RANCANGAN TAMBANG BAWAH TANAH PADA URAT BIJIH EMAS DI DAERAH GUMELAR KABUPATEN BANYUMAS PROVINSI JAWA TENGAH

ASMAN, MUHAMMAD A’ANG ARIFIN (2014) RANCANGAN TAMBANG BAWAH TANAH PADA URAT BIJIH EMAS DI DAERAH GUMELAR KABUPATEN BANYUMAS PROVINSI JAWA TENGAH. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
ABSTRAK.pdf

Download (11kB) | Preview

Abstract

Daerah Gumelar merupakan daerah prospek bijih emas yang baik. Pada saat ini telah berlangsung kegiatan penambangan yang dilakukan secara tambang rakyat oleh warga masyarakat sekitar. Kegiatan penambangan tersebut dilakukan dengan membentuk kelompok-kelompok yang terdiri dari 6-10 orang. Rancangan teknis penambangan di daerah Gumelar belum pernah dibuat sehingga menyebabkan pengelolaan kegiatan penambangan kurang terkoordinasi dan produksi tidak stabil. Rancangan penambangan merupakan tahap penting dalam operasi penambangan. Oleh karena itu, rancangan penambangan sangat diperlukan agar kegiatan penambangan yang dilakukan memperoleh hasil yang optimal. Berdasarkan data uji laboratorium mekanika batuan, dapat diketahui karakteristik mekanika batuan yang terdapat di daerah Gumelar, yaitu (a) bijih/ore zone memiliki nilai Rock Mass Rating (RMR): 59 % masuk golongan moderate, (b) hanging wall memiliki nilai Rock Mass Rating (RMR): 62 % masuk golongan strong, (c) footwall memiliki nilai Rock Mass Rating (RMR): 67 % masuk golongan strong. Dari hasil pengamatan yang dilakukan, metode penambangan yang sesuai dengan kondisi topografi dan geologi di daerah Gumelar adalah metode gophering.Pemilihan metode ini disesuaikan dengan keadaan endapan yang berupa spotty deposits sehingga penambangan tidak dapat dilakukan dengan skala industri. Berdasarkan rancangan yang dibuat diperoleh cadangan terkira sebesar 33 kg Au. Metode penambangan yang diterapkan menggunakan sistem penyanggaan agar keamanan dalam bekerja lebih terjamin. Penyanggaan yang digunakan yaitu penyangga kayu agar lebih mudah mengetahui apabila penyangga kurang kuat dari retakan yang ditimbulkan. Kegiatan penambangan yang dilakukan membutuhkan investasi modal yang tidak sedikit. Pada kegiatan tambang bawah tanah terdapat biaya awal yang merupakan biaya persiapan penambangan yaitu perhitungan biaya sebelum dimulai kegiatan penambangan. Berdasarkan hal itu maka diperlukan koperasi penambang rakyat agar lebih mudah dalam permodalan sebelum melakukan kegiatan penambangan. Gumelar area is an area of good prospects of gold ore. At this time the mining activity has been going on artisanal mining is done by citizens around. Mining activities are carried out by forming groups consisting of 6-10 people. Technical design Gumelar mining in the area has not been made resulting in poorly coordinated management of mining activities and production unstable. Draft mining is an important step in mining operations. Therefore, the draft mining is necessary for mining activities conducted to obtain optimal results. Based on laboratory test data of rock mechanics, rock mechanics characteristics can be known of the region Gumelar, namely (a) the ore / ore zone has a value of Rock Mass Rating (RMR): 59% is included in the moderate group, (b) the hanging wall has a value of Rock Mass Rating (RMR): 62% belonging to the strong, (c) the footwall has a value of Rock Mass Rating (RMR): 67% belonging to the strong. From the results of observations made, the appropriate mining method with topography and geology of Gumelar is gophering method. The selection of the method is adapted to the circumstances in the form of spotty sediment deposits that mining can not be done with an industrial scale. Based on their designs obtained probable reserves of 33 kg Au. Mining methods are applied using a support system in working order security is guaranteed. Support of timber is used to make it easier to know when the support is less robust than that induced cracks. Mining activities are conducted requires a large capital investment. In underground mining activities there are initial cost which mean the cost of preparation of mining, namely the calculation of the cost before the work begins. Based on that it would require cooperative artisanal miners for easy capital before mining operations. Keywords: gophering, reserves, support, cost.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 20 May 2016 01:47
Last Modified: 20 May 2016 01:47
URI: http://eprints.upnyk.ac.id/id/eprint/1789

Actions (login required)

View Item View Item