KHAIRUNNISA, PUTRI AMANDA (2025) STRATEGI PEMELIHARAAN MESIN FILLING UNTUK MEMINIMASI DOWNTIME DENGAN RELIABILITY CENTERED MAINTENANCE II (RCM II) DAN AGE REPLACEMENT (Studi Kasus pada PT Bintang Toedjoe, Jakarta Timur). Skripsi thesis, UPN Veteran Yogyakarta.
| ![[thumbnail of 1_Skripsi full_122210101_Putri Amanda Khairunnisa.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text 1_Skripsi full_122210101_Putri Amanda Khairunnisa.pdf Restricted to Repository staff only Download (6MB) | 
| ![[thumbnail of 2_Cover_122210101_Putri Amanda Khairunnisa.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text 2_Cover_122210101_Putri Amanda Khairunnisa.pdf Download (170kB) | 
| ![[thumbnail of 3_Abstrak_122210101_Putri Amanda Khairunnisa.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text 3_Abstrak_122210101_Putri Amanda Khairunnisa.pdf Download (203kB) | 
| ![[thumbnail of 4_Halaman Pengesahan_122210101_Putri Amanda Khairunnisa.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text 4_Halaman Pengesahan_122210101_Putri Amanda Khairunnisa.pdf Download (312kB) | 
| ![[thumbnail of 5_Daftar Isi_122210101_Putri Amanda Khairunnisa.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text 5_Daftar Isi_122210101_Putri Amanda Khairunnisa.pdf Download (203kB) | 
| ![[thumbnail of 6_Daftar Pustaka_122210101_Putri Amanda Khairunnisa.pdf]](http://eprints.upnyk.ac.id/style/images/fileicons/text.png) | Text 6_Daftar Pustaka_122210101_Putri Amanda Khairunnisa.pdf Download (166kB) | 
Abstract
ABSTRAK 
Kegiatan perawatan mesin merupakan aspek penting dalam menjamin 
kelancaran operasional fasilitas produksi. Proses produksi di PT Bintang Toedjoe 
mengalami hambatan akibat kerusakan pada mesin filling merek Ilapak yang 
beroperasi dalam 3 shift sehingga meningkatkan risiko kegagalan tak terencana 
yang akan mengakibatkan downtime mesin. Selama periode Januari 2024 hingga 
Januari 2025, tercatat 752 kejadian kegagalan tak terencana pada 12 unit mesin 
dengan total downtime (durasi kegagalan tak terencana) mencapai 1.958,61 jam. 
Mesin Ilapak 11 menjadi penyumbang tertinggi dengan 96 kejadian dan durasi 
327,83 jam (16,74% dari total durasi downtime 12 mesin filling Ilapak). Meskipun 
perusahaan telah menerapkan pemeliharaan berbasis waktu, masih diperlukan 
strategi pemeliharaan yang lebih terukur dan berbasis data guna menekan downtime 
dan meningkatkan keandalan mesin. 
Penelitian ini menerapkan pendekatan Reliability Centered Maintenance II 
(RCM II) dan Age Replacement untuk merancang strategi perawatan mesin filling 
Ilapak 11. Analisis dilakukan melalui FMEA dan RCM decision worksheet untuk 
menentukan jenis tindakan perawatan, sementara metode Age Replacement 
digunakan untuk menetapkan interval penggantian komponen secara optimal guna 
mengurangi downtime dan menjaga keandalan mesin. 
Hasil pengolahan data mengidentifikasi lima komponen mesin filling Ilapak 
11 dengan mode kegagalan berbeda yang direkomendasikan untuk tindakan 
scheduled discard task. Penerapan strategi pemeliharaan pencegahan berbasis RCM 
II dan Age Replacement pada lima komponen tersebut secara keseluruhan berhasil 
mengurangi downtime dan meningkatkan keandalan mesin dengan penurunan 
downtime sebesar dari 66,02 jam menjadi 37,87 jam (turun 42,64%). Penurunan ini 
menunjukkan bahwa strategi penggantian terjadwal mampu mengatasi kegagalan 
pada komponen kritikal sehingga mencegah gangguan mendadak yang berdampak 
pada keberlangsungan proses produksi. 
Kata kunci: Pemeliharaan pencegahan, Reliability Centered Maintenance II, Age 
replacement, FMEA, Penggantian komponen terencana. 
xiv 
Filling Machine Maintenance Strategy to Minimize Downtime with 
Reliability Centered Maintenance II (RCM II) And Age Replacement 
ABSTRACT 
Machine maintenance activities are an important aspect in ensuring the 
smooth operation of production facilities. The production process at PT Bintang 
Toedjoe experienced obstacles due to damage to the Ilapak filling machine, which 
operates in 3 shifts, thereby increasing the risk of unplanned failures that would 
result in machine downtime. During the period from January 2024 to January 2025, 
there were 752 instances of unplanned failures across 12 machines, resulting in a 
total downtime of 1,958.61 hours. The Ilapak 11 machine contributed the highest 
number of incidents with 96 occurrences and a duration of 327.83 hours (16.74% 
of the total downtime duration of the 12 Ilapak filling machines). Although the 
company has implemented time-based maintenance, a more measurable and data
driven maintenance strategy is still needed to reduce downtime and improve 
machine reliability. 
This study applied the Reliability Centered Maintenance II (RCM II) and 
Age Replacement approaches to design a maintenance strategy for the Ilapak 11 
filling machine. Analysis was conducted using FMEA and RCM decision 
worksheets to determine the type of maintenance actions, while the Age 
Replacement method was used to establish optimal component replacement 
intervals to reduce downtime and maintain machine reliability. 
Data processing identified five components of the Ilapak 11 filling machine 
with different failure modes that were recommended for scheduled discard tasks. 
The implementation of RCM II and Age Replacement-based preventive 
maintenance strategies on these five components successfully reduced downtime 
and improved machine reliability, with a decrease in downtime from 66.02 hours to 
37.87 hours (a 42.64% reduction). This reduction indicates that the scheduled 
replacement strategy is capable of addressing failures in critical components, 
thereby preventing sudden disruptions that impact the continuity of the production 
process. 
Keywords: Preventive maintenance, Reliability Centered Maintenance II, Age 
replacement, FMEA, schedule discard task
 xv
| Item Type: | Tugas Akhir (Skripsi) | 
|---|---|
| Uncontrolled Keywords: | Preventive maintenance, Reliability Centered Maintenance II, Age replacement, FMEA, schedule discard task | 
| Subjek: | H Social Sciences > HD Industries. Land use. Labor | 
| Divisions: | Fakultas Teknik Industri > (S1) Teknik Industri | 
| Depositing User: | Eko Yuli | 
| Date Deposited: | 15 Sep 2025 06:24 | 
| Last Modified: | 15 Sep 2025 07:48 | 
| URI: | http://eprints.upnyk.ac.id/id/eprint/43683 | 
Actions (login required)
|  | View Item |