EVALUASI METODE PENGGALIAN SHORT FACE KAPAL KERUK 11 KARIMATA DALAM UPAYA PENINGKATAN LAJU PEMINDAHAN TANAH PADA PENAMBANGAN TIMAH ALLUVIAL DI LAUT MATRAS BANGKA PT.TIMAH (Persero) Tbk.

ARTENSENA, TRIAN (2016) EVALUASI METODE PENGGALIAN SHORT FACE KAPAL KERUK 11 KARIMATA DALAM UPAYA PENINGKATAN LAJU PEMINDAHAN TANAH PADA PENAMBANGAN TIMAH ALLUVIAL DI LAUT MATRAS BANGKA PT.TIMAH (Persero) Tbk. Other thesis, UPN "VETERAN" YOGYAKARTA.

[thumbnail of ABSTRACT.pdf]
Preview
Text
ABSTRACT.pdf

Download (84kB) | Preview

Abstract

This research was conducted in Dredges 11 Karimata PT. Timah Tbk,
Matras, Bangka regency. Dredgers 11 Karimata has a target rate of transfer of
land overburden 820 m
3
/h and on land leaded to 400 m3 / h while the realization
of the field in May the rate of transfer of land per hour can be achieved on the top
soil is 763,6 m
3
/h while for leaded soil reaches only 376 m
3
/h, in this case a layer
of soil excavation was leaded by land leaded excavations did not reach production
excavation company. Production of subsoil excavation was leaded by leaded soil
can be improved by changing methods of excavation and pull wire speed side.
The method used in the dredges 11 Karimata is a method of short face to the
ground layer is not leaded and leaded coating. Short face methods can not meet
the production target excavation company.
The steps can increase the rate of removal of land are:
1 Changing the method of extracting the layers was leaded by the method of
extracting long face while land leaded method is replaced by a combination
method (method long face and short face method), replacement method of
research is increasing the rate of soil removal was leaded from 800 m
3
/h to
840 m
3
/h and leaded soil layer increased from 376 m
3
/h to 387,9 m
3
/h,
because leaded soil layer has not reached the target rate of removal of land
that is leaded 400 m
3
/h, then made an effort to improve the speed of the wire
pull side.
2 Increase the speed of the drop wire on the side of leaded soil layer when using
long face can increase the rate of transfer of land to the land of leaded than
376 m
3
/h to 416.2 m
3
/h while using a combination of methods.
Land transfer rate can be improved by changing the method of excavation and
pull wire speed side.
Keyword: dredge, long face, short face

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Darsini Darsini
Date Deposited: 12 May 2016 07:21
Last Modified: 12 May 2016 07:21
URI: http://eprints.upnyk.ac.id/id/eprint/777

Actions (login required)

View Item View Item