SURYABUANA, MADANY (2016) RANCANGAN AREA REKLAMASI DAN KEBUTUHAN SOIL PADA RENCANA PENAMBANGAN BH2015BP TANPA PHASE 7 PT. NEWMONT NUSA TENGGARA NUSA TENGGARA BARAT. Other thesis, UPN 'VETERAN" YOGYAKARTA.
Preview |
Text
3. RINGKASAN.pdf Download (118kB) | Preview |
Abstract
Adanya kewajiban dari pemerintah untuk menyusun rencana Reklamasi
tahap Operasi Produksi yang telah tercantum dalam perundang – undangan,
menyebabkan begitu pentingnya kriteria keberhasilan dalam suatu kegiatan
reklamasi terpenuhi. Oleh karena itu, sebagai perusahaan tembaga-emas yang
besar, PT. Newmont Nusa Tenggara telah berusaha melaksanakan kaidah
pertambangan yang berwawasan lingkungan, yakni dengan melaksanakan
kegiatan reklamasi pada tahap penambangan tembaga-emas. Kegiatan
penambangan yang berlangsung hanya pada phase 6 akan berakhir di tahun 2017,
selanjutnya tinggal memproses ore yang disimpan di stockpile.
Total target area yang akan direklamasi perusahaan sebesar 40 Ha
pertahunnya. Area yang akan di reklamasi merupakan area yang sudah dalam
keadaan final, yang artinya sudah tidak berdampak lagi oleh aktivitas
penambangan. Area yang akan direklamasi meliputi area timbunan baik pada
daerah Stockpile yaitu di area Sejorong Stockpile maupun pada daerah Waste
Dump yaitu di area East Dump, Ujat, Tongoloka Waste Dump, dan Kanloka
Waste Dump. Area pit tidak akan direklamasi karena tidak dimungkinkan untuk
direklamasi dilihat dari kemiringan bench yang terlalu terjal. Dengan mengetahui
area yang ada, dapat dilakukan perhitungan sehingga didapatkan kebutuhan total
tonase soil yang akan digunakan. Nantinya perhitungan jumlah tonase soil yang
dibutuhkan sangat mempengaruhi soil balanced terakhir.
Jumlah total soil berdasarkan data soil inventory terakhir perusahaan di
bulan Desember 2014 dengan jumlah 37.498 KT dimana jumlah topsoil 4.869 KT
dan subsoil 32.629 KT. Dengan tambahan soil yang dapat diselamatkan (soil
salvage) baik dari inpit maupun outpit sebesar 2.296 KT. Adanya tambahan
sumber soil lain sebesar 4.836 KT didapat dari Barakebo Soil Stockpile dan
seluruh embankment. Dengan jumlah kebutuhan soil untuk reklamasi yang didapat
dari perhitungan sebelumnya sebesar 56.112 KT, maka ending soil balance
menunjukan kekurangan soil sebesar 11.570 KT sampai akhir project ini.
The obligation of the government to develop a plan Reclamation stage
production operation which has been listed in the law - laws, cause so important
criteria for success in a reclamation activities are met. Therefore, as the company's
large copper-gold, PT. Newmont Nusa Tenggara has been trying to implement
environmentally sound mining rules, by carrying out reclamation activities at the
mining stage copper-gold. Mining activities that took place only at phase 6 will
end in 2017, then just process the ore that is stored in the stockpile.
The total target area to be reclaimed companies amounted to 40 ha per
year. Reclamation area to be in an area that is already in the final state, which
means it has no impact anymore by mining activities. The area to be reclaimed
cover both dumping area on the area that is in the area Sejorong Stockpile
Stockpile as well as on local Waste Dump, namely in the area of East Dump, Ujat,
Tongoloka Waste Dump, and Kanloka Waste Dump. The pit area will not be
reclaimed because it is not possible to be reclaimed from the bench slope is too
steep. By knowing the existing area, can be calculated to obtain the total tonnage
of soil that needs to be used. Later the calculation of the amount of tonnage
required soil greatly affects the Last balanced soil
The total amount of soil based on soil inventory data is the last company in
December 2014 with the number 37 498 KT where the amount of topsoil and
subsoil 32 629 4869 KT KT. With the addition of soil that can be saved (soil
salvage) both of inpit and outpit amounted to 2,296 KT. The addition of other soil
resources amounted to 4,836 KT obtained from Barakebo Soil Stockpile and the
entire embankment. With a number of requirements for reclamation soil obtained
from the previous calculation of 56 112 KT, then the soil ending balance shows a
shortage of 11,570 KT soil until the end of this project.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Darsini Darsini |
Date Deposited: | 16 May 2016 01:33 |
Last Modified: | 16 May 2016 01:33 |