design. The items discussed here are: mine design, push back, overburden and coal, relationship to mine design and mine scheduling with computer methods
Item Type: | Article |
---|---|
Subjects: | Q Science > QE Geology |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Mathematics |
Depositing User: | Dr.Ir.MT WATERMAN BARGAWAN SULISTYANA |
Date Deposited: | 13 Oct 2017 08:33 |
Last Modified: | 13 Oct 2017 08:33 |
URI: | http://eprints.upnyk.ac.id/id/eprint/13202 |
Actions (login required)
View Item |