Items where Division is "(S1) Teknik Perminyakan" and Year is 2025
A
ABIMANYU, MALIKA (2025) PERENCANAAN CASING ONE PHASE WELL PADA SUMUR ATV-28 LAPANGAN ARTAVIKA. Skripsi thesis, UPN Veteran Yogyakarta.
AFRIAN, ALUN (2025) EVALUASI SQUEEZE CEMENTING UNTUK MENUTUP ZONA NON-PRODUKTIF PADA SUMUR “ALN” LAPANGAN “AFR”. Skripsi thesis, UPN Veteran Yogyakarta.
AL ARAAF, MUHAMMAD (2025) EVALUASI GRADE CASING PADA TRAJECT LINER OPERASI PEMBORAN LAPANGAN GAS SUMUR “AL-05” LAPANGAN “ARF”. Skripsi thesis, UPN Veteran Yogyakarta.
ARASYID, FADLI (2025) EVALUASI WELLBORE STABILITY PADA SUMUR FA-12 LAPANGAN DLI MENGGUNAKAN PENDEKATAN GEOMEKANIK 1D DARI DATA LOG. Skripsi thesis, UPN "Veteran" Yogyakarta.
Adhitya, Risky (2025) EVALUASI DIRECTIONAL WELL DESIGN M-3 PADA LAPANGAN V MENGGUNAKAN SOFTWARE LANDMARK. Skripsi thesis, UPN "Veteran" Yogyakarta.
Aqil, Rifqi Syafiq (2025) ANALISIS PERFORMA SEMEN PEMBORAN BERKOMPOSISI SODIUM SILICATE. Skripsi thesis, UPN "Veteran" Yogyakarta.
B
BAHUSATYA, VIRYANANDA (2025) PERENCANAAN KAPASITAS RIG PADA OPERASI PEMBORAN SUMUR “VIR-22” LAPANGAN “VB”. Skripsi thesis, UPN "Veteran" Yogyakarta.
BAYHAQI, SAHAL (2025) ANALISA 1D GEOMECHANICAL MODEL PADA EXISTING WELL (SUMUR SB-31 LAPANGAN H). Skripsi thesis, UPN Veteran Yogyakarta.
Baiti, Aisah Nur (2025) ANALISIS PERFORMA DAN FEASIBILITY SOLVENT SYSTEM TREATMENT UNTUK PENANGANAN ORGANIC DEPOSIT PARAFFIN WAX PADA SUMUR HIGH POUR POINT OIL “ASH-127” LAPANGAN “TNT”. Skripsi thesis, UPN "Veteran" Yogyakarta.
E
Ekaris, Gifarry Aradhana (2025) PREDIKSI LAJU PRODUKSI AWAL PASCA WORKOVER PADA SUMUR “Y-05” SEBAGAI DASAR PENAMBAHAN ESTIMATE ULTIMATE RECOVERY (EUR). Skripsi thesis, UPN "Veteran" Yogyakarta.
F
FERDIANSYAH, RICO (2025) PERENCANAAN CEMENTING PLUG & PERMANENT ABANDONMENT METODE BALANCE PLUG CEMENTING PADA SUMUR “RF-01” LAPANGAN “QS”. Skripsi thesis, UPN "Veteran" Yogyakarta.
G
GINTING, PUTRI DWI AURORA (2025) ANALISA KEEKONOMIAN SKENARIO SUMUR PENGEMBANGAN PADA LAPANGAN “PDAG” MENGGUNAKAN SKEMA PRODUCTION SHARING CONTRACT COST RECOVERY. Skripsi thesis, UPN Veteran Yogyakarta.
H
HIDAYAT, AHMAD FAIZ MUZAKKI (2025) OPTIMASI RATE OF PENETRATION (ROP) MENGGUNAKAN ALGORITMA KLASIFIKASI MACHINE LEARNING PADA SUMUR A-3, A-4, DAN A-5 LAPANGAN “AFMH”. Skripsi thesis, UPN "Veteran" Yogyakarta.
HUTAPEA, YOSEPHINE LITHANY ALEXANDER (2025) ANALISIS PENGARUH LINGKUNGAN PENGENDAPAN TERHADAP WELL PLACEMENT OPTIMIZATION MENGGUNAKAN MODEL KONSEPTUAL. Skripsi thesis, UPN Veteran Yogyakarta.
