PUTRA, MONANG APRINDA (2024) STRATEGI PENGADAAN DENGAN MEMPERTIMBANGKAN RISIKO, FLUKTUASI HARGA, DAN WAKTU PENGIRIMAN (Studi Kasus pada CustomJersey.id, Sleman). Other thesis, UPN Veteran Yogyakarta.
Text
1. Skripsi Fulltext_122200108_Monang Aprinda Putra.pdf Restricted to Repository staff only Download (10MB) |
|
Text
2. Cover_122200108_Monang Aprinda Putra.pdf Download (107kB) |
|
Text
3. Abstrak_122200108_Monang Aprinda Putra.pdf Download (47kB) |
|
Text
4. Lembar Pengesahan_122200108_Monang Aprinda Putra.pdf Download (847kB) |
|
Text
5. Daftar Isi_122200108_Monang Aprinda Putra.pdf Download (66kB) |
|
Text
6. Daftar Pustaka_122200108_Monang Aprinda Putra.pdf Download (181kB) |
Abstract
xiii
ABSTRAK
CustomJersey.Id merupakan UMKM yang bergerak di industri konveksi di
Yogyakarta. Hingga saat ini, perusahaan masih melakukan pengadaan secara
jangka pendek setiap minggunya. Hal ini berdampak pada biaya pengadaan yang
tinggi, risiko kegagalan pengadaan yang tinggi, dan ketidakpastian pasokan yang
bisa menghambat produksi. Salah satu faktor yang menyebabkan perusahaan belum
mencoba mengubah pola pengadaannya adalah ketidakberanian mengambil risiko
jika pengadaan dilakukan dalam jangka panjang. Penelitian ini bertujuan
memberikan saran kepada perusahaan dalam menentukan strategi pengadaan
dengan mempertimbangkan fluktuasi harga dan waktu pengiriman serta analisis
risiko pasokan terhadap perusahaan. Penelitian ini membahas pemilihan strategi
pengadaan yang terbagi dalam tiga kelompok, yaitu strategi pengadaan jangka
pendek, jangka panjang, serta campuran jangka pendek dan jangka panjang. Dalam
penelitian ini, dilakukan perbandingan antara manfaat, biaya, dan risiko yang terkait
dari setiap strategi. Penggunaan metode Simulasi Monte Carlo diharapkan dapat
mewakili tingkat ketidakpastian dari kedua variabel. Cost-Benefit Analysis
digunakan untuk menghitung aspek ekonomi dalam menentukan Net Present Value
(NPV) terbaik, dan analisis risiko suplai pengadaan menggunakan Risk Matrix
Chart untuk menentukan strategi pengadaan dengan risiko terkecil. Dari
perhitungan Cost-Benefit Analysis, strategi pengadaan jangka panjang 2 bulan (LT-
2) adalah strategi pengadaan terbaik dengan nilai NPV terbesar. Dari perhitungan
analisis risiko suplai, strategi pengadaan campuran jangka panjang 1 bulan dan
jangka pendek 2 minggu (MT-1/2) adalah strategi pengadaan terbaik dengan nilai
tingkat risiko terkecil. Secara keseluruhan, strategi pengadaan terbaik yang
mempertimbangkan aspek manfaat (benefit), biaya (cost), serta analisis risiko suplai
pengadaan adalah strategi pengadaan campuran jangka panjang 1 bulan dan jangka
pendek 1 minggu (MT-1).
Kata kunci : Cost-Benefit Analysis, Risk Matrix Chart, Simulasi Monte Carlo,
Strategi Pengadaan.
xiv
ABSTRACT
CustomJersey.Id is a small and medium-sized enterprise (SME) operating
in the garment industry in Yogyakarta. Until now, the company has been conducting
short-term procurement on a weekly basis. This has resulted in high procurement
costs, a high risk of procurement failure, and supply uncertainty that can hinder
production. One of the factors preventing the company from changing its
procurement pattern is the reluctance to take risks associated with long-term
procurement. This study aims to provide recommendations to the company in
determining procurement strategies by considering price fluctuations and delivery
times, as well as supply risk analysis for the company. The study discusses the
selection of procurement strategies divided into three categories: short-term
procurement, long-term procurement, and a mix of short-term and long-term
procurement. In this study, a comparison is made between the benefits, costs, and
risks associated with each strategy. The use of Monte Carlo Simulation is expected
to represent the level of uncertainty of the two variables. Cost-Benefit Analysis is
used to calculate the economic aspects in determining the best Net Present Value
(NPV), and supply risk analysis uses the Risk Matrix Chart to determine the
procurement strategy with the smallest risk. From the Cost-Benefit Analysis
calculations, the long-term procurement strategy of 2 months (LT-2) is the best
procurement strategy with the largest NPV. From the supply risk analysis
calculations, the mixed long-term procurement strategy of 1 month and short-term
procurement of 2 weeks (MT-1/2) is the best procurement strategy with the lowest
risk level. Overall, the best procurement strategy considering the aspects of
benefits, costs, and supply risk analysis is the mixed long-term procurement
strategy of 1 month and short-term procurement of 1 week (MT-1).
Keywords : Cost-Benefit Analysis, Monte Carlo Simulation, Procurement
Strategy, Risk Matrix Chart
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Cost-Benefit Analysis, Monte Carlo Simulation, Procurement Strategy, Risk Matrix Chart |
Subjects: | H Social Sciences > HD Industries. Land use. Labor |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Yuli |
Date Deposited: | 24 Jul 2024 03:05 |
Last Modified: | 24 Jul 2024 03:05 |
URI: | http://eprints.upnyk.ac.id/id/eprint/40377 |
Actions (login required)
View Item |