PENGENDALIAN PERSEDIAAN BAHAN BAKU MEMPERTIMBANGKAN BACKORDERMENGGUNAKAN METODE QDENGAN KENDALA LUAS GUDANG UNTUK MEMINIMUMKAN TOTAL BIAYA PERSEDIAAN (Studi Kasus di PT. Dina Akrimna, Kalimantan Timur)

LIBRARY, AGILSEPTIAN (2015) PENGENDALIAN PERSEDIAAN BAHAN BAKU MEMPERTIMBANGKAN BACKORDERMENGGUNAKAN METODE QDENGAN KENDALA LUAS GUDANG UNTUK MEMINIMUMKAN TOTAL BIAYA PERSEDIAAN (Studi Kasus di PT. Dina Akrimna, Kalimantan Timur). Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of 7. Abstrak.pdf]
Preview
Text
7. Abstrak.pdf

Download (88kB) | Preview
[thumbnail of Agil-skripsi-jadi-satu.pdf] Text
Agil-skripsi-jadi-satu.pdf
Restricted to Repository staff only

Download (3MB)

Abstract

PT. DINA AKRIMNA merupakan perusahaan yang memproduksi bata ringan
jenis CLC (Cellular Lightweight Concrete). Permasalahan yang dihadapi perusahaan
adalah sering terjadi perubahan permintaan produk secara tiba-tiba dari customer, oleh
karena itu perlu pengendalian persediaan agar bahan baku tidak overstock dan stockout
terutama bahan baku semen dan foam agent. Namun kendala dari perusahaan adalah
luas gudang yang terbatas, sehingga pemesanan bahan baku harus dilakukan dengan
memperhatikan lot pemesanan terhadap luas gudang. Banyaknya jumlah persediaan
bahan baku yang di simpan dalam gudang akan membuat biaya pengadaan persediaan
yang harus dikeluarkan perusahaan akan semakin besar. Adanya permasalahan tersebut
harus membuat perusahaan memperhitungkan total biaya persediaan dan banyaknya
persediaan di gudang secara kontinyu agar mendapatkan hasil perhitungan yang benar,
serta harus memesan kembali secara tepat sesuai dengan kebutuhan dan kapasitas dari
gudang.
Untuk mengatasi permasalahan tersebut, salah satu metode yang digunakan
adalah Metode Q (Continous Review System) serta dengan metode pengali lagrange
untuk membantu perhitungan terhadap kendala luas gudang. Diharapkan pengendalian
persediaan ini mampu membantu perusahaan dalam memenuhi permintaan yang
probabilistik serta meminimalkan total biaya pembelian.
Hasil perhitungan untuk bahan baku semen yang optimal yaitu lot pemesanan
900 unit, periode pemesanan setiap 22 hari, serta total biaya persediaan minimum
sebesar Rp 77.680.200. Sementara hasil perhitungan untuk bahan baku foam agent yang
optimal yaitu lot pemesanan 14 unit, periode pemesanan setiap 44 hari, serta total biaya
persediaan minimum sebesar Rp 4.784.950.

Kata Kunci: Persediaan Bahan Baku, Backorder, Kendala Luas Gudang, Lagrange,
Metode Q

ix

x

ABSTRACT

PT. DINA AKRIMNA is a company that manufactures light brick type of CLC
(Cellular Lightweight Concrete). The problem faced by the company are frequent
changes in product demand suddenly from a customer, therefore it needs to control of the
inventory of the raw materials in order not to overstock and stockout mainly raw
materials of cement and foam agent. However, the constraints of the company is
limitation the warehouse area, so reservations of raw materials must be done by paying
attention to the warehouse capacity. A large amount of raw material inventory stored in
the warehouse will make the cost of procurement of inventory that must be issued by the
company will cost much. The existence of these problems should make companies reckon
total cost of inventory and the amount of inventory in the warehouse continuously in
order to get the correct calculation, and should be ordered back precisely to the needs
and capacity of the warehouse.
To solve that problems, one of method used is the method Q (Continuous Review
System) as well as the lagrange multiplier method to support the calculation of the broad
constraints warehouse. Expected inventory control can help companies to fulfilling
demand probabilistic and minimize total cost of the purchase.
Results of calculation for optimal cement raw materials are lots ordering 900
units, ordering period every 22 days, and the minimum total inventory cost Rp
77,680,200. While the results of the calculation for foam raw materials optimal agent is
booking a lot of 14 units, ordering period every 44 days, and the minimum total inventory
cost Rp 4,784,950.

Keywords: Raw Material Inventory, backorder, Warehouse Area Constraints,
Lagrange, Method Q

Item Type: Thesis (Other)
Subjects: H Social Sciences > HD Industries. Land use. Labor
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 17 May 2016 02:18
Last Modified: 11 Oct 2022 03:54
URI: http://eprints.upnyk.ac.id/id/eprint/1097

Actions (login required)

View Item View Item