Penjadwalan Produksi (Mine Scheduling) pada Perancangan Teknis Penambangan Batubara secara Tambang Terbuka

BARGAWA, Waterman Sulistyana (2008) Penjadwalan Produksi (Mine Scheduling) pada Perancangan Teknis Penambangan Batubara secara Tambang Terbuka. In: Prosiding Seminar Nasional FTM UPNVYYogyakarta 5 Agustus 2008 (221-230), 5 Agustus 2008, Yogyakarta.

[img]
Preview
Text
2008-semnas-ftm-penjadwalan produksi pada perancangan teknis penambangan batubara secara tambang terbuka_joz.pdf

Download (945kB) | Preview

Abstract

The subject discussed in this paper deal with production planning, or more specifically, how the result of mine scheduling may relate back to short-range planning and final pit design. The items discussed here are: mine design, push back, overburden and coal, relationship to mine design and mine scheduling with computer method

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Dr.Ir.MT WATERMAN BARGAWAN SULISTYANA
Date Deposited: 22 May 2019 06:14
Last Modified: 22 May 2019 06:16
URI: http://eprints.upnyk.ac.id/id/eprint/19595

Actions (login required)

View Item View Item