Items where Division is "(S1) Teknik Metalurgi" and Year is 0012

Group by: Creators | Item Type | No Grouping
Jump to: Tugas Akhir
Number of items: 1.

Tugas Akhir

Muhammad Syahrul, . (0012) ANALISIS RISIKO KEBOCORAN PIPA HRSG DI PT XYZ MENGGUNAKAN METODE RISK BASED INSPECTION (RBI) SEMI KUANTITATIF. Skripsi thesis, Universitas Pembangunan Nasional Veteran Yogyakarta.

This list was generated on Tue Feb 24 13:39:08 2026 WIB.