Hanafi, Akira Ataturk Ramadhan (2025) PERENCANAAN PENERAPAN MANAGED PRESSURE DRILLING METODE CONSTANT BOTTOM HOLE PRESSURE PADA SECTION 8 1/2" DAN 6 1/8” SUMUR MSDF-25 LAPANGAN HNF. Skripsi thesis, UPN "Veteran" Yogyakarta.
Hatidame, Adisti Riska (2025) PENENTUAN DESAIN ELECTRIC SUBMERSIBLE PUMP PADA SUMUR BOR (J-TYPE) “AH-025” LAPANGAN “HARS”. Skripsi thesis, UPN "Veteran" Yogyakarta.
I
IHSANTO, HARIS (2025) STUDI LABORATORIUM ANALISA PENGGUNAAN NANOSILICA UNTUK WELLBORE STRENGTHENING PADA MICRON PORE FRACTURE. Skripsi thesis, UPN Veteran Yogyakarta.
M
MAHENDRA, ILHAM (2025) OPTIMASI KINERJA ELECTRIC SUBMERSIBLE PUMP (ESP) SUMUR PRODUKSI “IM-01” PADA LAPANGAN “CZA”. Skripsi thesis, UPN "Veteran" Yogyakarta.
MARPAUNG, YOKI FAHMI (2025) INTERPRETASI LOG UNTUK MENENTUKAN ZONA PROSPEK PADA LAPISAN SHALY SAND SUMUR “Y “ LAPANGAN “MRP”. Skripsi thesis, UPN Veteran Yogyakarta.
MARYADI, FAJAR (2025) ANALISIS KEEKONOMIAN PADA SKENARIO PENGEMBANGAN LAPANGAN MINYAK “YDX” DENGAN SKEMA PSC GROSS SPLIT. Skripsi thesis, UPN Veteran Yogyakarta.
Musthofa, Ricky Ahmad (2025) ANALISA PENYEBAB TERJADINYA KICK DAN PENANGGULANGANNYA PADA SUMUR “RAM-27” LAPANGAN “AHM”. Skripsi thesis, UPN "Veteran" Yogyakarta.
N
NUZLI, MUHAMMAD IQBAL ARRIZQI (2025) PERENCANAAN DIRECTIONAL DRILLING MENGGUNAKAN LANDMARK SOFTWARE UNTUK SUMUR MI-6 PADA BATCH DRILLING SYSTEM LAPANGAN BNG. Skripsi thesis, UPN "Veteran" Yogyakarta.
P
PANJAITAN, ABRAHAM STEVE SAMMER (2025) EVALUASI PENERAPAN METODE BULLHEAD DAN WAIT & WEIGHT SEBAGAI ALTERNATIF DALAM OPERASI WORKOVER PADA SUMUR AP-19 LAPANGAN AP. Skripsi thesis, UPN "Veteran" Yogyakarta.
PARAPAT, BONTOR PARALI FRIJON (2025) PENINGKATAN PEROLEHAN MINYAK DENGAN METODE WATERFLOOD PADA LAPANGAN “BTZ” MENGGUNAKAN SIMULASI RESERVOIR. Skripsi thesis, UPN Veteran Yogyakarta.
PRABOWO, YANUAR (2025) OPTIMASI ELECTRIC SUBMERSIBLE PUMP PADA SUMUR PROBLEM LOW INFLUX MENGGUNAKAN PRESSURE INTAKE (PI) MODE PADA SUMUR BX-06 LAPISAN Z-10 DI PERTAMINA EP FIELD BUNYU. Skripsi thesis, UPN Veteran Yogyakarta.
PRADIPA, IRFAN RIVENDA BAGUS (2025) ANALISIS WELL INTEGRITY DAN USULAN DESAIN TEMPORARY PLUG AND ABANDONMENT PADA SUMUR “IR-23” LAPANGAN “FAN”. Skripsi thesis, UPN Veteran Yogyakarta.
PRATAMA, ALLAN JAVIER (2025) ANALISIS ZONA PROSPEK HIDROKARBON UNTUK MENENTUKAN ESTIMASI CADANGAN MENGGUNAKAN DATA LOG DAN DATA CORE PADA SUMUR “ALN-01” LAPANGAN “JAVIER”. Skripsi thesis, UPN Veteran Yogyakarta.
PRATAMA, NANDA BERKAH (2025) PREDIKSI NATURAL GAS MOVEMENT DALAM ANULUS SEMEN 9-5/8” DENGAN SIMULATOR RESERVOIR PADA SUMUR “NBP-13” LAPANGAN “NBP” OSES. Skripsi thesis, UPN Veteran Yogyakarta.
