MANURUNG, RIKY AGUSETIAWAN (2022) RATIO PENIMBUNAN ANTARA MATERIAL LUNAK DAN MATERIAL KERAS UNTUK MEMENUHI PRODUKSI DISPOSAL PADA SITE LATI MINE OPERATION PT. BERAU COAL, KALIMANTAN TIMUR. Other thesis, UNSPECIFIED.
Text
Cover Skripsi_Riky A M_112180024.pdf Download (304kB) |
|
Text
Daftar Isi_Riky A M_112180024.pdf Download (392kB) |
|
Text
Daftar Pustaka_Riky A M_112180024.pdf Download (535kB) |
|
Text
Draft Skripsi_Riky Agusetiawan Manurung_112180024.pdf Restricted to Repository staff only Download (8MB) |
|
Text
lembar pengesahan_Riky A M_112180024.pdf Download (223kB) |
|
Text
Abstrak_Riky A M_112180024.pdf Download (597kB) |
Abstract
vi
SUMMARY
The study was conducted at PT. Berau Coal, Lati Mine Operation site which is
located in the district of Gunung Tabur, Berau, East Kalimantan province starting
from September 2nd of 2021 to Desember 31th 0f 2021.
The overburden stripping activity by PT. Berau Coal as the owner uses
conventional methods for mining activities, namely using a combination of loading
an unloading equipment and transportatioon equipment. The digging tools uses are
the Excavator 2000 and the Caterpillar 777D hauling equipment.
One of the mining stages is to excavate and fill the overburden (OB) layer. OB
material is transported to the dumping or disposal location for dumping until it
reaches the final dump condition in accordance with the plan that has been made
previously covering the area, shape and elevation of the stockpile.
The dumping ratio from the current evaluation is soft material 1 : 3,55 hard
material. In this PQRT pit area by considering the need for hard material or
blasting material, where in the PQRT pit for hard materials the volume is very
limited with a lot of soft material at the top that must be removed first. The hard
material is very necessary to be used as dumping material in front loading swamp
areas, ex-disposal areas that are redisturb, dumping soft materials in disposal
areas and material for layering on mining roads.
This study analyzes the activities of ratio dumping in the disposal area. This
research is intended so that the results of the dumping ratio in the disposal area
are in accordance with company standards, namely soft material 1 : 3 hard
material. Thus, excess soft material can be transferred to Channel Dump. This
research can be completed properly and on time. The results of the research on the
comparison between soft and hard materials can be used as evaluation material by
the company owner.
Based on the results of the study, it was found that the production of Excavator
PC2000 from the front to channel dump was 20.474 BCM/Month and the
production of Excavator PC2000 from the front to the disposal was
20.861 BCM/Month. Meanwhile, the production of HD-777 from the front to
channel dump is 18.715,5 BCM/Month and the production of HD-777 from front to
disposal is 14.392 BCM/Month.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | Eko Yuli |
Date Deposited: | 25 Oct 2022 07:06 |
Last Modified: | 25 Oct 2022 07:06 |
URI: | http://eprints.upnyk.ac.id/id/eprint/31483 |
Actions (login required)
View Item |