Penjadwalan Produksi (Mine Scheduling) pada Perancangan Teknis Penambangan Batubara secara Tambang Terbuka

BARGAWA, Waterman Sulistyana (2008) Penjadwalan Produksi (Mine Scheduling) pada Perancangan Teknis Penambangan Batubara secara Tambang Terbuka. Prosiding Seminar Nasional Kabumian. pp. 221-230. ISSN 978-602-8206-31-0

[img]
Preview
Text
Kajian_Penjadwalan_Produksi_Pada_Perancangan_Tambang_Terbuka_Batubara.pdf

Download (5MB) | Preview

Abstract

The subject discussed in this paper deal with production planning, or more specifically, how the result of mine scheduling may relate back to short-range planning and final pit design. The items discussed here are: mine design, push back, overburden and coal, relationship to mine design and mine scheduling with computer methods

Item Type: Article
Subjects: Q Science > QE Geology
Divisions: Faculty of Engineering, Science and Mathematics > School of Mathematics
Depositing User: Dr.Ir.MT WATERMAN BARGAWAN SULISTYANA
Date Deposited: 13 Oct 2017 08:33
Last Modified: 13 Oct 2017 08:33
URI: http://eprints.upnyk.ac.id/id/eprint/13202

Actions (login required)

View Item View Item