PRATIWI, KADEK ANGGITA (2025) PERANCANGAN MONOBORE COMPLETION UNTUK OPTIMISASI WAKTU DAN BIAYA PEMBORAN PADA LAPANGAN WASA SUMUR WS-042. Skripsi thesis, UPN "Veteran" Yogyakarta.
PUTRI, ARINI PRASETYA (2025) STUDI LABORATORIUM PERBANDINGAN EFEKTIVITAS INHIBISI SHALE DARI SISTEM LUMPUR POLYMER. Skripsi thesis, UPN Veteran Yogyakarta.
Pareira, Aldino Yobel (2025) PENENTUAN RATE OF PENETRATION (ROP) MENGGUNAKAN DIAMOND BIT PADA FORMASI KERAS SUMUR “AYP-051” LAPANGAN “BXT”. Skripsi thesis, UPN "Veteran" Yogyakarta.
R
RAMADHANTI, SYIFA KHASYIKIRANA (2025) STUDI LABORATORIUM PERBANDINGAN ADITIF NANOSILIKA DAN KCL SEBAGAI SHALE INHIBITOR PADA SWELLING SHALE. Skripsi thesis, UPN Veteran Yogyakarta.
RAMDHANI, FADLI (2025) PERENCANAAN KONSTRUKSI SUMUR DENGAN MONOBORE SINGLE TRIP COMPLETION UNTUK PENGOPTIMALAN OPERATION TIME & WELL COST PADA SUMUR “FDL” LAPANGAN SEPINGGAN. Skripsi thesis, UPN Veteran Yogyakarta.
RISAKOTTA, LUIS MAIKEL (2025) PERENCANAAN PROGRAM HIGH PERFORMANCE WATER BASED MUD UNTUK MENGATASI MASALAH REAKTIF SHALE DAN LOST CIRCULATION PADA TRAYEK 8 ½ SUMUR “MR-02” LAPANGAN “MOLUCCAN”. Skripsi thesis, UPN Veteran Yogyakarta.
RIZQULLAH, TITO NAUFAL (2025) EVALUASI PELAKSANAAN SQUEEZE CEMENTING UNTUK PENUTUPAN PERFORASI PADA SUMUR “T-24" LAPANGAN "TNR". Skripsi thesis, UPN Veteran Yogyakarta.
Rochman, Figo Hizbulloh (2025) PERENCANAAN DESAIN CASING UNTUK PEMBORAN BERARAH TIPE “S” MENGGUNAKAN METODE MAXIMUM LOAD DENGAN PENDEKATAN SOFTWARE LANDMARK PADA SUMUR “FHR-07” LAPANGAN “YSR”. Skripsi thesis, UPN "Veteran" Yogyakarta.
S
SAHMIN, MUAMMAR FURKAN (2025) PERHITUNGAN LAJU ALIR KRITIS KEPASIRAN UNTUK DESAIN PROGRESSIVE CAVITY PUMP (PCP) PADA SUMUR “MF-1202” LAPANGAN “MIM”. Skripsi thesis, UPN Veteran Yogyakarta.
T
Tuhulele, Nahsya Aprilia (2025) PENENTUAN MODEL MEKANIKA BUMI 1D DAN ANALISIS STABILITAS LUBANG BOR UNTUK SUMUR USULAN P-1. Skripsi thesis, UPN "Veteran" Yogyakarta.
V
VALDANTY, GEVIN (2025) STUDI LABORATORIUM PENGARUH PENGGUNAAN FLY ASH BATU BARA SEBAGAI ADDITIVE TERHADAP SLURRY SEMEN PEMBORAN. Skripsi thesis, UPN Veteran Yogyakarta.
W
WIDODO, KURNIAWAN TRIYO (2025) PERENCANAAN METODE INJEKSI N2 COILED TUBING UNTUK MENGATASI KEGAGALAN START UP ESP PADA SUMUR PPA-003, STRUKTUR PUSPA, LAPANGAN JAMBI. Skripsi thesis, UPN "Veteran" Yogyakarta.
Z
Zayd, Ahmad (2025) ANALISA PENYIMPANAN CO₂ DI SALINE AQUIFER DENGAN PENDEKATAN FULLY IMPLICIT INTEGRATED NETWORK MODELING PADA LAPANGAN “AZ”. Skripsi thesis, UPN "Veteran" Yogyakarta.