BARGAWA, Waterman Sulistyana (2008) Penjadwalan Produksi (Mine Scheduling) pada Perancangan Teknis Penambangan Batubara secara Tambang Terbuka. Prosiding Seminar Nasional Kabumian. pp. 221-230. ISSN 978-602-8206-31-0
| Preview | Text Kajian_Penjadwalan_Produksi_Pada_Perancangan_Tambang_Terbuka_Batubara.pdf Download (5MB) | Preview | 
Abstract
The subject discussed in this paper deal with production planning, or more specifically, how the result of mine scheduling may relate back to short-range planning and final pit design. The items discussed here are: mine design, push back, overburden and coal, relationship to mine design and mine scheduling with computer methods
| Item Type: | Article | 
|---|---|
| Subjek: | Q Science > QE Geology | 
| Divisions: | LPPM - Lembaga Penelitian dan Pengabdian kepada Masyarakat | 
| Depositing User: | Dr.Ir. MT WATERMAN BARGAWAN SULISTYANA | 
| Date Deposited: | 13 Oct 2017 08:33 | 
| Last Modified: | 07 Aug 2025 01:33 | 
| URI: | http://eprints.upnyk.ac.id/id/eprint/13202 | 
Actions (login required)
|  | View Item |