PT. Anugerah Bara Kaltim adalah perusahaan yang bergerak di bidang
pertambangan batubara yang terletak di Kecamatan Loa Janan, Kabupaten Kutai
Kartanegara, Provinsi Kalimantan Timur. Sistem penambangan yang digunakan
oleh PT. Anugerah Bara Kaltim adalah sistem tambang terbuka (surface mining)
dengan metode (strip mine), oleh karena itu curah hujan yang tinggi berpotensi
mengganggu operasi penambangan.
Sumber air yang masuk ke lokasi Pit Jatah adalah air hujan dan air
limpasan. Berdasarkan hasil perhitungan data curah hujan yang ada diperoleh
curah hujan rencana sebesar 87,12 mm/hari dan dengan intensitas curah hujan
30,20 mm/jam. Daerah Tangkapan Hujan (DTH) seluas 0,093 km² dengan total
air yang masuk ke lokasi penambangan sebesar 0,313 m³/detik.
Berdasarkan pengamatan di lokasi Pit Jatah PT. Anugerah Bara Kaltim,
diketahui bahwa sistem penyaliran tambang yang ada belum berfungsi dengan
baik. Komponen – komponen sistem penyaliran belum lengkap, dimana volume
sumuran tidak mampu menampung air yang masuk ke lokasi penambangan saat
kondisi hujan serta jenis pompa CF-48H yang digunakan mempunyai efisiensi
yang rendah (58%), sehingga menyebabkan terjadinya genangan air pada lantai
dasar penambangan.
Untuk mengatasi sejumlah air limpasan tersebut, perlu dilakukan suatu
upaya penanggulangan dengan pembuatan saluran terbuka. Saluran terbuka yang
diusulkan berbentuk trapesium sebanyak 2 saluran. Saluran terbuka 1 dibuat pada
DTH I (utara pit) dan saluran terbuka 2 pada DTH II (dalam pit). Gorong –
gorong ditambahkan pada saluran terbuka 1 yang memotong jalan tambang.
Dimensi sumuran yang diusulkan mempunyai panjang 40 m, lebar 50 m,
kedalaman 5 m. Pompa yang digunakan sebanyak 1 unit pompa Multiflo MF-385
dengan debit pompa rencana 522 m³/jam, efisiensinya 63% dan waktu
pemompaan 16 jam/hari.
Adanya usulan perbaikan teknis sistem penyaliran tambang ini diharapkan
dapat digunakan sebagai acuan perusahaan dalam menangani dan mengendalikan
air hujan dan limpasan sehingga kegiatan penggalian batubara tidak terhambat dan
seluruh aktivitas penambangan dapat berjalan secara optimal.
PT. Anugerah Bara Kaltim is a mining company in area located at Loa
Janan Subdistrict, Kutai Kartanegara Regency, East Kalimantan Province. The
mining method which is used by PT. Anugerah Bara Kaltim is the surface mining
with the open pit method. Nevertheless, this method cannot do the mining activity
perfectly when the high rainfall comes. Infact, it can disturb the activity.
The source of water which enter into the Jatah Pit are the rainwater and
run off. Based on the calculation result of rainfall, it obtains the plan rainfall is
87,12 mm/day with the rainfall intensity is about 30,20 mm/hour. The Catchment
Area (DTH) which has the capacious about 0,093 km2 divided into four area with
the water completely entered to the mining location is 0,313 m3/second.
Based on the observation located at Jatah Pit of PT. Anugerah Bara
Kaltim, known that the mine drainage system is not a good function yet. The
components of this drainage system are not comprehensive yet, there is no an
open channel to prevent the run off, volume of the sump cannot absorb the
amount of rainwater that inflow to mine area and CF- pump just has a little actual
efficiency (58%), so it caused the water puddle at the pit bottom.
To overcome that run off, it is needed an effort to solve it. The effort is
making an open channel. Open channel suggested has the trapezium shape
contains of two channel. The first open chanel make at DTH I (at the north of Pit)
and the second open channel at DTH II (in pit). The culvert are added at the
second open channel which cross the ramp. The dimension of sump suggested has
40 m of length, width 50 m, and depth 5 m. It uses 1 unit of Multiflo MF-385
pumps with plan flow rate 522 m3 /hour, the efficiency (63%) and pump times is
16 hours/day.
Hopefully, this suggestion of mine drainage can be used as a reference to
the company in overcoming and managing the rainwater and run off so that the
coal mining activity will be optimal.
Item Type: | Thesis (Masters) |
---|---|
Subjek: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Bugel Suryanta |
Date Deposited: | 17 May 2016 02:24 |
Last Modified: | 17 May 2016 06:46 |
URI: | http://eprints.upnyk.ac.id/id/eprint/971 |
Actions (login required)
![]() |
View Item |