UTOMO, BERBUDI SATRIO (2011) RANCANGAN TEKNIS PENIMBUNAN BATUAN PENUTUP PADA PIT X BLOCK CK (CENTRAL KAWI) UNTUK MENCEGAH TERJADINYA AIR ASAM TAMBANG PT. MARUNDA GRAHAMINERAL PROVINSI KALIMANTAN TENGAH. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
abstrak.pdf Download (40kB) | Preview |
Text
Daftar_pustaka.pdf Download (81kB) |
|
Text
Daftar_Isi.pdf Download (39kB) |
|
Text
full.pdf Restricted to Repository staff only Download (1MB) |
Abstract
PT. Marunda Grahamineral merupakan salah satu perusahaan pertambangan dalam bidang
penambangan batubara yang terletak di Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi
Kalimantan Tengah. Proses penambangan PT. Marunda Grahamineral menggunakan sistem
penambangan tambang terbuka dengan metode backfilling yang secara langsung dan tidak langsung
dapat merusak ekosistem disekitar lokasi penambangan itu sendiri. Air asam tambang terbentuk akibat
terjadinya proses oksidasi antara mineral sulfida, air dan udara, sehingga harus dilakukan pencegahan
agar tidak terjadi kontak antara ketiga elemen tersebut. Pencegahan yang dapat dilakukan adalah
dengan melakukan penanganan terhadap batuan penutup yang berpotensi pembentuk asam. Lokasi
penambangan ini berpotensi menimbulkan air asam tambang dikarenakan terdapat batuan penutup
lokasi Pit X yang mempunyai pH < 5. Analisa pembentukan air asam tambang dilakukan dengan cara
mengkorelasikan titik bor dan mencocokkan dengan indikasi yang telah ada pada saat study kelayakan
,batuan penutup diklasifikasikan menjadi 3 kelompok yaitu : topsoil tidak pembentuk asam sebanyak
65455.06 LCM batuan penutup yang berpotensi asam sebanyak 33902.22 LCM dan batuan penutup
yang tidak berpotensi asam sebanyak 503638.46 LCM. Non Acid Forming (NAF) merupakan
material-material yang tidak berpotensi menyebabkan air asam tambang sedangkan Potentially Acid
Forming (PAF) merupakan material-material yang berpotensial menghasilkan air asam tambang.
Faktor pertimbangan dalam menentukan cara penimbunan: a. ketersediaan batuan penutup tidak
pembentuk asam yang lebih dominan yaitu sebesar 78,3 % dimungkinkan untuk menerapkan
gabungan metode ini. b. mempertimbangkan matrial yang dibongkar terlebih dahulu, hal ini dilakukan
agar mineral sulfida yang terkandung dalam material PAF tidak bereaksi dengan air dan udara yang
akan menyebabkan timbulnya Air Asam Tambang. Cara penimbunan yang diusulkan untuk batuan
penutup pit X block CK(Central Kawi) adalah Cara penanganan batuan penutup adalah metode
penutupan pada batuan penutup yang berpotensi menghasilkan air asam ditutup atau dilapisi dengan
lapisan yang sedikit atau tidak menghasilkan air asam. Metode yang digunakan yaitu penggabungan
antara Penutup batuan NAF setebal 2 meter dipadatkan. Cara ini di digunakan karena menggunakan
bahan pelapis dari material tambang itu sendiri. Lokasi penimbunan berada pada tiga tempat yaitu
Topsoil1 ,Topsoil2 dan Disposal1. Lokasi untuk menimbun maetial PAF dan NAF ditempatkan pada
1 tempat agar memudahkan penimbunan, topsoil akan di bagi menjadi 2 tempat karna untuk spreading
topsoil elevasi sudah mencukupi 150 mdpl.
ABSTRACT
PT Marunda Grahamineral is one of coal mine company which the location is Kecamatan Laung
Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah. Mining process PT.Marunda
Grahamineral applies surface mining system and backfilling method. Backfilling method is filling ex
pit coal with material overburden from it self . Acid mine drainage can happen because oxidation
process between sulfide material, water and air with the result we must stop the process between
sulfide material,water, air in order to three element can not contact directly. Passive method is
dumping overburden with right way until can minimize acid mine drainage happened.The mine
location is Pit X block Central kawi.That mine location is potential to make acid mine drainage
because overburden in location have pH < 5. Analysis classifaying potential acid mine drainage Mine
has the potential to cause acid mine drainage because there is a rock cover of X Pit locations that have
a pH <5. Analysis of the formation of acid mine drainage is done by correlating the drill point and the
match with an indication of which already exist in the current feasibility study, the cover rocks are
classified into 3 groups: topsoil is not as much acid-forming overburden 65455.06 LCM with a
potentially sour as much 33902.22 LCM and rock cover potentially not as much acid LCM
503638.46. Non Acid Forming (NAF) are materials that are not potentially cause acid mine drainage
while the Potentially Acid Forming (PAF) are materials that can potentially generate acid mine
drainage. How to hoarding being done to pit overburden X block CK (Central Kawi) is the way the
handling of overburden rock is a method of closing the lid that could potentially generate acid water
covered or coated with a layer of water produces little or no acid. This is done with consideration of
the availability of acid-forming overburden not more dominant in the amount of 78.3% is possible to
apply a combination of these methods and also consider the matrial is disassembled first, this is done
so that the sulfide minerals contained in the PAF material does not react with water and air which will
cause acid Mine Water. The method used is a merger between the cover rocks as thick as 2 feet
compacted NAF and NAF. Both are in use because it uses material from the material coating the mine
itself. Landfill located at three places namely Topsoil1, Topsoil2 and Disposal1. Locations for
stockpiling maetial PAF and NAF was placed on a site in order to facilitate stockpiling, topsoil will be
in for a second place for the spreading topsoil because sufficient elevation 150 mdpl.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Yuli |
Date Deposited: | 10 Jun 2016 01:50 |
Last Modified: | 19 May 2023 08:15 |
URI: | http://eprints.upnyk.ac.id/id/eprint/3520 |
Actions (login required)
View Item |