SETTING FLEET BERDASARKAN KAJIAN PRODUKSI ALAT GALI MUAT DAN ANGKUT UNTUK MENCAPAI TARGET PRODUKSI OVERBURDEN DI PT MITRA INDAH LESTARI, PROJECT SITE PT LANNA HARITA INDONESIA, KALIMANTAN TIMUR

PERMADI, FAJAR (2024) SETTING FLEET BERDASARKAN KAJIAN PRODUKSI ALAT GALI MUAT DAN ANGKUT UNTUK MENCAPAI TARGET PRODUKSI OVERBURDEN DI PT MITRA INDAH LESTARI, PROJECT SITE PT LANNA HARITA INDONESIA, KALIMANTAN TIMUR. Other thesis, UPN Veteran Yogyakarta.

[thumbnail of 1. Skripsi Fulltext_112200048_Fajar Permadi.pdf] Text
1. Skripsi Fulltext_112200048_Fajar Permadi.pdf
Restricted to Repository staff only

Download (10MB)
[thumbnail of 2. Cover_112200048_Fajar Permadi.pdf] Text
2. Cover_112200048_Fajar Permadi.pdf

Download (93kB)
[thumbnail of 3. Abstrak_112200048_Fajar Permadi.pdf] Text
3. Abstrak_112200048_Fajar Permadi.pdf

Download (207kB)
[thumbnail of 4. Lembar Pengesahan_112200048_Fajar Permadi.pdf] Text
4. Lembar Pengesahan_112200048_Fajar Permadi.pdf

Download (450kB)
[thumbnail of 5. Daftar Isi_112200048_Fajar Permadi.pdf] Text
5. Daftar Isi_112200048_Fajar Permadi.pdf

Download (211kB)
[thumbnail of 6. Daftar Pustaka_112200048_Fajar Permadi.pdf] Text
6. Daftar Pustaka_112200048_Fajar Permadi.pdf

Download (172kB)

Abstract

iv
RINGKASAN
PT Mitra Indah Lestari atau PT MIL adalah kontraktor penambangan. PT MIL
membantu perusahaan owner dalam melakukan tahap operasi produksi. PT MIL
menggunakan sistem tambang terbuka dengan metode backfill. Pada bulan Februari
2024, kegiatan pengupasan overburden hanya memenuhi 87,27% target produksi
overburden. Hal ini disebabkan penggunaan nilai acuan produktivitas alat gali muat
dan alat angkut yang tidak sesuai dengan kondisi aktual. Selain itu, jenis material
overburden yaitu: clay, sand, mud, dan top soil juga mempengaruhi produktivitas
alat gali muat dan alat angkut. Oleh karena itu dalam pembuatan rekomendasi
setting fleet diperlukan nilai produktivitas alat gali muat dan alat angkut yang
aktual. Pembuatan rekomendasi setting fleet bertujuan untuk mencapai target
produksi overburden. Target produksi overburden tersebut yaitu sebesar 955.447,8
BCM per bulan. Terdapat dua rekomendasi setting fleet untuk memenuhi target
produksi overburden bulan April 2024 yaitu setting fleet Plan A dan setting fleet
Plan B. Total produksi overburden pada rekomendasi setting fleet Plan A sebesar
1.061.504,4 BCM per bulan. Total produksi tersebut memenuhi 111,1% target
produksi overburden bulan April 2024. Sedangkan total produksi overburden pada
rekomendasi setting fleet Plan B sebesar 1.048.941,3 BCM per bulan. Total
produksi tersebut memenuhi 109,79% target produksi overburden bulan April 2024.
Setting fleet Plan A memiliki produksi overburden lebih besar sehingga
direkomendasikan bagi perusahaan untuk menggunakan rekomendasi setting fleet
tersebut.
v
SUMMARY
PT Mitra Indah Lestari or PT MIL is mining contractor that help mining owner in
operation production activity. PT MIL use surface mining system with backfill
method. Overburden removal activity on February 2024 only achieved 87,27% from
overburden production target. It happened because using digger and hauler
productivity that did not correspond to actual conditions. Besides that, type of
overburden material there are: clay, sand, mud, and top soil that influence digger
and hauler productivity. Therefore to make setting fleet recommendation is needed
digger and hauler productivity that actual conditions. Making setting fleet
recommendation having purpose to achieve overburden production target that is
955.447,8 BCM every month. There are 2 setting fleet recommendations to achieve
overburden production target on April 2024 there are Plan A and Plan B. Total
overburden production on Plan A a number 1.061.504,4 BCM every month or
achieve 111,1% overburden production target on April 2024. While total
overburden production target on Plan B a number 1.048.941,3 BCM every month
or achieve 109,79% overburden production target on April 2024. Highly
recommended for this company to use Plan A as setting fleet because having bigger
overburden production.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 11 Jul 2024 02:21
Last Modified: 11 Jul 2024 02:21
URI: http://eprints.upnyk.ac.id/id/eprint/40210

Actions (login required)

View Item View Item